Leakage current monitor test:
For every phase of the surge arrester the leakage
current monitor is available. The monitors must be calibrated and
tested by injecting milliamps current by sverker. Record the
calibrated values with standard values and its error must be
within the limits of respected manufacturer.
For the Insulation resistance and leakage monitor test the above
mention procedures in single unit can be followed. For the
capacitance and dissipation power factor the following procedures
must be used.