TIME

OUTPUT DESCRIPTION
Week Day Date
structural model, consult to communicate pre-final form through model (actual scenes of activities, eyebird view to show
structure btech facilitator, overall form), principal axono to explain wind system and air flow inside the spaces, axono
model, active and passive structural to explain placement of elements and joints (will also be used to map placement
ventilation system, structural of , passive vent system to explain ventilation in certain areas (can be partial section for
14 Saturday 4/12/2021 system (section a, all plans) typical spaces), sections to explain the overall structure including the materials
structural+construction system communicating the system with details and building section, providing sections to map
14 Sunday 5/12/2021 (section b), passive lighting lighting condition through openings. lighting in each floor plan will also be elaborated
active lighting will contain lighting for activities (specially in the open spaces) and ambience
active lighting, revise model+add
lighting (for the bar part). model will be revised if needed, landscape will be provided in the
15 Monday 6/12/2021 landscape (site plan and model)
model.

revise model based on present the whole thing and revise according to the feedback, adding schematic site plan
15 Tuesday 7/12/2021 feedback, site plan, that will include night lighting too, revised mode

15 Wednesday 8/12/2021 fix drawings fix the structure-construction drawings to match the feedback and revised model

water, transport, acoustic making line diagrams to map water usage location, thinking about vertical transport (detail),
15 Thursday 9/12/2021 (axono) map the distribution of acoustical,
emergency access, circulation emergency access in detail, crowd study. presenting progress and how the interior qualities
15 Friday 10/12/2021 study, revise model (axono) perform regarding the crowd situation
performance diagram and
reasonings of elements (perspective using diagram to show step by step design and how curvilinear form was applied
11/12/2 or axono)

15 Saturday 021

12/12/2 structural details giving details to the joints in the structural sections
15 Sunday 021

13/12/2 revised models, unplanned changes


16 Monday 021

14/12/2 revision finalized design will get feedback, revision done


16 Tuesday 021

15/12/2 revision completing unfinished drawings or model (if there’s any left overs))
16 Wednesday 021

16/12/2 finalizing diagrams and tech arranging report


drawings
16 Thursday 021
17/12/20
SUBSMISSION
16 Friday 21