Professional Documents
Culture Documents
1960s
Aliso_St_Overhead_Line_Congestion.jp
g (1024×832) (waterandpower.org)
1990s
2020s
History | ABB powerline.net.in/2019/07/06/spot-market-evolution/
www.wind-turbine-models.com/fotos/VwKtGeDTgvV-vestas-wind-systems-a-s-v112-onshore
1950s
1980s
2000s
2020s
UK Centennial AGM 2021
Control Room IT systems – Ronan Jamieson (C2)
2020s
CIGRE UK AGM - Centenary Event
Presented by:
Spyros Karamitsos – CIGRE SC C4 UK Regular Member
Multi-Vector
Interconnections
Global grids
fuelcellsworks.com/news/electrolyzer-generates-green-hydrogen-from-wind-power/
Digital Twins
Presented by:
Spyros Karamitsos – CIGRE SC C4 UK Regular Member
Ø More Flexible, Controllable and Faster IBR Controllers - Virtual Inertia / Power Level
Ø New System Impedance, SCL, Inertia Measuring Techniques & Control Adaptation
Ø Control Centre Operators with Improved System Visibility for RT Monitoring and
Control of the Grid | Improve choices and uphold the PS during large scale events
Autonomous Networks
CIGRE UK SC C6 – 16th November 2021
Presented by:
Samuel Jupe – CIGRE SC C6 UK Regular Member
FUTURE: 2021-2121
Autonomous Networks
Renewable
Energy generation • Scheduling demand
storage
and around renewable
Flexibility
generation (future)
Artificial • As opposed to
Intelligence
scheduling
generation to meet
demand (current)
Autonomous Networks
Self * Networks
• Self-configuring
• Self-healing
Self * • Self-optimizing
• Self-protecting
No more
centralized • Potentially…
control!
Back to the Future!
© Google © Siemens
Thank
Copyright &
Disclaimer notice
You! Disclaimer notice