Load Schedule:
LTA: 00:00 - 05:00 Hrs = 300 MW
05:00 - 09:00 Hrs = 540 MW
09:00 – 15:00 Hrs= 300 MW
15:00 - 24:00 Hrs = 540 MW

UNIT - 2: Load - 321 MW, Coal flow – 205 Tph & Mill –B/C/D/E In service

Activity & Major PTW's:-

Unit # 1

1. Boiler under wet preservation. Drum Pr- 5.9 Ksc.


2. ESP all Field charged and checking done. ESP field 1241 tripped on DC voltage low, informed to EMD.
3. Furnace flue gas pressure transmitter purging done as per C&I schedule.
4. SADC UA1-AA3, BC-4, A3, A4 & FG-2 Jam condition. Rectification work under progress.
5. Condenser Pit area housekeeping work under progress.

Unit # 2

1. Soot blowing done as per boiler parameters.


2. Mill-A & Mill-F stopped during load ramp down.
3. BAS Primary steel belt return side roller no 69 replaced by MMD.Trial taken, Found ok.
4. HRSB HL-2 gland pack replaced, trial to be taken.
5. Mill-A Bunker air cannon-6 SOV replaced by ICM. Trial taken ok.
6. OLTC pumps stopped & balls collected. Pass-A 244/250, Pass-B 160/250 balls collected.
AHP:
FA: 0.7 M: Bulker -4.
BA: -/3.5 m
FGD-2 in service