Professional Documents
Culture Documents
152
4.0
IL55
523 0
45
We reserve oll ights in this document NEW DRG.
ond in the information contoined there P R PREPARED. DRG.REVISED AS PER CAs BULT DRa. PREPARED RESISRANCE RI
eporduction,us diaclousure to CUENTs cOMMENTS. ADDED.
third parties without orexpress outhority
is sticthy for bidden ABB.
TO m N
(D
EEEEEEEEEE
m
We reserve oll righte in this document(A NEW DRG.
and in the infomotion cantoined here PREPARED.
inReporduction,use
hira p o n e o u t
or discouure
Ounoy
i8 stricty tor bidden ABB.
125 VDC
3s01 310n3
N3d0 310N3
N 125 VDC
N
- -
23 U23 23 24 U24
24 55 U55 55 56 U56 5 6
25 U25 25 26 U26 26 57 US7 57 58 U5858
39 U39 39 72 U72 72
40 U 4 0 40
71U71 71
41 U41 41 42 U42 42
73U73 73 74 U74/4
AUX-S
1ONO+10NC (DOUBLE DECKER ASSEMBLY)
9.5...17.5 9.5.17.5
Isrminoof Aux. Switch Contacts D
23-24/27-28/31-32/35-36 (NC Contact)
55-56/59-60/63-64/67-688
41-42/73-74 (Early Make Contact)
Ground Terminal
UK 5-TWIN-PE
WT9TET1PI1E1|8ll4
|76161
sos
D
eleleleleLIC
Meion TERMINAL ARRANGEMENT DRAWN: PSN CHECKED: RJS TAPPRD. RJS Motor Operating Mechanism MT-50 4
*|
MOTOR OPERATED MECHANISM NO.
A206/12/07 C|2007/03/14
IB2007/01/18 D2007/03/2 TYPE MT-50 ABB ABBLimited 1HYD900361-311 4
2 5 6 7 8