ECO House Production

Houses of New Generation

Eco Development Group Inc.


Parry Sound Area Industrial Park
October 31, 2019

1
ECO House Production
Who we are
Our company specializes in project management in new construction using CLT (Cross Laminated Timber)
technologies.
With different subcontracting organizations, we carry out the design of the construction of buildings, all
its engineering systems, as well as the design of interiors with the subsequent supply of all the basic elements -
windows, heating and ventilation equipment, doors, electrical parts, etc.

The owners and managers of the project have extended experience in managing of such plant-scaled projects:
• Oleg Gromov, a previous programmer, currently owns a business selling kitchens, home equipment and
furniture. He has dealership relations with more than 100 factories in Italy.
• Andrey Vovchenko, a power-energetics engineer and economist by education, many years of experience as a
banker and as a private investor: 9 years in a project for the development and production of solar heating
systems.
• Oleg Volkov, successful businessman, owned three industrial plants in Russia. Currently, Volkov is developing a
project for the production of CLT panels on the basis of his plant in Vladivostok region in Russia.
Investor to ongoing project - Mall “Improve USA” in Atlanta, USA (similar to Improve Canada in Vaughan, ON).
• Roberto Cappellazzo, owner and CEO of WoodCape srl, Italy (www.woodcape.it), the industrial and
construction company, about 20 years specialized on CLT technology, having deep knowledge, skills and
experience in CLT processing, design and construction.

2
ECO House Production
Our ambitions
Modern and energy efficient house is a synergy of innovations:
Cross Laminated Timber (CLT) –
advanced construction material
Aluminum windows and doors
– approved for “passive
houses”
Heat Pumps provide heating,
cooling and hot water
preparation
Healthy indoor climate:
heated floors and ventilation
with air recuperation
Solar roof PV systems - reduce
electricity consumption up to
60%

3
ECO House Production
Why is this beneficial?
● Better life quality for comparatively same
money
● Very low running costs
● Healthier indoor climate
● Utilization of renewable materials (wood,
wood fiber, aluminum etc.)
● ECO factor

4
ECO House Production
Why CLT?
• Thermal performance and energy
efficiency
• Fire resistance
• Healthy indoor environment
• Durability, Strength and Stability
• Seismic resilience
• Acoustics
• Short construction period, dry
construction method and quick
readiness for occupancy - cost
effectiveness
• Design flexibility
• Resource efficiency
• Reduced waste

5
ECO House Production
What is it - CLT?

6
ECO House Production
Modern aluminum windows and doors

7
ECO House Production
Heat pumps – heating, cooling and HWP

Advantages:

● Very low running costs:


Annual expenses for house of
200 m2 shall be about
CAD 500.00
● High level of reliability
● Remote diagnostics for
service needs
● Remote climate control
● Direct solar PV panels
connection
● Three in one (heating,
cooling, hot water)
8
ECO House Production
Heated floors

Heated Floor
provides the
healthiest indoor
climate

9
ECO House Production
Forced ventilation with recuperation of exhaust air

10
ECO House Production
Solar PV systems

11
ECO House Production
Production types
1. CLT panels cutting (CNC processing)
2. Doors/windows manufacturing (Reynaers profile)
3. External wall panels preparation (insulation and windows’ frames installation)
4. HVAC kits – heat pumps, ventilation, heated floors, piping etc.

Production facilities (approx. 40,000 sq. ft)


1. Covered area for CLT-slabs unloading and storage (800 m2);
2. CNC machine workshop for cutting and processing of CLT-slabs (1600 m2);
3. Windows/doors systems manufacturing (1200 m2);
4. Workshop for window frames and insulation installation (1000 m2)
5. Warehouse for heating, ventilation and plumbing fixtures (400 m2);
6. Covered storage area for ready-made houses’ CLT-sets prepared for transportation (1000 m2).
7. Administrative space – office, changing room, washroom/showers, buffet, storage - (450 m2).

12
ECO House Production
Location
1 1 20 21 22

14 15 16 17

23

13 12 11
10

4
3
5

A ailable Ser iced Lo s

2 A ailable Un-ser iced Lo s

1 Una ailable Lo s

13
ECO House Production
Approximate plan of CNC processing workshop

14
ECO House Production
CNC processing workshop

15
ECO House Production
CNC machine
https://youtu.be/XPiMRwGKBT0
https://youtu.be/MEII3Moa7HI

16
ECO House Production
CNC machine

17
ECO House Production
Workforce (for two-shifts)
• CNC-operator – 1+1
• Warehouse workers – 3+3
• CLT design engineer - 1
• Master of the windows workshop – 1+1
• Windows assembly workers – 3+3
• Windows/doors design engineer - 1
• Manager – 1+1
• Receptionist – 1
------------------------------
Total – 21 (12+9)

18
ECO House Production
Project timeline
• Buying a plot of land in Industrial park of Parry Sound (November 2019)
• Project development (design of workshops on the land) and technical preparation (December
2019 – March 2020)
• Order of a CNC machine and other equipment (January-February 2020)
• Cleaning and preparation of the ground and utilities hook-up (April-May 2020)
• Order and supply workshop construction kits (March-August 2020)
• Order and supply supplementary equipment (May-October 2020)
• CNC machine delivery and installation (November-December 2020)
• First CLT-slabs delivery (December 2020)
• CNC setting-up and put into operation (January-February 2021)
• First house kit production (March 2021)

19
ECO House Production
Environmentally- friendly production

• Wood slabs and aluminum profiles cutting does not


result any emissions
• Workshop heating shall be done using industrial
Heat Pumps with additional PV solar panels feeding
• We will not use any harmful chemical liquids nor
gases at the facility

20
ECO House Production
Conclusions:

1. We are going to buy 3 lots of industrial land (No 3-4-5)


2. Job creation – 21 FT jobs
3. New eco-friendly home building technology
4. Increased tax revenue for the Industrial Park

21
ECO House Production
Thank you!

ANY QUESTIONS ?

22