SANITIZER DISPENSER
PRESENTED BY HARKIRAT SINGH
STUDENT ID 0765734
INTRODUCTION
• THE UNIT ASSUMED TO WORK 16 HOURS PER DAY ON DOUBLE SHIFT BASIS
FOR 300 WORKING DAYS IN A YEAR
• IT IS EXPECTED TO ACHIEVE 80% EFFICIENCY IF FULL CAPACITY.
• WAGES FOR WORKERS HAVE BEEN TAKEN AS THOSE PREDOMINANT AT THE
HOUR OF ARRANGEMENT OF TASK PROFILE.
• INTEREST RATE FOR THE FIXED AND WORKING CAPITAL OF THE PROJECT HAS
BEEN TAKEN AT AN AVERAGE RATE OF 12.5% PER ANNUM.
• THE UNIT CAN WORK IN RENTED PROMISES.
TECHNICAL ASPECTS AND PROCESS OF
MANUFACTURING.
• THE RAW MATERIAL REQUIRED FOR THIS PROJECT IS AVAILABLE
EVERYWHERE. THIS MATERIALS ARE PURCHASED FROM RAW MATERIAL
SUPPLIERS AND PROCESSED BY DESIGNING AND ANALYZING CUTTING,
BENDING, WELDING, MACHINING COATING AFTER THE ASSEMBLY AND
TESTING.
• QUALITY CONTROLLED BY WHO STANDARDS WITH THE IS SPECIFICATIONS
FOR MATERIALS.
POLLUTION CONTROL AND ECO-FRIENDLY.