You are on page 1of 1

1 2 3 4 5 6 7 8 9

4800
600 600 600 600 600 600 600 600

REKAYASA
A
STRUKTUR
BANGUNAN
3
600

STUDIO 3 STUDIO 4 STUDIO 5 STUDIO 6


+8.15 +8.15 +8.15 +8.15

AC AC AC AC AC AC AC AC
Indoor Indoor Indoor Indoor Indoor Indoor Indoor Indoor
B
200

GEDUNG PERKULIAHAAN
C AC AC
Outdoor Outdoor
AC AC
Outdoor Outdoor
AC AC
Outdoor Outdoor
AC AC
Outdoor Outdoor
Up
2200
600

SELASAR LT 3
+8.15
19 SEPTEMBER 2021

AC AC AC
Outdoor Outdoor Outdoor
D SDP ARYADIENI FARAH AYU
200

E SANTOSO

Up
600

GUDANG

Indoor
Indoor

Indoor
LAB KOMPUTER R. KELAS R. KELAS R. KELAS

AC

AC
AC

+8.15 +8.15 +8.15 +8.15 T. WANITA


+12.15
T. PRIA
+12.15
+8.15
I0220017
AC AC
Indoor Indoor

F AC
Outdoor
AC
Outdoor

Dr. KAHAR SUNOKO, ST, MT

Keterangan Notasi Skema Rencana Listrik

Jaringan Tata Suara Jaringan Listrik PLN METERAN ATS (Automatic GENSET
Speaker Kabel (Saklar-Lampu) Transfer Switch)
Amplifier Saklar Ganda
Saklar Tunggal
NILAI PARAF
Pusat Tata Suara MDP (Main
Stop Kontak
Jaringan Tata CCTV Distribution Panel)
Titik Lampu
CCTV
Monitor CCTV
M Meteran
RENCANA UTILITAS LT.3
ATS Automatic Transfer Switch
Jaringan Tata Komunikasi
Interkom/Telepon
SDP Sub Distribution Panel
SDP SDP SDP SDP
1:200
MDP Main Distribution Panel (Sub Distribution (Sub Distribution (Sub Distribution (Sub Distribution
G Genset Panel) Panel) Panel) Panel)

UNIT UNIT UNIT UNIT

You might also like