0 ratings0% found this document useful (0 votes) 50 views11 pagesPP Drawings
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
SN SE DST
Sa A ane
Set Sewc P 5 SCR] ae
ransres rout | = § i
[weve Pal yates
— ip Te
q t
wo
h a Pats er post
=< NET BAPE
aS} socom Ee Ii
“An o f
ts pA by
78 FO.
suremuatant yy Pest GHG sence.
pee a reler Wale SNe
PLAN
EW *a"="3"
axe sou a
flow fewma| me] CHUORINATOR- L CONTROL PANEL
f° On, crut rs Boe at] [agar Bore f
rare oo
$ rs
oreo | = orn
ot eo oe
+ =n =} 2-0 view “c’ see ws
on "Suet TeRaTON TN cuRFER oaome
eauAlionnon “ne camer
"0k EW "A’"A" eater
ee ee ee] ores:
nr | 09" | wine fhe | ate [tawcio,[ Fe Tew | 4) a eERNAL PANG TO THE TAM I T0 BE SUPPUED AND
ISTALED BY We NSTAUATIN CONTRACTOR.
2) FOINDATON PAD MATERALS AND DES 1 OETERUNED
TA GOEINT VTERAS/ TAGE EAN MAES 80 a STE Sa | RRND POE EET OT
im anzarn raps ust crs SADOUT! | 5) yas ror momo aH ne rwmana’ 90 | [PES] ears
ma vn cane Skim pene kom IS Tome Seu ay OTR Salome, ne
fre ns, SAL ae 4) COMME ELECTRICAL POWER 180 COMMECTIN TO THE Bemis
fovoos/ rams FROM SPRAY ssn NOM 7, IME COvOL PANE Te BY We LEETRCAL conTAcTOR. «| Maes
cpt cumwes)— MeTeawmuren ROSEMONT a een [Sea
oar as Pest ABADON toma te een foe Ta eat oe
esa woxcs ox vant maa SEMEL te prow [we 7m [oes _[ omeTo aN SE ESN A OUT BN
smc Ba iO. aN x 2 —
mer elu renc + [ #5a°aner he une |
TRANSFER TROUGH | | s W/ AIRLINES
[w/veworen &
re tt io
= 7 Le
Pas INET Port
~< ET BAPE
Par pre Ms
} Pel at
AR MANO: yy able
surematant yy PmesuRe GAUGE
are Tarde 10 so
_ ™ MIEW"B’-"B"
oer ~ seu a
now = otto sompnone [| YG one
8° DIA. GROUT RING “CONTROL ene ne i
4 DIA. INET 60K
aE
1 T, Oe ate er
| -—s an + rue oe
ot Oe
hate =]
[7 sow
Mu ae
Zz hz sue
|r ee
ae ah =s—_| 2-0 SE NOS
emg 7a TN cuRrER oHome
ecunianon Sie coat
ad VIEW "A’—"A" een
Tar [Sar] ae [oar] aoe ese NOTES:
weaver | @9_| voune [vaune | youve |tancva.[ eT ow 1.) ALL EXTERNAL PIPING TO THE TANK IS TO BE SUPPLIED AND
INSTALED BY Te NSTALATON CONTRACTOR
2.) FOINDATON PAD MATERALS AND OES S OETERUNED BY
| cP TONAL ECUPNENT WATERS ao a Eau Fatition _PREFASROATED PAOXAGE WASTEWATER PLANT
DUAL EQUALIZATION PUMPS SOHL40 STL OROP PIES OE-CHLORNATION |3) MATERIALS FOR ANCHORING OF TANK TO THE FOUNDATION PAD Gontrot
PULL TAM GRATING ‘ALWANZED FPN. os cama 15 To BE SUPPUED SY OTHERS Systems, Inc.
aR TYPE GRATING. DUAL BOER re ‘4) INCOMING ELECTRICAL POWER AND CONNECTION TO THE SS i, Sate 18
chases FROM Sar sre NM PE, IME COnTL PANE Io-BY We LECTMCAL conTACTOR. «| Marea
LADDERS / STARWAYS RET COMMUTER ‘BLOWERS & CONTROLS a _. ~
ANCHOR BRATS [POST AERATION [DOSNG TANK joe 6/370 | er <
cea veces onveant ose BMT sie == = ae eae eemeh Wu
el
“oe \ meee
res
Er vor mt
| ag
erigeea0 ‘ew aes ‘earan Fe
ones’ | se
tt ss fe =8-__}?'-0} VIEW A-A
Fon SON aE Paar
ration RR Sat
a ME evan vw ONS
ama?
Se [ee] ae |S || ee | hoes
ee 4 11.) ALL EXTERNAL PING TO THE TANK 1S TO BE SUPPLED AND
(PTONAL EQUIPMENT MATERILS/ TANASE
Hiorats/ TOES Sw StL CERES Omran swt Saw CS
ores Samers ion Siar Spy Sota DON TAN
2) FLNOANON PhO MATERALS mo OETERUNED 6
3) MNRAS rR NCO oH TO FNOATEN P10
4) Reome ELFRCAL PER Mo caMWECRON TO TE
PREFAERICATED PACKAGE WASTENATER PLANT
Wie
hieSNe
AEE Reo gy BER 4
LAN VIEW
po wt I fe
wom 2 | =a Sy
GROUT FONG > = 3
ri Te ft
| The
re
7S ‘DRAIN PLUGS
jae] ae) ”
zp = od I
| s- [yo ‘oronrs _
‘Spa anon Sabu YEW A-A
"we ELEVATION VIEW “ae
‘owt | Sesor] seman [aren | suoar —Touimme | rune ea [ow ta mann | wom oO NOTES:
ioen_|50" | ate [foe | whe [risen | ine [Te Taw [Tow "fein a ne Menor Src MO Pollution ‘PREFABRICATED PACKAGE. WASTEWATER PLANT
reo [om[ ow forse | [se fw [x | | a avtavono i enna a eocomnen | [PCS] coir
ETN EPH WRTERAS/ AE 1) immu or more Tw he ronan | emer oveteme, Ie $1000 GPD PACKAGE PLANT
LE LN, sel ORE REE STEERER | Oe ae [EE
some Guarino Samamsmrtarerarsen |e —™ [SS S058 =
tees Sereno Uveerot = — | SSS STS econ a [oe POrESC“al
ser oe
We NE PLAN VIEW B
A
nom tet ESN eA smuweooy (7) BEE
a _ | nym
i rd q iG
> WY HOR CrO a ASV-NOTO! WW “FLOW TRANSFER
ft 4
amie Se = wee ia)
He o- = 2 01 (BY OTHERS) a 4
FW EQUAIZATON supe AERATION TANK CORFE Ts
ewe re
HOLDING TANK ELEVATION VIEW wo see wu
con ‘iam | ame | omc ecw | fe PS SOME | WA NoTES:
|| Be | eB ee oe NOS se wes 9 an wo
SB eRe ap RCRD PRONE TOA FT
‘OPTIONAL EQUIPMENT] WATERIALS/TANKAGE 2) REBAR Dee SA MALTS SOURED Slams, ne
TELIA ae SBC Bg nS Pas Ta spit eemg mc enon no | Srey a w
BE, Ee, | omguegereremioowem sre | SSiene
was CNS Hm Ses Sum see —
voor Sane Sccumenm Sn is a
Sark, See. Sous as = = ee ee SEnog SURRTR A «= >)
aides [ gyno caneney BR EN sat se TL I |
7 +t ss Lie.
nan cas
WL = fae - Peat [ara
t SS “a
sa 4 FE HEEHL tr] | fin If seaman ie
" 4 Je BE i eid
=| I At 5
woe AL PLAN VIEW 3 2
* IEW B-B
— rene pom cere
tial
| 7
a
wot
" 7"
TOW EBORLEATON "Sn TRATION TE SFR coRNe FXNOATIN PAD —
te otDI Te TaN cota (Gr one) VIEW AWA
ELEVATION VIEWw see wu
Tat] SR IRN] SIR SIRE [SRE ror [ora owen me er] NOTES:
a, | ae [ime | ame) te [omit | Pome Pome] RO |) xr PG 10 We TA TOBE SUPPUED MO
2.) FONOATON PAD MATEAALS AND DESH 1 DeTRUMNED BY 5
FAC RRA] RSE Hemdew omen wet aCaniseeianee | EG) Sac PREF AGRIGATED PACKAGE WASTEWATER PLANT
'3) MATERALS FOR AMOIORNG OF TANK TO THE FOUNDATION PAD Systems, ine
TOL TA GUNG SORA ST. ORF PES. GREER WPS newh Pe 'S'o'ae suPrueh By ores serge me
fu nre Gime GAUMUZED PENG” PIMP CE RALS RANE MELTED |) NGOWNG LECTRCAL POVER MO CERMECTON TO THE fae
Coue/swmes) FowSursee Geaomuna SOME Ue CONTREL PANEL IS 6 THE ELECTRICAL CONTRACTOR Cra pace aa
‘mos aes GaaetER ‘is atarax TEAR RS fem a foe RR wee] wom
aes mes post ATOM Uy iswecnon — — = feces aw [we a7aifen | a 1 | POb-ESCSango x
mp X re sruce one egg oO
Bis Aeon 17 Satine Al cn
: i
as aon
Son ay EME, J. ||
areca! BARE une overaon Al an war
SNE ae PAVE VEN BoB
sauna a won, gt comma. ure BAT ATE
© on ar Sout a ¥ gone L + ossom m2) nt
oe ca
Flow suuoce ‘AERATION TANK @- 3
eouilvtnon abe ae
Tae rae ELEVATION VIEWwo =e wu conta Ta.
noms
ar] San] ener | ae uae [maw ewe mr ur ar) OO re nm RD 0
was x moar te cs PD
5 To BE SUPPURD BY OTMERS Pollution PREFABRICATED PACKAGE WASTEWATER PLANT
‘TONAL EQUIPMENT MATERINS/TANKACE ome acmarersecwese ese — |/PES] Enis”
Fe TaN SANG A comune Uv oxswercnon |S) BER Sree pen a me A | sry ey tee ane
BAR TYPE GRATING “ amet GRINDER PUMPS NEMA 4X PANEL “THE PED BY WATERTIGNT WELDON Miter Oro 45130,
Nebo twos SOI0STL OFF PES Fp wor ans AON HEME, | RETR aon eStore
Dares rmorars —OAWNID Prac roy amr etn MEMO =a
Thome Tomas SST OMTSERS — eoemanar BONES See a fae ora |
Uicoes/ Siatmars OM SORAY SYST GS CRONIN eta Tees _* PSE = See esha [soon [ee ee Dee‘tele
ta wont | a Apa wage]
; Res. |
ee mall
| d Sal raw rae| oe y
as
~ PLAN VIEW =X
{te sano. Bazar he Es Fae te soa
a
a = | Ne
“He -c- A
Alon ‘supe ERATION TANK
equaliznnon ABR 0!
7K TAN ELEVATION VIEW
W/o SDE Wa comihgr ank
ana] cae Soa | sean | nay ea [Rowe moe | wan wR] NOTES
a | | | ee ee etme ren wwe oat sam no SHE_DWG. POSB-ESC FOR SECTION VIEWS
2 URE Sse tO SEE
‘PTONAL EQUIPMENT MATERIALS /TANKACE otpeaane =e ome [PEG] cua” PREFABRICATED PACKAGE WASTEWATER PLANT
AL Taw GRATHG — INCHOR RCTS COMMUTER UV DIHFECTON 0 SPB DS ee Eat ea
fciaiworas Sos Oo Pres Fam qc as (OA AME, |S ANE AS A
BOLTED KANORALS ‘ALVANZED PPPNG Glowers a Contras | Smet Seta re nc ™
fine pues. SH ST. OFFERS Dose av
Uiooes/ Sirs ROD SPRAY SYSTEM Seen PuesLm) ere ove
’
wor on reese
ewe 0
NOTES:
1) AU EXTERNAL PENG TO THE TAM 1510.8 SUPPLED MO
2) FOUNDATION PAD WATERALS AND DESO < DETERNED By
‘He PROECT CHONEER AFTER SOL ANALYSS © COMPLETED
'8) MATERALS FOR ANGHORNG, OF TANK. TO THE FOUNDATON PAD
isTovee SUPPUED BY OTHERS
44) NEEMRG ELECTRIC. PONER ND CONNECTIN TO THE
SHE COnTROL PANEL IS BY THE ELSCTMAL CONTRACTOR
VIEW B-B
SEE DWG. POBA-ESC FOR PLAN AND ELEVATION VIEW,
paltion PREFABRICATED PACKAGE WASTEWATER PLANT
Systems, Inc.
(213) 351-165,
Samcanenscaerseneere [ms am [owe 6/30/06] een | oumena
es ea, Aes Vases aan [one 7/0/08 | 2 w 7 | PORS-ESOcount
reams
LL a
aan ret carwc
BOLTED HaNoRALS
ano TOCPLATES
Horns STARS
JPMENT/_ MATERIALS /TAKAGE
NO RCTS
Soea0 ST. OROP APS
SSN, STL OFPLSERS
CEMMNTER
DE -cHLORNATION
‘Uv osnFEcnO
nen 4x Pa
LOVER Contos
X re uc We
eu?
ATEN TANK
SECTION AA
NOTES:
1 A sumepucen pe are tas <0 oC SRLS
2) Fgvanns urs wo ray ToD By
1) nu fx wore HE ORDO PD
10 Name BEER Poe covery 2
5) Beers ar rans sono
1) bis thera sn Best A es
reap souce we 4
re 7 yeerorts I
Palaton
Syetems,Dk $0 0 «ee
some Hons at vcr ae UE oe 1
ar time aera
go, cUnET 4 | “e weir ft 5
Sottien TARE Fe] Se
oo source
RL PwHE| | | ous ogr
ho TSS wae
os 9
eI fee ree
lheo sPuce une
ra Svcs to
SECTION C-C
SECTION B-B
NOTES
) AL MERGROEEME Pre ete oF Ws 0B meD
ANUS Te Se
2) favoanot rg utes en 8 Pee BY
BERD AMS PORES TEED
sutras meme a ORSON MS
‘0 ngine GETMCLPote No coweENOL 0
SONAR PAT. PCS ae | RR ETAT
+) ueereorcrr 1 ey aes cent os
6) poe oe pao sh Me Kok YO eam Ss
‘SHIPPING UMITATIONS. HANDRAILS, LADDERS AND FLOW DIMER BOK Se ee sae ws Looe —