FORMAT NO. : 13.02.

07/F-03
DANGEROUS OCCURRENCE
(DO) / NEAR MISS REPORT Rev: 01
(NMR) Report No:

Incident Date & Time:_17/06_/2021_ & 09_:30_Hrs. DO/NM Reporting Time: 09:32_Hrs. Shift: Day □ / Night □
ype of Incident DANGEROUS OCCURRENCE (DO) NEAR MISS REPORT (NMR)
Project Name: NPB Site New Delhi Exact Location of Near miss/DO: Rajya Sabha
Site Details
SBG: Urban Infra SBU: Buildings and Airport

Description of On 17/06/2021 @ 9.30Hrs, Concrete boom placer (JH- 05 A6215) was trying to place concreting, during the reversing Concrete
Incident boom placer was toppled in raft from main vehicles roads (5M depth) near gate number 8. Mr Wasim (Operator S/C Tara
Chandra) was continuously working around 50 hrs, the main root cause because of which this incident occurred..

Manual Material
Excavation Concreting Roof Works
Handling
Rock Blasting Vehicle Movement Painting Work in Confined Space

Activity Working at Height Welding Finishing Electrical Maintenance


involving of Shuttering Cutting Bar Cutting & Bending Mechanical
Incident Maintenance
(Tick the relevant
De-shuttering Grinding Bar Shifting Work near IR Track
Activities)
Scaffolding Assembling Lifting Bar Binding Work near Live OHE
Line
Scaffolding Dismantling Erection Grit Blasting Offshore Work
Road Work Stringing Shot Blasting Any Others

Fall of Material or
Failure of Shuttering Drowning Vehicle Movement
tools
Nature of Support
Incident Failure of Tools Grinding wheel failure Oil spillage
(Tick the relevant Failure of Plants Unsafe Material Handling Fire Chemical spillage
Nature)
Flying object Wrong Rigging method Gas leakage Any Other:
Slip, Trip & Fall Electrical Shock Soil Collapse

A. Plant & Equipment failure Ill Health E. Management Issue F. Procedural Violation
Defective equipment. Poor administrative Non-compliance of
C. Construction Methodology
Failure of equipment Parts. control. procedure.
Inadequate detailing of
Manufacturing defect. Planning deficiency. Inadequate procedure.
work in Method Statement.
Defective Electrical Inadequate supervision. SIMOP guideline
Missing Schematic
equipm. Improper resource violation.
Drawing for temporary
Causes of Over Aged equipment. structures. allocation. G. External Factors
Incident Poor Maintenance. Policy not adequately Adverse Weather
(Tick the appropriate
D. Training & Awareness
defined, disseminated or condition.
Causes) Error in equipment No training provided. enforced.
selection. Poor Road condition
Inadequate job related Poor Housekeeping.
B. Personal Factor training. Power failure.

Lack of Skill Insufficient refresher Natural Calamities.

Behavioural issue. training. H. Others


Missing Signages & Caution
Poor Workmanship
Board.
Poor Communication
1. Construction vehicles movements HIRA shall be followed during vehicles entering in site the premises.
Corrective
2. Administrative control to be taken during deployments of vehicles operators.
Action Taken
3. Edge protection area/lengths to be increased.
Near Miss Name & Designation
Reported By Of Employee: Deepak Jaiswal/Kishore Panchal (Site engineer and P&M Engineer)

NMR / TPL @ 2020 Page 1 of 1


FORMAT NO. : 13.02.07/F-03
DANGEROUS OCCURRENCE
(DO) / NEAR MISS REPORT Rev: 01
(NMR) Report No:

Incident Date & Time:_17/06_/2021_ & 09_:30_Hrs. DO/NM Reporting Time: 09:32_Hrs. Shift: Day □ / Night □
Photographs if
any

Distribution

*Note: This report should be filled in by any Employee who is reporting the Dangerous Occurrence / Near Miss soon after the
observation. This Form shall be submitted to Site Safety Officer.

NMR / TPL @ 2020 Page 2 of 1