Hitachi Review Vol. 52 (2003), No.

2 101

INTRODUCTION System 2000 (HITASS-


BESIDES providing a stable 2000), and the generator
source of electrical power, exciter control system VCS-
the modern power plant must 6000.
also be highly efficient,
provide good operability, and DISTINGUISHING
have minimal adverse effects FEATURES OF THE NEW
on the environment. Meeting CONTROL SYSTEMS
these demanding Hitachi’s new control
requirements calls for plant systems leverage the latest
supervision and operations technologies in HIACS series
that are more advanced and at products. (1) Digitization of
the same time more intuitive high-speed control circuits
and easy to use. And Control circuits such as
considering the ongoing trend servo valve control circuits
toward liberalization of the requiring high-speed
energy market, it is also arithmetic operation are
essential to hold down plant implemented with digital
construction costs and reduce circuits that operate using a
plant construction schedules. PCM (programmable control
These were the module). This has not only
background factors enabled us to implement the
motivating Hitachi’s control equipment much more
development of supervisory compactly, it also permits
and control systems that not personnel to modify and
only continue to support adjust control setting using a
excellent reliability but also maintenance tool, which
provide good cost- greatly simplifies these
effectiveness while operations.
minimizing the workload (2) Open interface-based
involved in plant operation interconnections
and maintenance. Our most Hitachi’s latest control
recent power plant control systems can be
systems are based on Hitachi interconnected to other
Integrated Autonomic systems and equipment using
Control System (HIACS), the the serial interface standard
Company’s comprehensive RS232, TCP/IP
supervisory and control (Transmission Control
system that has been Protocol/Internet Protocol),
extensively deployed and has and other generalpurpose
an excellent reputation for interfaces.
reliability and performance. (3) Diverse system repertory
This article will describe A rich repertory of control
several of these leadingedge system products has been
control systems: the gas assembled that meets the
turbine control system diverse needs of our
HIACS-MULTI, the steam customers. The control
turbine control system system panel has also been
Hitachi Turbine Start up implemented very compactly
102

so it can be installed in newly The HMI now includes a


constructed plants or easily built-in maintenance tool for
retrofitted in existing power diagnosing and maintaining
plants. CPU (central processing unit)
programs, so each HMI has
GAS TURBINE the ability to perform a full
CONTROL SYSTEM range of supervision,
HIACS-MULTI operations, and maintenance
HIACS-MULTI Series functions (see Fig. 1).
The HIACS-MULTI The servo valve control in
series provides a HIACS-MULTI is configured
comprehensive gas turbine using digital circuits, so
control system that includes operators can now monitor
gas turbine control and control logic online. The
protection, generator servo valves are calibrated by
protection, and generator commands from the HMI,
excitation control functions. thus it is very
The system is available in a
range of sizes and
configurations, thus
providing a good repertory of
product options tailored to
different customers’ needs
(see Table 1).

System Configuration
The basic HIACS-MULTI
Latest Power Plant Control System

T ABLE 1. Overview of the HIACS-MULTI Series


A full repertory of advanced products are tailored to different
customer needs.
Function GT control GT control Generator Generator
) (triple excitation
Product (simplex protection
redundant) control
HIACS-MULTI 100 ✔ ✕ ✕ ✕

HIACS-MULTI 200 ✔ ✕ ✔ ✕

HIACS-MULTI 300 ✕ ✔ ✕ ✕

HIACS-MULTI 500 ✕ ✔ ✔ ✕

HIACS-MULTI 700 ✕ ✔ ✔ ✔

HIACS-MULTI 700 (S) ✔ ✕ ✔ ✔

GT: gas turbine ✔: Provided ✕: Not provided

system includes an HMI


(human-machine interface)
that enables plant supervision
and operation from PC
(personal computer). A
remote HMI can be added in
the control network to
interconnect multiple HMIs.
Hitachi Review Vol. 52 (2003), No. 2 103

annunciation, display of
trends data, servo valve
calibration, and other
capabilities (see Fig. 2).

Retrofitting the Control


System with HIACS-MULTI
Hitachi was recently
commissioned to retrofit the
PT Pupuk Sriwidjaja (PUSRI)
No. 2 gas turbine generator in
the Republic of Indonesia
with the HIACS-MULTI
control system (see Fig. 3).
Hitachi supplied this plant
some three decades ago in
1973. In this refurbishment,
the existing analog gas
turbine control system, the
Fig. 1—Typical System generator excitation control
Configuration of the HIACS-MULTI system, and the generator
300 Series. protection system were all
Supervision, operation, and replaced by the HIACS-
program maintenance from a single MULTI 700 system. This
HMI installation. retrofit project was very
Fig. 2—Screenshots of the HIACS-
successful, and the HIACS-
MULTI HMI (Online Monitoring
MULTI system is now
Displays for Exhaust Gas
Temperatures and Control Logic). operating smoothly at the
With a range of menu options, the PUSRI site.
HMI offers an intuitive and easy-to-
use user interface.
* Windows is a registered trademark of
Microsoft Corp. in the U.S. and other
countries.
user-friendly and intuitive.
Finally, HIACS-MULTI
can be interconnected to the
DCS (distributed control
system) or other equipment
over such general-purpose
interfaces as RS232 or
TCP/IP.

HMI System
The HMI for HIACS-
MULTI is a graphical
interface that runs on the
Windows* operating system.
It provides straightforward
easy-to-use menu options for
plant operation, monitoring,

Fig. 3—Screenshots and Appearance


of the Control System for the PT
(a)Appearance PUSRI No. 2 Unit Gas Turbine
(b) Trend display
of the control
equipment Power Plant in the Republic of
Indonesia.
service since Hitachi initially
supplied the gas turbine plant back
(c) Operation and in 1973, was recently replaced by
monitoring display
Hitachi’s state-of-the-art digital
control system.
104

FEATURES OF NEW
STEAM TURBINE
CONTROL SYSTEM
HITASS-2000
(1) System configuration
The main component
elements of the steam turbine
control system are the
speed/load control unit, the
servo valve control unit, the
steam turbine automatic
startup control unit, and the
turbine protection unit. The
system has been enhanced by
digital circuits in the PCM for
servo valve control, which
previously had been
implemented by hard-wired
circuits.
Fig. 4 is a schematic showing
the configuration of

the new steam turbine control


system HITASS-2000. (2)
Digital servo control
Digital servo control
circuit in the PCM enables
servo valve calibration easier
due to the control parameter
tuning capability by control
Hitachi Review Vol. 52 (2003), No. 2 105

logic software. (including steam turbine


Maintainability is also protection circuits) are
enhanced by implementing interfaced to the computer
the current converter, the over a network connection,
oscillator, and the rectifier which enables the number of
circuit as a single printed interface cables to be
circuit board to minimize reduced. In addition,
hardware adjustments. verification and testing of
(3) Steam turbine protection turbine speed and load
circuit interlock unitThe control functions have been
steam turbine protection simplified with a software
circuit is fundamentally simulator function that
important for includes a built-in model of
safeguarding and the steam turbine. Using the
protecting the plant from simulator, actual servo valves
serious damage and is also can be driven for the
therefore implemented as control function test.
Latest Power Plant Control
a digital triple-redundant System
system to ensure the
highest standard of
reliability.
The steam turbine FEATURES OF NEW
protection logic is processed DIGITAL GENERATOR
in the PCM, while the I/O EXCITATION SYSTEM
(input and output) component VCS-6000
(AI: analog input; DI: digital
input) for detecting trip
factors and the trip signal (1) The number of thyristor
output component (DO: panels can be increasedor
digital output) are deceased to accommodate
implemented as separate units a full range of generator
with triple redundancy. By capacities from small to
implementing these functions large (600-MVA class),
as separate units, they are which simplifies the
completely independent and construction of different
isolated from other functions. scale plant facilities.
This means that the plant (2) Control systems can be
steam turbine protection implemented as
circuit can be kept running eithersimplex or as dual
even when the other functions systems, so systems can
fail. be more closely tailored to
(4) Maintenance users’ needs.
As a result of more (3) Maintainability,
extensive digitization, the reliability, and
internal processing state of performance areupgraded
the PCM can be monitored with the development and
using the control system deployment of VCMI
maintenance tool, and this (voltage control module
improves the maintainability integrated), a single
of the plant. Alarm signals printed circuit control
106

board that integrates immune to noise between


voltage controller, logic VCMIs.
controller, and GPG (gate (5) A thyristor switch was
pulse generator). adopted in the
(4) Development and dischargecircuit for
adoption of two new cutting off generator field
interfaces— GDIO (gate current. This is a cost-
driver and input and saving innovation for it
output) for the thyristor allows us to use
signal interface and RDIO generalpurpose AC
(remote digital input and (alternating current)
output) for the I/O circuit breakers and
interface — which single-pole DC (direct-
permits the use of optical current) circuit breakers
signals that are practically for the field
circuit breakers.
(6) We also implemented a graphic panel that permits

ABOUT THE AUTHORS

continuous monitoring of problems that develop and


Takashi Kamei
plant operational status. Maintainability is also
Joined Hitachi, Ltd. in 1993, and now works at the improved by adopting
connectors for all the wiring to
P
o
w
e
r

P
Hitachi Review Vol. 52 (2003), No. 2 107

l
a
n
t

C
o
n
t
r
o
l

S
y
s
t
e
m
s

E
n
g
i
n
e
e
r
i
n
g
the printed circuit boards of controllers.Department, the Information & Control
Systems
Fig. 5 shows the schematic of a thyristor excitation Division,
the Information and Telecommunication system with dual controllers.
Note that the VCMI,Systems. He is currently engaged in the design of
GDIO, and RDIO can also be applied to brushless power plant
control systems. Mr. Kamei can be
reached by e-mail at excitation systems, and
since the thyristor converters takashi_kamei@pis.hitachi.co.jp.
and PWM power converters can be
flexibly adjusted to match the capacity
of any plant, control systemsTakashi
Tomura
can be easily tailored to meet a broad range of customer Joined
Hitachi, Ltd. in 1982, and now works at the

P
o
w
e
r

P
l
a
n
t

C
o
n
108

t
r
o
l

S
y
s
t
e
m
s

E
n
g
i
n
e
e
r
i
n
g
needs and plant specifications.Department, the Information & Control
Systems
Divis
ion,
the
Infor
matio
n and
Telec
omm
unica
tion
CONCLUSIONSSystems. He is currently engaged in the design of
This article highlighted several state-of-the-art power plant
control systems. Mr. Tomura can be
reached by e-mail at control systems —
HIACS-MULTI, HITASS-2000, takashi_tomura@pis.hitachi.co.jp.
and VCS-6000 — that have been developed and
incorporated in Hitachi Integrated Autonomic Control Yoichi
Kato
System, HIACS.Joined Hitachi, Ltd. in 1993, and now works at the
The demand for cost-efficiency and intelligent Power Plant Control
Systems Engineering

Department, the Information & Control Systems power plant operation will
only intensify in the yearsDivision, the Information and Telecommunication
ahead. Hitachi is fully prepared to accept this challenge Systems.
He is currently engaged in the design of by continuing to provide our
customers with advanced power plant control systems. Mr. Kato is a member
of
state-of-the-art control systems that lend themselves The Institute of
Electrical Engineers of Japan, and
can be reached by e-mail at to flexible system
implementation, are intuitive and youichi_katou@pis.hitachi.co.jp.
user-friendly, and most importantly support safe and stable
operation of power plants.
Hitachi Review Vol. 52 (2003), No. 2 109

REFERENCES
(1) Goog
le.co
m
(2) Hitac
hi
comp
any

You might also like