1. WHAT IS A CONSTRUCTION MATERIALS SURVEY? WHY IS IT IMPORTANT TO CONDUCT
CANVASSING OF CONSTRUCTION MATERIALS PRICES IN A TIMELY MANNER? UPON YOUR EXPERIENCE IN CONDUCTING SUCH ACTIVITY, WHAT ARE THE CHALLENGES THAT YOU HAD ENCOUNTERED? WHY DO YOU THINK SOME SUPPLIERS ARE HESITANT TO GIVE A LIST OF THEIR PREVAILING PRICES TO THE CANVASSERS?
-CONSTRUCTION MATERIALS SURVEY IS CANVASSING MATERIALS IN DIFFERENT HARDWARE
OR CONSTRUCTION SUPPLIER SO THAT WE CAN KNOW WHO HAS THE CHEAPER PRICE. IT IS IMPORTANT TO CONDUCT CANVASSING OF CONSTRUCTION MATERIAL PRICES IN A TIMELY MANNER SO THAT YOU CAN COMPARE THE PRICES OF EACH MATERIAL IN DIFFERENT CONSTRUCTION SUPPLIER. CONDUCTING THIS KIND OF ACTIVITY IS HARD BECAUSE OF THE PANDEMIC AND SOME MATERIALS ARE NOT AVAILABLE ON OUR SELECTED HARDWARE AND WE NEED TO SEARCH FOR OTHER CONSTRUCTION SUPPLIER. MAYBE THEY THINK THAT WE’RE NOT GONNA ORDER SOME MATERIALS TO THEM AND KNOWING THAT IT’S JUST RELATED TO SCHOOL ACTIVITIES AND THEY CANNOT PROFIT FROM IT.
2. LABOR WAGE RATE - IT IS AN AMOUNT WHICH APPLY TO ALL CONSTRUCTION
WORKER BUT IN DIFFERENT SPECIALIZATION. IT IS ESSENTIAL TO DO CALCULATION TO AVOID PROBLEM’S WHEN MONTHLY PAY’S COME.
3. DESCRIBE THE FOLLOWING:
FOREMAN- SUPERVISES AND DIRECTS OTHER WORKER’S.
LEADMAN- THE LEADER OF THE GROUP OF WORKER AND REPORT’S TO A SUPERVISOR. HIGHLY SKILLED LABOR- ONE WHO IS CAPABLE OF WORKING EFFECIENTLY AND SUPERVISES EFFECIENTLY THE WORK OF SKILLED EMPLOYEES. SKILLED LABOR- HE MUST POSSES A THOROUGH AND COMPREHENSIVE KNOWLEDGE OF THE TRADE, CRAFT OR INDUSTRY IN WHICH HE IS EMPLOYED. SEMI-SKILLED LABOR - HIS WORK IS THUS LIMITED TO THE PERFORMANCE OF ROUTINE OPERATIONS OF LIMITED SCOPE. UNSKILLED LABOR - HIS WORK MAY THUS REQUIRE IN ADDITION TO PHYSICAL EXERTION FAMILIARITY WITH VARIETY OF ARTICLES AND GOODS.
4. WHAT IS HAULING? WHY IS IT IMPORTANT TO INCLUDE HAULING COSTS IN
CALCULATING THE UNIT COST FOR AGGREGATES AND OTHER CONSTRUCTION MATERIALS?
-HAULING IS TO TRANSPORT MATERIALS TO WHERE THE CONSTRUCTION IS LOCATED.
INCLUDING HAULING COST IS IMPORTANT TO AVOID PROBLEMS IN ACTUAL HAULING WORKS.
5. THERE ARE ESTIMATE PRACTICES THAT USE PERCENTAGES OF MATERIALS
PRICES TO DETERMINE THE LABOR COST (E.G., LABOR COST = 40% OF THE MATERIAL COST). WHAT DO YOU THINK ARE THE DISADVANTAGES OF USING SUCH PRACTICE? SITE SOME PRACTICAL EXAMPLES TO JUSTIFY YOUR ANSWER.
-THE DISADVANTAGE OF USING THIS PRACTICE IS THAT TIME FACTOR IS COMPLETELY
IGNORED IF WORKER’S ARE PAID ON PIECE RATE BASIS. FOR EXAMPLE, WHEN A WORKER DOES OVERTIME AND DOESN’T COUNT OR ADD ON HIS PAYCHECK.
6. WHAT IS A DETAILED UNIT PRICE ANALYSIS? EXPLAIN THE IMPORTANCE OF
DUPA IN THE PREPARATION OF THE PROGRAM OF WORKS AND PROJECT SCHEDULING?
-DETAILED UNIT PRICE ANALYSIS IS THE DETERMINATION OF REASONABLE UNIT COST
OF EACH ITEM OF WORK WHICH REFLECTS THE BREAKDOWN SHOWING THE QUANTITIES OF WORK ITEMS, UNIT PRICES OF MATERIALS, EQUIPMENT RENTAL RATES AND DPWH –PRESCRIBES INDIRECT COST INCLUDING TAXES. IT IS IMPORTANT SO THAT BUDGETING IS NOT DIFFICULT IN CONSTRUCTING A BUIDING. 7. WHAT IS A WORK BREAKDOWN STRUCTURE? EXPLAIN THE IMPORTANCE OF PREPARING WBS IN PREPARING CONSTRUCTION ESTIMATES AND PROGRAMS OF WORKS
- WORK BREAKDOWN STRUCTURE IS A METHOD FOR COMPLETING A COMPLEX, MULTI-
STEP PROJECT. IT’S A WAY TODIVIDE AND CONQUERS LARGE PROJECTS TO GET THINGS DONE FASTER AND MORE EFFECIENTLY. WORK BREAKDOWN STRUCTURE IS IMPORTANT TO KNOW WHAT WORKS SHOULD BE DONE AND HOW MUCH FOR EACH WORK.
8. WHY IS SITE/FIELD INSPECTION IMPORTANT IN PROJECT IMPLEMENTATION?
- TO ENSURE THAT WORKFLOWS WITHIN A PROJECT ARE PLANNED ACCORDING TO
REQUIREMENTS, STANDARDS, AND REGULATIONS.
9. WHAT IS A DAILY ACCOMPLISHMENT REPORT? EXPLAIN THE IMPORTANCE OF
PREPARING A DAILY ACCOMPLISHMENT REPORT IN PROJECT IMPLEMENTATION. WHY DO YOU THINK SOME PROJECT ENGINEERS FAIL TO PREPARE SUCH DOCUMENTS DAILY?
DAILY ACCOMPLISMENT REPORT IS A WRITTEN DOCUMENT THAT RECORDS THE
OVERALL PERFORMANCE AND PROGRESS MADE TOWARD FULFILLING THE SPECICIC GOALS AND OBJECTIVES AT THE CONSTRUCTION SITE EVERYDAY. IT IS IMPORTANT TO DO ACCOMPLISHMENT REPORTS TO KNOW IF THERE IS ANY IMPROVEMENTS ON THE WORKS AND WORKER’S, AND TO KNOW THE DURATION OF EACH TASK. ENGINEER’S FAILED TO DO DAILY ACCOMPLISMENT REPORT BECAUSE THEY DO NOT WANT THEIR SUPERIOR TO KNOW IF THERE IS A FAILURE IN THE CONSTRUCTION SITE.
10. LIST OF CRITICAL OF ISSUES ENCOUNTERED IN PROJECTS:
1. LACK OF COMMUNICATION. 2. LACK OF CLEAR GOALS AND SUCCESS CRITERIA. 3. BUDGETIING ISSUES. 4. INADEQUATE SKILLS OF TEAM MEMBERS. 5. LACK OF ACCOUNTABILITY.
ACTION PLANS IN ADDRESSING THIS ISSUES:
1. REGULAR, SHORT STAND-UP MEETING A FEW TIMES WEEKLY CAN GO A LONG WAY IN PREVENTING MISCOMMUNICATION.
2. POPULAR APPROACHES TO GOAL SETTING LIKE SMART AND CLEAR CAN HELP A PROJECT MANAGER COME UP WITH A SET OF EFFECTIVE GOALS RIGHT FROM THE START OF A PROJECT.
3. ADOPT A PROPER BUDGETTING PROCEDURE AND MAKE REALISTIC
ASSUMPTIONS TO AVOID COST OVERRUNS. PLANNING THE PROJECT SCOPE MUST BE DONE KEEPING IN MIND THE BUDGET IN HAND.
4. ASSESS THE AVAILABLE WORKFORCE TO DETERMINE WETHER
ADDITIONALSTAFF AND SKILLSETS ARE REQUIRED OR NOT.
5. HAVING A PROJECT TOOLTHAT ALLOWS RESPONSIBILITIES TO BE ASSIGNED