You are on page 1of 6

NILE DRILL TECH LIMITED

Scope of Work: Nation wide


Head Office: Plot 31608, Navy Estate Junction, Karshi Abuja.
Mobile: +234 8123000055 | +234 8077770066.

HYDRO GEOPHYSICAL EXPLORATION REPORT

Date: 17-09-2020 Referred by: DIRECT CLIENT

Location: FAKON IDI TALATA MAFARA

Client Name: UNICEF

Client’s contact:

Note: Request you to spend your Valuable time to go through

1.0 Introduction:

Nile drill tech was established in the year 2010 with a major purpose of providing good, qualitative
and sustainable water. Nile Drill Tech is the major sponsor and development partner of Nirek Nile
Foundation, an NGO dedicated to the provision of portable water to less privileged.

2.0 DRILLING EQUIPMENT

We use good and qualitative material to ensure your borehole is drilled successfully.

 We drill in both basement and sedimentary terrain (Air and Mud drilling).
 The diameter of our boreholes range from 61/2 inch to 8 inch in basement terrain with
maximum depth of 350 meter and 200 meters.
 Thickness of casing we used ranged from 4mm, 4.5mm, 5mm, 5.7mm and 6.7mm etc.

The points mentioned above are used to calculate the cost of drilling with its installation of the borehole.

1|Page
NILE DRILL TECH LIMITED

3.0 Geology and Hydrogeology


The geology of the site is made up of Basement Complex rocks which consist essentially of Granite-Gneiss
and Migmatite rocks overlain with laterites. The target aquifers in the basement complex are the weathered and
the fractured basement. However, potable water in this area could be seldom gotten from the loosed part of the
terrain (overburden), the weathered basement, but majorly from the fractures/fissures in rocks.

4.0 Methodology

A reconnaissance of the geologic setting of the terrian is the primary survey carried out by the close
observation of the rock exposures in the terain. The approach of data collection and questionairing is deployed
to understand the background hydrogeologic history of the area. The geophysical survey which is the process
of acquiring data on the site in view is being carried out by the approach of Electrical Resistivity Method using
the Ohmega Booster Resistivity meter. The procedure followed uses the Schlumberger configuration. The data
collected on site is processed and interpreted using the IpI2Win software. The data are presented in the graphs
in the below section. We do our best to address the technical challenges during the geophysical survey such as;

 Space constraints
 Very hard or Loose soil
 Buried cables or pipes, the plan or design of the area to be surveyed.

2|Page
NILE DRILL TECH LIMITED

5.0 Data Presentation

The below graphs are the resultant of the processed data gotten from the survey

VES 1

3|Page
NILE DRILL TECH LIMITED

5.1 INTERPRETATION: Base on the geology of the area it inferred to have a thick overburden of 20-25
meters. The target aquifers which are the Weathered/fractured rocks are seen from the depths of 30m-80m

5.2 LITHOLOGICAL LOG

Depth Resistivit Inferred Lithology Inference Inferred Depth


(m) y (Ω/m) Yield Recommended
0-2.5 31.2 Top Soil Saturated

2.5-25 211 Weathered Basement Saturated


LOW- 80 Meters
25-100 18.1 Fractured Basement Saturated MODERATE

>80 65.2 Fresh Basement Saturated

5.3 Recommendation: VES 1

DESIGN: The Borehole should be FULLY CASED. The hole should be well gravel packed and where
necessary it should be grouted.

CONCLUSION AND RECOMMENDATION

 From qualitative and quantitative analysis, four geo-electric layers are identified. The layers identified
include (but are not restricted to) the first layer which indicates the top soil, the second layer which
indicates the weathered basement (comprising of clay/mica), the third layer represent the highly

4|Page
NILE DRILL TECH LIMITED
weathered/ fractured basement (water bearing section) and finally the fourth layer represents the fresh
basement.

 VES 1 is recommended for drilling.

 The main limitation of any geophysical investigation is that it doesn’t show the object of interest (such
as water, hydrocarbon or any mineral deposit) directly. Thus, there is no geophysical investigation
technique that completely shows the occurrence of the target resource. One of the essence of a hydro-
geophysical investigation is to minimize financial losses associated with drilling blindly.

 NOTE: On your plot, we located a spot with geological anomalies that may be as a result of
groundwater or the mineral constituents of the rock. This makes it difficult to give you 100%
guarantee whether you will get water but we are inferring a 70% success chance.

Geophysicist Name ……………………………

Geophysicist Signature ………………………..

FIELD CHECK LIST

1. PURPOSE OF BOREHOLE DOMESTIC

2. ROAD ACCESSIBILITY GRADE GOOD

3. DISTANCE TO SITE (KM/HOURS)

4. NO. OF BRIDGES & THICKNESS ABSENT

5. DRAINAGE(S) ABSENT

6. NEPA WIRES / BURIED CABLES PRESENT

7. SOAK-AWAY ABSENT

8. BURIED PIPES ABSENT

9. ABORTIVE BOREHOLE ABSENT

10. SURVEY EQUIPMENT USED/SERIAL OHMEGA BOOSTER RESISTIVITY METER

5|Page
NILE DRILL TECH LIMITED
NO. BN S/N: 0133

PAYMENT RECEIPT/AGREEMENT
11.
DETAILS

12. NAME(S) OF GEOLOGISTS

13. OTHER OBSERVATIONS

14. REPORT PREPARED BY KENNETH

6|Page

You might also like