CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 1 OF 13
APPENDIX E
Tripping hazard
from trunking and Bruises and minor Familiarization of work area.
wiring running cuts from trips Cover trip hazards with 2 3 6 3 1 3 Site Supervisor
Provide close supervision
Working in along the floor wooden ramp or mark out trip
and regular house keeping
5 lift motor hazards with yellow paint 30 June ‘22
room
Expose electrical Electric shock 4 1 4 Frequent review 4 1 4 Site Supervisor
wirings Ensure all electrical panels are
closed and secured
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 2 OF 13
APPENDIX E
Implement SWP05
Tools to be kept in tool box WORKING AT HEIGHT. Site Supervisor
Serious injuries or 5 2 10 5 1 5
Falling Objects after use. No debris or waste Secure tools & components
fatality to be accumulated on the work when necessary
platform. Barricade work area
Access/Egress
6 and working Serious injuries or Engage qualified scaffold 30 June ‘22
from scaffold Fall from height fatality contractor to erect scaffold.
Apply “Working at height Implement SWP05
WORKING AT HEIGHT Site Supervisor/Scaffold
permit”. Ensure safe-to-use tag 5 2 10 5 1 5
Provide close supervision Supervisor
is in order before start work.
Use safety harness and anchor and regular risk
to designated anchor point communication
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 3 OF 13
APPENDIX E
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 4 OF 13
APPENDIX E
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 5 OF 13
APPENDIX E
Cuts on hands and Wear hand gloves, safety shoes 3 1 3 Frequent Review 3 1 3
Sharp edges of Site Supervisor
limbs and proper clothing
components
Implement SWP05
Apply permit to work at WORKING AT HEIGHT
Serious injuries or heights. Wear safety harness Provide close supervision Site Supervisor
Centering & Fall from height 4 2 8 4 1 4
fatality and anchor to designated and regular risk
11 Plumbing of 30 June ‘22
anchor points communication
lift shaft
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 6 OF 13
APPENDIX E
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 7 OF 13
APPENDIX E
Cuts on hands and Wear hand gloves, safety shoes 3 1 3 Frequent Review 3 1 3 Site Supervisor
limbs and proper clothing
Sharp edges of
components
Physical injury Use of PPE eg. Safety shoes,
Implement SWP07 L.O.T.O.
helmet and gloves
4 2 8 Provide close supervision 4 1 4 Site Supervisor
Caught in and regular risk
Install between moving
17 landing/car Deploy sufficient manpower to communication 30 June ‘22
objects Musculoskeletal
Door injury carry. Use mechanical aids
such as chain blocks wherever 3 2 6 3 1 3
Provide Training on SWP03
Heavy and bulky possible
LIFTING HEAVY EQUIPMENT Site Supervisor
load
Wear safety harness and
Fall from height Serious injuries or anchor to designated anchor
fatality points 4 1 4 Frequent Review 4 1 4 Site Supervisor
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 8 OF 13
APPENDIX E
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 9 OF 13
APPENDIX E
Sharp edges of
Install shaft Cuts on hands and Wear hand gloves, safety shoes
22 components 3 1 3 Frequent review 3 1 3 30 June ‘22
wirings limbs and proper clothing Site Supervisor
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 10 OF 13
APPENDIX E
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 11 OF 13
APPENDIX E
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 12 OF 13
APPENDIX E
CH M&E Group Pte Ltd – RA-01 LIFT INSTALLTION RISK ASSESSMENT REV01 PAGE 13 OF 13