Task-1 - CNT NY OA - 20211104
Task-1 - CNT NY OA - 20211104
System
4G 1800
4G 2100
4G 900
4G TDD
5G L2100
Total Result
Count - PMOUniq
Detail SOW
Add BBU, Add UMPT, Add UBBP, Add RRU5502
Add Cabinet, Add BBU, Add RRU, Add UMPT, Add UBBP, Add Antenna
Add Cabinet, Add BBU, Add RRU, Swap Antenna, Reloc UBBP, Reloc UMPT
Add Cabinet, Add BBU, Add RRU5905, Add Antenna, Add UBBP from Donor, Add UMPT from Donor
Add Cabinet, Add BBU, Add UMPT, Add UBBP, Add RRU5905, Add Antenna from WH, Add Filter
Add Cabinet, Add BBU, Add UMPT, Add UBBP, Add RRU5905, Add Antenna, Add Filter
Add Cabinet, Add BBU5900, Add UMPT, Add UBBP, Add RRU5502, Add Antenna
Add Cabinet, BBU, Add RRU,
Add RRU5513
Add UBBP
Add UBBP, Add RRU5502
Add UBBPg2, Add RRU5258, Swap Antenna to ASI 12 Port
Add UMPT, Add UBBP
Add UMPT, Add UBBP, Add RRU5502
Dismanlte DAS & Indoor EQP, Reloc to Donor
Dismantle UBBP
OK, Change Cab+BBU, Change UMPT, Add UBBP, Add RRU
OK, Change UMPT, Add UBBP
SW Only
Swap Antenna 3 ASI4518R42v06
Total Result
Count - PMOUniq
CAPEX Program
CAPEX #1B Settlement IX 2021 Part 2
CAPEX Program New Infra Cherry Pick & Exploit Untapped 2021
CP Core 5G KELAPAGADING
Total Result
Subcon
Detail SOW G1 GCI NW POCA Trial Site Total Result
4 1 1 6
Add Cabinet, Add BBU5900, 1 1
Add Cabinet, BBU, Add RRU, 1 1
Add RRU5513 2 2
Dismanlte DAS & Indo 1 1
OK, Change UMPT, A 1 1
1 3 4
Dismantle UBBP 1 1
SW Only 2 2
Swap Antenna 3 ASI4518R42 1 1
1 5 2 8
Add Cabinet, Add BBU, Add RRU, Add UMPT, 1 1
Add Cabinet, Add BBU, Add RRU, S 1 1
Add Cabinet, Add BBU, Add RRU5905, Add A 1 1
Add Cabinet, Add BBU, Add UMPT, 1 1
Add Cabinet, Add BB 1 3 4
2 2
Add UBBPg2, Add RRU5258, S 1 1
OK, Change Cab+BBU, Chan 1 1
7 7
Add BBU, Add UMPT, Add UBBP, Add RRU5502 1 1
Add UBBP 3 3
Add UBBP, Add RRU5502 1 1
Add UMPT, Add UBBP 1 1
Add UMPT, Add UBBP, Add RRU5502 1 1
5 4 6 2 10 27
Subcon
G1 GCI NW POCA Trial Site Total Result
1 1
1 1
1 1
1 1
1 1
1 3 4
1 1
1 1
2 2
3 3
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
2 2
1 1
5 4 6 2 10 27
Subcon
Detail SOW G1 GCI NW POCA Trial Site Total Result
2 2 4
Add RRU5513 2 2
Add UBBPg2, Add RRU5258, S 1 1
Swap Antenna 3 ASI4518R42 1 1
1 1
Add Cabinet, Add BBU, Add RRU, S 1 1
1 1
Dismanlte DAS & Indo 1 1
1 1
OK, Change UMPT, A 1 1
4 4
Add UBBP 3 3
Add UBBP, Add RRU5502 1 1
6 6
Add BBU, Add UMPT, Add UBBP, Add RRU5502 1 1
Add UMPT, Add UBBP 1 1
Add UMPT, Add UBBP, Add RRU5502 1 1
Dismantle UBBP 1 1
SW Only 2 2
1 1
Add Cabinet, BBU, Add RRU, 1 1
1 1
Add Cabinet, Add BBU, Add RRU, Add UMPT, 1 1
1 1
Add Cabinet, Add BBU5900, 1 1
1 4 5
Add Cabinet, Add BBU, Add UMPT, 1 1
Add Cabinet, Add BB 1 3 4
1 1
Add Cabinet, Add BBU, Add RRU5905, Add A 1 1
1 1
OK, Change Cab+BBU, Chan 1 1
5 4 6 2 10 27
Count - PMOUniq Subcon
Status CNT G1 GCI NW POCA Trial Site Total Result
35. Monitoring KPI 2 2 4 10 18
36. Alarm 2 2 2 1 7
60. On Going Checking 1 1 2
Total Result 5 4 6 2 10 27
PMOUniq_DU ID_Site ID Impl Area PMOUniq
JKT-28722-28724-1_BKS751_L1800_NC_28722-28724_BKS751 JKT-28722-28724-1
JKT-4200004840-12_JSX977_L1800_R_4840_JSX977 INNER JKT-4200004840-12
JKT-000918210009AJ-3_SRG272_L1800_NC_DN_Jabo_SRG272 OUTER JKT-000918210009AJ-3
JKT-4100000155-7_KRW256_L900_N_DN_155_KRW256 INNER JKT-4100000155-7
JKT-000918210009AJ-2_CLG112_L1800_NC_DN_Jabo_CLG112 OUTER JKT-000918210009AJ-2
JKT-000918210009AL-1_CBN550_L2300_NC_DN_Jabo_CBN550 OUTER JKT-000918210009AL-1
JKT-000918210022TX-4_JKT069_L2300_NC_Jabo_JKT069 INNER JKT-000918210022TX-4
JKT-000918210009AU-1_CBN523_L1800_N_DN_Jabo_CBN523 OUTER JKT-000918210009AU-1
JKT-000918210009AK-1_BKX395_L2100_NC_DN_Jabo_BKX395 INNER JKT-000918210009AK-1
JKT-4100000155-6_KRW252_L900_N_DN_155_KRW252 INNER JKT-4100000155-6
JKT-000918210006AE-5_JUX067_L900_N_Jabo_JUX067 INNER JKT-000918210006AE-5
JKT-4100000155-10_KRW258_L900_N_DN_155_KRW258 INNER JKT-4100000155-10
JKT-4100000155-16_PWK085_L900_N_DN_155_PWK085 INNER JKT-4100000155-16
JKT-4100000155-2_KRW263_L900_N_DN_155_KRW263 INNER JKT-4100000155-2
JKT-28678-28680-2_JSX796_L1800_NC_28678-28680_JSX796 INNER JKT-28678-28680-2
JKT-000918210007AS-11_TGR551_L900_N_Jabo_TGR551 OUTER JKT-000918210007AS-11
JKT-000918210009AV-5_CBN500_L900_N_DN_Jabo_CBN500 INNER JKT-000918210009AV-5
JKT-000918210045TX-10_JSX959_L2100_NC_Jabo_JSX959 INNER JKT-000918210045TX-10
JKT-000918210045TX-7_JSX959_NR2100_NC_Jabo_JSX959 INNER JKT-000918210045TX-7
JKT-000918210045TX-9_JSX581_L2100_NC_Jabo_JSX581 INNER JKT-000918210045TX-9
JKT-000918210045TX-8_JSX277_L2100_NC_Jabo_JSX277 INNER JKT-000918210045TX-8
JKT-000918210045TX-6_JSX581_NR2100_NC_Jabo_JSX581 INNER JKT-000918210045TX-6
JKT-000918210045TX-5_JSX277_NR2100_NC_Jabo_JSX277 INNER JKT-000918210045TX-5
JKT-000918210045TX-4_JKU747_NR2100_NC_Jabo_JKU747 INNER JKT-000918210045TX-4
JKT-000918210045TX-3_JKU626_NR2100_NC_Jabo_JKU626 INNER JKT-000918210045TX-3
JKT-000918210045TX-2_JKU062_NR2100_NC_Jabo_JKU062 INNER JKT-000918210045TX-2
JKT-000918210045TX-1_JKU005_NR2100_NC_Jabo_JKU005 INNER JKT-000918210045TX-1
DU ID Site ID ImpSite Name SOW Detail SOWStatus CNT
BKS751_L1800_NC_28722-28724 BKS751 SUMMAREC 4G LampsitOK, Chang 35. Monitoring KPI
JSX977_L1800_R_4840 JSX977 HTLJWMAR4G RelocatDismanlte 35. Monitoring KPI
SRG272_L1800_NC_DN_Jabo SRG272 SRG272MM4G NEW-18Add RRU5536. Alarm
KRW256_L900_N_DN_155 KRW256 KLARI 4G NEW-90Add Cabine36. Alarm
CLG112_L1800_NC_DN_Jabo CLG112 E_CLG112M 4G NEW-18Add RRU5560. On Going Checking
CBN550_L2300_NC_DN_Jabo CBN550 E_CBN550M 4G NEW-23Add UBBPg2 35. Monitoring KPI
JKT069_L2300_NC_Jabo JKT069 MASJIDAL New Site L OK, Chang 35. Monitoring KPI
CBN523_L1800_N_DN_Jabo CBN523 SMAN1CIB4G NEW-18Add Cabine36. Alarm
BKX395_L2100_NC_DN_Jabo BKX395 E_BKX395M 4G NEW-21Swap Anten36. Alarm
KRW252_L900_N_DN_155 KRW252 KARAWANG 4G New-90Add Cabine35. Monitoring KPI
JUX067_L900_N_Jabo JUX067 ELANGLAU4G New-90Add Cabine35. Monitoring KPI
KRW258_L900_N_DN_155 KRW258 PEDES_PA 4G New-90Add Cabine35. Monitoring KPI
PWK085_L900_N_DN_155 PWK085 SMKN1DAR4G New-90Add Cabine35. Monitoring KPI
KRW263_L900_N_DN_155 KRW263 Cikarang C 4G New-90Add Cabine36. Alarm
JSX796_L1800_NC_28678-28680 JSX796 AEONMALL4G New-18Add Cabine36. Alarm
TGR551_L900_N_Jabo TGR551 TALOKKRES4G NEW-90Add Cabine36. Alarm
CBN500_L900_N_DN_Jabo CBN500 CIPEUCAN 4G New-90Add Cabine60. On Going Checking
JSX959_L2100_NC_Jabo JSX959 Toloteluks 4G NEW-21SW Only 35. Monitoring KPI
JSX959_NR2100_NC_Jabo JSX959 Toloteluks 5G NEW-21Add UMPT,35. Monitoring KPI
JSX581_L2100_NC_Jabo JSX581 Gglanggarl4G NEW-21SW Only 35. Monitoring KPI
JSX277_L2100_NC_Jabo JSX277 Komplekau4G NEW-21Dismantle 35. Monitoring KPI
JSX581_NR2100_NC_Jabo JSX581 Gglanggarl5G NEW-21Add UMPT,35. Monitoring KPI
JSX277_NR2100_NC_Jabo JSX277 Komplekau5G NEW-21Add BBU, 35. Monitoring KPI
JKU747_NR2100_NC_Jabo JKU747 Pelapahray5G NEW-21Add UBBP,35. Monitoring KPI
JKU626_NR2100_NC_Jabo JKU626 Janurhijau 5G NEW-21Add UBBP 35. Monitoring KPI
JKU062_NR2100_NC_Jabo JKU062 Gadingputi5G NEW-21Add UBBP 35. Monitoring KPI
JKU005_NR2100_NC_Jabo JKU005 Kelapapuy 5G NEW-21Add UBBP 35. Monitoring KPI
CAPEX Program Issue and APlan System Subcon
CAPEX #3 2019 Part 2 4G 1800 G1
CAPEX #2 Part 3 2020 4G 1800 G1
CAPEX #1B Settlement IX 2021 Part 2 4G 1800 G1
CAPEX Program New Infra Cherry Pick & Exploit Untapped 2021 4G 900 G1
CAPEX #1B Settlement IX 2021 Part 2 4G 1800 G1
CAPEX #1B Settlement IX 2021 Part 2 4G TDD GCI
CP Core 5G KELAPAGADING 4G TDD GCI
CAPEX Exploit Untapped 2021 Batch 2 4G 1800 GCI
CAPEX #1B Settlement IX 2021 Part 2 4G 2100 GCI
CAPEX Program New Infra Cherry Pick & Exploit Untapped 2021 4G 900 NW
CAPEX #1B Settlement VII 2021 4G 900 NW
CAPEX Program New Infra Cherry Pick & Exploit Untapped 2021 4G 900 NW
CAPEX Program New Infra Cherry Pick & Exploit Untapped 2021 4G 900 NW
CAPEX Program New Infra Cherry Pick & Exploit Untapped 2021 4G 900 NW
CAPEX Airport and Mall 4G 1800 NW
CAPEX UPLIFT REVENUE 2021 4G 900 POCA
CAPEX Cherry Pick & Exploit Untapped 2021 Part 2 4G 900 POCA
CAPEX 5G ULO & P.AKHMAD 4G 2100 Trial Site
CAPEX 5G ULO & P.AKHMAD 5G L2100 Trial Site
CAPEX 5G ULO & P.AKHMAD 4G 2100 Trial Site
CAPEX 5G ULO & P.AKHMAD 4G 2100 Trial Site
CAPEX 5G ULO & P.AKHMAD 5G L2100 Trial Site
CAPEX 5G ULO & P.AKHMAD 5G L2100 Trial Site
CAPEX 5G ULO & P. AKHMAD 5G L2100 Trial Site
CAPEX 5G ULO & P. AKHMAD 5G L2100 Trial Site
CAPEX 5G ULO & P. AKHMAD 5G L2100 Trial Site
CAPEX 5G ULO & P. AKHMAD 5G L2100 Trial Site
Update ClaDetail Issu PIC3 Remark ConStatus Remark Region
39. Not Fo Cell NY Config
No Need L Add Sector IBC
36. Alarm 20211102:Data Configuration Exceeding Licensed Limit, PLL Status Holdover, IP Clock Link Failure, External Clock Re
39.2 LV on Review
34. NPT & NBR OG
39.2 LV on reject Site Down 03 nov
No Need L site trial
36. Alarm PLL Status = Free running |Vlan Clock Need check router
36. Alarm The cell configuration exceeds the BBI capability (BW 5M)
39.2 LV on Review
35. Monitoring KPI
39.2 LV on Review
46. TransmiAvail NOK, Intermittent S1
36. Alarm IP Clock Link Failure / Configuration Data Inconsistency
36. Alarm Configuration Data Inconsistency
36. Alarm PLL Status: Free Running
39.2 LV on Review
Link Failure, External Clock Reference Problem
Update Class Detail Class Issue PIC Milestone
- Done UG FDD
15M
DONE UPGRADE - Done UG FDD Project
17.7M
- Done UG TDD
GSM Relocation 2G
4G New - 2300 4G TDD
4G New - 1800 4G 1800
3G Relocation 3G
3G New Site 3G
3G Upgrade (Others) 3G UPG
4G Macronization 4G 1800
U900 Relocation 3G U900
DCS Activation 2G
3G Relocation 2G