You are on page 1of 15

OPERATION

&
MAINTENANCE MANUAL
OF
GAS TURBINE EXHAUST DUCT & BY PASS STACK
ARRANGEMENT

CUSTOMER: B.H.E.L, HYDERABAD-32

PROJECT: GGSR BHATINDA, 2XFR- 6B.

P.O.No: R709H008, DATE: 15-04-09

P.V.K ENGINEERS (P) LTD.

PLOT NO: 23, PHASE: 1V,

JEEDIMETLA, HYDERABAD-55.

PH: +91-04023095436

FAX: +991-04-23096561
INDEX

Sl.No Description Drawings No. No. Of Rev.


Sheets
1. G.A OF EXHAUST 1-102-418-05 3 01
DUCT & BY PASS
STACK
2. SUPPORT 1-102-419-05 2 01
STRUCTURE
(EXHAUST DUCT & PASS STACK)
3. PLATFORM ON STACK 1-102-420-05 2 01
(EXHAUST DUCT & PASS STACK)
4. PLENUM SIDE DUCT 1-102-421-05 2 01
5. PLENUM UPPER DUCT 1-102-422-05 2 01
6. TOP SILENCER (SL2) 1-102-423-05 1 01
7. BOTTOM SILENCER 1-102-424-05 1 01
(SL1)

Prepared Checked Approved


Kumar Khaleel Khaleel