PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
TABLE OF CONTENTS
Page 2
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
1.0 INTRODUCTION
Multilevel car park having GF + 7F & Terrace Floor, structure and other ancillary units with
necessary infrastructures.
1.2 SCOPE
The scope of this report covers the following aspects:
Page 3
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
Altitude : 16 Mtrs
Monsoon : 83 F DB 80 F WB 88%RH
Winter : 65 F DB 57 F WB 60%RH
Indoor air temperature and humidity listed in the design basis will confirm to ASHRAE comfort
recommendations in 2007 ASHRAE Hand book – Fundamentals and ASHRAE Standard 55.
Page 4
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
Exhibition Halls : NC 35 to 40
The world focus has shifted from the Environment to Invironment. This is new terminology,
being used increasingly to focus on the Indoor Air Quality. The indoor air quality goes top list of
concerns. The indoor environment is receiving increased attention, as more information has become
available on the presence and effect of indoor contaminants.
SYSTEM
SI NO AREAS PRE FILTERS BAG FILTERS
DESIGNATOR
EXHIBITION
1
HALLS 75% to 85% 80% to 85%
arrestance 25% dust spot, bag
COMMON to 40% dust cartridge or
2 C1
CORRIDORS spot. Extended electronic
3 LIFT LOBBYS surface cartridge (semi automatic
or bag cleaning)
4 FOOD COURT
Page 5
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
Even though NBC Table 5 Recommended Rate of Air Circulation For Different Areas –
Clause 6.5.1 Toilets 6-10 ACPH, with our past experience we recommend 20 ACPH for Toilet
exhaust system, since the building is densely occupied.
Single stage pressurization is proposed for this project which will operate in case of
emergency only.
Page 6
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
3.4.4 PIPES
Piping shall be sized for the following design parameters:
PER 100FT
3.4.5 DUCTING
Design parameter for duct design shall be:
Page 7
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
c. Lighting
IS 7896 Data for outside design conditions for air conditioning for
Summer months.
Page 8
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
Building elements.
IS 8092 Code for inspection of surface quality of steel castings for valves,
fittings & other piping components.
Page 9
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
insulation materials.
CTI Acceptance test code for water cooling towers, mechanical draft,
natural draft, fan assistant type evaluation of results and thermal
testing of wet and dry cooling towers as per CTI-ATC-105-1990
Page 10
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
Page 11
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS
The following key points are self explicatory for the above selection.
Page 12