PURPOSE
The purpose of this procedure is to provide a guideline on operating truck mounted cranes
in the distribution network
2.0 SCOPE
The scope covers all distribution network related maintenance activities excluding operation
of cranes in substations.
3.0 DEFINITIONS
3.1 Low Voltage
3.2 HIRA
4.0 ABBREVIATIONS
4.1 SOP – Standard Operating Procedure
4.2 SAP – Senior Authorized Person
4.3 SRDS-Standard Requirements For Distribution System
4.4 PTW-Permit To Work
4.5 SFT-Sanction For Test
4.6 PPE-Personal Protective Equipment
1.0 DOCUMENTATION/INPUTS
1.1 SHE PLAN
1.2 JSA
1.3 Pre-start checklist
1.4 Operator’s manual
1.5 Valid load certificate
1.6 Certificate of operation for the operator
1.7 Crane Inspection Certificate
2.0 STATUTORY REQUIREMENTS
2.1 Factories Act 44:01
3.0 PROCEDURE
ITEM PREVENTION/
TASK STEPS HAZARD IMPACT OWNER
NO. CONTROLS
Conduct pre Uneven Trips and Conduct Crane
3.1
start checklist ground falls thorough JSA Operator
Fail lock
mechanism of
Preventative
tilted truck
Injuries/fatalities maintenance of
cab and/
crane trucks
Hydraulic
failure
Road traffic
accidents
leading to Where possible
Driving to point Heavy duty
3.2 Poor visibility property avoid driving at
of work driver
damage/Inj night
uries/Fatalit
ies
Road traffic
accidents
Authorized
Reckless leading to
Heavy duty
driving property
driver
damage/Injuries/F
atalities
Road traffic
accidents
Use of
Unroadworthy leading to
roadworthy
crane truck property
crane trucks
damage/Injuries/F
atalities
Competent
Property
Positioning of Uneven Balance the Person and
3.3 damage and
the crane ground ground level working
injury
party
Harmful Use of
Sting from insects
inserts insecticides
Be cautious of
Touch voltage Electrocution adjacent live
conductors
Lightning and/ Earth the crane
Bad weather
electrocution Suspend work
4.0 RECORDS/OUTPUTS
4.1 Completed JSA
4.2 Completed relevant safety document(s)
4.3 Daily or shift checklists