The completion of this form is mandatory for all Contracts with a gross contract value >USD 1MM and recommended for all
Contracts <USD 1MM.
1.0 Introduction
(1) Item required for the 12 (twelve) (2) 7” HYD RETRIEVABLE PACKER and (3) 4-1/2” telescopic
Description of Service:
space out joint
Scope of Work
To purchase new Packer and Accessories required for the new completion equipment on the workover
(insert brief description
wells.
of the work)
Requisition Number
-
(SAP) if applicable
Business Unit/ Contract
Drilling & Workover
Coverage:
Major Stakeholders Drilling Manager
Contract Manager MLN Operations Manager: Contract Specialist Dony Rahadiyanto Kurniawan
Sponsor / Budget
Country Manager: Agus Purbaya
Holder/ Others
There are numerous tubing contractors within Algeria. Weakness: there is a high
Type of Market level of risk associated with the service. As a result, a detailed technical evaluation
(any known strengths or shall be required in order to ensure that the selected contractor has (1) a
weaknesses in the market) documented HSE management system and (2) available resources that are
competent and experienced with respect to the required work scope.
Procurement Council (extension term value > $10MM Gross < $15MM Net ) YES/NO
Country President (extension term value >$15MM Net but < $25MM Net) YES/NO
CPO&EVP (extension term value > $25MM Net. Single/Sole Source > $20MM Gross or $10MM Net) YES/NO
CEO (extension term value > $100MM Net) YES/NO
Prequalification Summary
(high level overview of how Bidders Bidders selected using public call for competition (BOASEM).
have been identified)
Incentive Scheme
KPI’s
Change Management
Handover
Justification
SIGNATURE
PRINT NAME
Date:
SIGNATURE