Microsoft Excel 16.

54 Answer Report
Worksheet: [Book1]Sheet1
Report Created: 26/10/2021 16:25:32
Result: Solver found a solution. All constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 1014.124 Seconds.
Iterations: 8 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 1E-06, Use Automatic Scaling
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative

Objective Cell (Min)


Cell Name Original Value Final Value
$C$16 COST JEDDAH 0 4525

Variable Cells
Cell Name Original Value Final Value Integer
$C$11 PLANT 1 JEDDAH 0 25 Contin
$D$11 PLANT 1 RIYADH 0 0 Contin
$E$11 PLANT 1 AL-TAIF 0 125 Contin
$C$12 PLANT 2 JEDDAH 0 0 Contin
$D$12 PLANT 2 RIYADH 0 0 Contin
$E$12 PLANT 2 AL-TAIF 0 175 Contin
$C$13 PLANT 3 JEDDAH 0 175 Contin
$D$13 PLANT 3 RIYADH 0 100 Contin
$E$13 PLANT 3 AL-TAIF 0 0 Contin

Constraints
Cell Name Cell Value Formula Status Slack
$C$14 DEMAND JEDDAH 200 $C$14=$C$15 Binding 0
$D$14 DEMAND RIYADH 100 $D$14=$D$15 Binding 0
$E$14 DEMAND AL-TAIF 300 $E$14=$E$15 Binding 0
$F$11 PLANT 1 SUPPLY 150 $F$11=$G$11 Binding 0
$F$12 PLANT 2 SUPPLY 175 $F$12=$G$12 Binding 0
$F$13 PLANT 3 SUPPLY 275 $F$13=$G$13 Binding 0
Microsoft Excel 16.54 Sensitivity Report
Worksheet: [Book1]Sheet1
Report Created: 26/10/2021 16:25:33

Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$C$11 PLANT 1 JEDDAH 25 0 6 0 4
$D$11 PLANT 1 RIYADH 0 1 8 1E+030 1
$E$11 PLANT 1 AL-TAIF 125 0 10 4 0
$C$12 PLANT 2 JEDDAH 0 0 7 1E+030 0
$D$12 PLANT 2 RIYADH 0 3 11 1E+030 3
$E$12 PLANT 2 AL-TAIF 175 0 11 0 1E+030
$C$13 PLANT 3 JEDDAH 175 0 4 4 1
$D$13 PLANT 3 RIYADH 100 0 5 1 1E+030
$E$13 PLANT 3 AL-TAIF 0 4 12 1E+030 4

Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$C$14 DEMAND JEDDAH 200 -7 0 25 0
$D$14 DEMAND RIYADH 100 -8 0 25 0
$E$14 DEMAND AL-TAIF 300 -11 0 175 0
$F$11 PLANT 1 SUPPLY 150 1 0 0 175
$F$12 PLANT 2 SUPPLY 175 0 0 1E+030 0
$F$13 PLANT 3 SUPPLY 275 3 0 0 25
TRASPORTATION COST

TO JEDDAH RIYADH AL-TAIF SUPPLY MEALS SHIPPED


FROM
PLANT 1 25 0 125 150 150
PLANT 2 0 0 175 175 175
PLANT 3 175 100 0 275 275
DEMAND 200 100 300
MEALS SHIPPED 200 100 300
COST 4525

JEDDAH RIYAHD AL-TAIF


PLANT 1 6 8 10
PLANT 2 7 11 11
PLANT 3 4 5 12

S
ALS SHIPPED Min Z = 6x1A + 8x1B + 10x1C + 7x2A+ 11x2B + 11x2C +
x1A + x1B + x1C = 150
x2A + x2B + x2C = 175
x3A +x3B +x3C =275

x1A + x2A+ x3A ≤ 200


x1B+ x2B + x3B ≤ 100
x1C +x2C +x3C ≤350
2A+ 11x2B + 11x2C + 4x3A + 5x3B + 12x3C