Joint East Palo Alto & East Palo Alto Sanitary District Intergovernmental Committee Staff Report
Joint East Palo Alto & East Palo Alto Sanitary District Intergovernmental Committee Staff Report
Recommendation
1. Receive the updates on the information requests from the Intergovernmental Committee
meeting held on August 24, 2020, and
2. Direct City and EPASD staff to prepare necessary information to begin discussing
financial plan and fair share methodology to upgrade the wastewater infrastructure for the
City approved development projects at the next Intergovernmental Committee meeting
currently scheduled for September 14, 2020.
Background
Pursuant to the intergovernmental meeting that was held on August 24, 2020, it became
imperative to develop a strategy aimed at developing a financial plan to upgrade the
existing sewer infrastructures to serve the most recently approved City General Plan. In
consideration of this, the committee agreed to bring the items listed below back for
discussion on September 14, 2020 Intergovernmental Meeting.
TABLE 1
Direction
Responsibility
Produce a map that shows the General Plan development City of EPA (lead)
footprints overlaid with EPASD’s Capital Plan – EPASD to EPASD to provide
identify where the system lacks capacity information
Overview of best practices on how impact fees should be
Done on 08/24/20
established and administered
Provide definitions and proposal of fair share for EPASD
EPASD
improvements
The purpose of this staff report is: 1) to provide the Committee with specific information on
items that staff were directed to pursue, and 2) to provide the Committee with an update
and estimated timeline for addressing outstanding items.
Analysis
Table 2 below provides the Committee with an update on the items requested during the
meeting on August 24, 2020:
TABLE 2
Status
Direction
Provide overview of City’s Development Review process Chart has been revised
As depicted in Table 2, staff will be prepared to provide the Committee with two updates
during the meeting scheduled for September 14, 2020. Those items are: 1) Produce a map
that shows the General Plan development footprint overlaid with EPASD’s Capital Plan;
EPASD to identify where the system lacks capacity; 2) customary best practices related to
how impact fees should be established and administered; and 3) Provide definitions and
proposal for fair share for EPASD improvements.
The District’s capacity charges will be calculated using three standards methods – buy-in,
incremental, and total cost attribution. These are standard methodologies that are used
throughout the utility industry and are discussed in a number of publications regarding the
development of capacity fees, one of which is the American Water Works Association’s
Manual M1, Principles of Water Rates, Fees, and Charges. Other publications that cover
capacity charges include charges George A. Raftelis, Comprehensive Guide to Water and
Wastewater Finance and Pricing, and Arthur C. Nelson, System Development Charges for
Water, Wastewater, and Stormwater Facilities.
Buy-in Method
The buy-in methodology was used in the previous 2018 Facility Capacity Charge (FCC)
Study, this capacity study did not take into consideration the infrastructural upgrade
necessary to serve new developments in the most recently approved City General Plan.
The system buy-in concept is based on the premise that new customers benefit from the
prior investment in system facilities made by existing customers. Existing customers’
investment in the system was through their payment of FCCs, rates and charges, and
property taxes over the years which were used to purchase and maintain the system
assets. New customers share in the cost of past investments in District facilities which
benefit new users. The funds are used for capital projects so the District can keep rates
low. The buy-in portion pays for the future capital costs, including improvement and
replacement projects to preserve the existing system (not day-to-day operating costs). In
turn, the District does not charge ratepayers for these projects.
This method is based on the premise that new connections to the water and wastewater
systems should be responsible for those costs related to the next increment of system
capacity required to serve them. The goal of this method is to minimize or eliminate the
need to raise rates in order to provide for system expansion. Consequently, new
customers pay fully for the additional facilities without imposing a burden on existing
customers. This approach is applicable in areas where the capacity does not exist.
An alternative methodology that blends the system buy-in and the incremental facilities
approaches is also commonly used. The total cost attribution method considers both the
replacement of existing facilities and planned expansion in the costs basis. This method is
used when significant infrastructure is already in place, but considerably more
infrastructure is required.
The conditions of the existing sewer pipes vary location by location. The conditions can be
categorized as listed below:
a) Overcapacity: In this instance, the pipe line is flowing with the hydraulic grade line
(HGL) above the pipe under peak wet weather condition.
b) At capacity: The pipe line is flowing with the HGL at the crown of the pipe during
peak wet weather condition.
c) Under capacity: The pipe line is flowing with the HGL below the crown of the pipe
during peak wet weather condition.
Each project will be evaluated in order to determine the appropriate method applicable.
The following will be considered in the evaluation.
a) Flow path
b) Capacity of existing pipes in the flow path
c) Age of the pipe
d) Structural condition of the existing pipe considering engineering properties.
e) Salvage value of the existing pipe
f) Lost opportunity cost of capital using Fisher’s Seperation
Attachments
PROCEDURE
1. The developer's engineer will submit a packet containing a completed EPASD FPR Transmittal
Form (template attached), two copies of a Draft FPR, an additional electronic copy (pdf format) of
the report on CD, and the required deposit to an EPASD Development Services Section
representative. For the current FPR deposit amount, please contact EPASD at 650-325-9021 or
services@epasd.com
All FPRs must be bound and conform to the outline describe in the FPR CONTENT section of this
document. If the project is to be constructed in phases, the number of parcels and the number of
EDUs for each phase must be indicated in the FPR.
2. An initial screening for completeness will be conducted by the District Engineer. If the report is
found to be unacceptable because it is not substantially complete, it will be returned to the
developer’s engineer without a review.
3. Complete FPRs will be reviewed by the District Engineer within approximately six weeks and
returned with comments, if necessary. If there are no comments, the Final FPR will be approved
and returned to the engineer along with a review letter. The FPR must be approved prior to the first
submittal of facility improvement plans for District review. Any re-submittal of an FPR must contain
two hardcopies and one .pdf electronic copy of the revised report and also include a copy of the
previous review letter(s) in the FPR appendix.
4. After approval of the FPR, the developer’s engineer may submit the facility improvement plans
for review. If significant changes are required to the improvement plans during the review process,
which affect the Final FPR, such changes must be reflected in an addendum to the Final FPR.
Any questions regarding FPRs or facility improvement plan reviews should be directed to the
District’s District Engineer.
EXPIRATION
The approved FPR is valid for two years from the date of approval.
FPR CONTENT
The complexity of the report will depend upon the size of the project, the number of phases and the
extent of improvements that are required. The report must conform to the following outline. All
FPR's will be bound and, at a minimum, include:
Section I – General
Completed EPASD FPR Transmittal Form (A hardcopy is attached, and electronic copies
are available on request. Please use this form as a master for future transmittals.)
Cover page containing the project name; the name, address and telephone number of the
engineer and owner/developer; the date of submittal and the Assessor’s Parcel Number(s)
Introduction
Background including:
a- Statement of whether or not the property is within the District’s service area boundary
b- Existing County zoning designation(s)
c- Identification of the CEQA document prepared for the project and a statement
regarding whether the entire project, including offsite water and/or sewer lines, are
addressed
Project description
Vicinity map
Project phasing (if applicable)
A general project boundary map, showing adjacent developments and their existing or
proposed EDU’s
Description of adjacent developments impacting or having the potential to impact this
project
Typical street cross section showing all utilities and separations
Section II – Water
Description of water demands based upon the equivalent dwelling unit (EDU) concept and
maximum demand criteria as provided in the Design Standards
APPENDIX
Copy of the tentative map (if applicable)
Copy of pertinent calculations and hydraulic modeling analysis
Sewer exhibits
EAST PALO ALTO SANITARY DISTRICT
Exceptions: ____________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
3. Project Information:
Project Name ______________________________________ Projected No. of Lots _________________________
Description ___________________________________________________________________________________
San Mateo County Project Number_________________________________________________________________
4. Site Information:
Assessor’s Parcel Number(s) _____________________________________________________________________
Current Zoning ___________________ Proposed Zoning ________________ Total Acreage ___________________
County General Plan/ Land Use Designation
Has San Mateo County or the City of East Palo Alto put a deadline for staff review associated with this request?
NO YES If yes, indicate date ______________________________________
Services being requested: Indicate the type of service and wastewater service(s) required for the project.
Type of No. of No. of Type of No. of No. of
Service Water Wastewater Service Water Wastewater
Uninstalled Services:
Account: ___________________ Water EDUs: ________ Sewer EDUs: ________
Account: ___________________ Water EDUs: ________ Sewer EDUs: ________
Comments:
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________