Leadtime Calculation

Lot Making Kanban Heijunka Post


Waiting Post
Chuter Administration
Process
p e c
o d a
f b
n

r s m i j k l
q h
INJECTION ASSEMBLY Customer

Shipping Preparation Area Loading Area


Store Store
PRODUCTION LEADTIME DELIVERY LEADTIME

LeadTime Informasi n+o+p LeadTime Informasi a+b+c+d+e+f

LeadTime Proses s LeadTime Proses Not Available

LeadTime Stagnasi r + m LeadTime Stagnasi i

LeadTime Conveyance q LeadTime Conveyance h+j+l


LEADTIME CALCULATION
Kind of Lead
Time
How to get data How to Calculate
Conveyance - Observe the operator handling during 1 cycle
deliver the parts to fill each store/stagnation area
- Measure with stop watch the time needed to deliver - Record the data of time by
stopwatch/Actual
the parts during 1 cycle.
Stagnation
- Genba to the plant side for each stagnation/store area
- Q'ty of parts x TT Part
- Calculate the quantity of stock at each stagnation/store

Process - Observe the job of operator, process/machine


- Separate the regular job & irregular job
- Decide the start & stop point for 1 cycle job
- Sigma C/T
- Measure with stopwatch for 1 cycle job, repeat it 10 times
- Take the data of Cycle Time by the minimum data
which tend to occurrs

Information - Decide the information point in & out


1. (When kind of information used) - (When kind of information received)

- Record when the information delivered, received and used 2. (When kind of information delivered) - (When kind of information received)
- Calculate how long the information waiting to become
production instruction at each process area (Q'ty of parts written at kbn.) X (Number of kbn.) X
LineT/T or CT
- Calculate how long the information waiting to become
production instruction at each process area (Q'ty of parts written at kbn.) X (Number of kbn.) X CT
Part And Information Flow Chart

Simbol-simbol yang digunakan pada PIFC

PART FLOW SIGNAL KANBAN PROCESS

INFORMATION FLOW DOCUMENT


(Schedule, DN, etc) QUALITY INSPECTION

PART SEQUENCE
HEIJUNKA POST LOT KANBAN CHUTE

PART SEQUENCE BETWEEN


PROCESS LOT MAKING
KANBAN CHUTE

KANBAN WAITING POST


TEI-TEI PATERN
CUSTOMER / SUPPLIER
KANBAN COLLECTING POST (FACTORY)

P STORE
PRODUCTION INSTRUCTION KANBAN DELIVERY TRUCK
I

PW PART WITHDRAWAL KANBAN


STAGNATION TROLLEY
SPECIAL KANBAN

e - KANBAN FORKLIFT
Part Flow Chart
Term and Condition for Store

B) Store/storage(toko) C) Stagnation
A)Sequence

A.1 A.2

Sequence Flow based on


Production arrangement

Point Penting Point Penting


A.1 1 . Part no/index no harus ditampilkan
1 . One piece Flow
di line store
pcs by pcs production 2. Tampilkan Identifikasi/address yang jelas
(Qty/box/kbn,Box Tipe)
Tidak memenuhi
2 . Standard in proces stock 1 pcs
salah satu point
3. Mudah untuk diletakkan dan
3 . Menunggu antrian dalam proses diambil (FIFO) penting/syarat-
4 . Kapasitas Rak/Store harus cukup syarat dari store
A.2 menampung kapasitas max yang
1 . Kanban by kanban flow
akan disimpan
5 . Ada Standar Min dan Max yang harus dijaga
2 . Standard in process 1 kanban
6 . Tempat sementara OK Parts (WIP or
Finished Good condition)
3 . Tempat menunggu
sementara berdasarkan 7. Tampilkan Control point dan SOP
urutan produksi yang jelas (termasuk bila terjadi
kondisi abnormal )