You are on page 1of 11

KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI

AMAN, PETALING JAYA, DALAM DAERAH PETALING

BILL NO. 1 : PRELIMINARIES & GENERAL CONDITIONS

ITEM DESCRIPTION UNIT QTY. RATE (RM) AMOUNT (RM)

1.0 GENERAL
1.1
1.2
1.3
1.4
1.5
1.6
1.7

A1/1 -

GENERAL (cont'd)
1.8
1.9
1.10
A1/2 -

2.0 MEASUREMENT
2.1
3.0 UNPRICED ITEM
3.1
4.0 G.ATTENDANCE
4.1
5.0 PHASING SEQUENCE
5.1

A1/3 -

6.0 TRIALS
6.1
7.0 EXISTING SERVICES
7.1
8.0 WORK UNDER WATER
7.1
9.0 PHRASEOLOGY
9.1
10.0 PV SUMS
10.1
11.0 CURRENCY PAYMENT
11.1
12.0 TEMPORARY DIVERSION
12.1

A1/4 -

13.0 ABBREVIATIONS
13.1
14.0 SCOPE OF WORKS
A
B
C
D
E
F
13.0 LOCATION OF SITE
H

A1/5 -

PROJECT SIGNBOARD
A 3,000.00
SITE SURVEY
B 3,000.00
TEMPORARY DIVERSION

CONSTRUCTION PLAN
C 1,000.00
CONTRACTOR PLANT
E 5,000.00
TEMPORARY WATER
F 1,000.00

A1/6 13,000.00

SITE SECURITY
A 3,000.00
TEMPORARY ACCESS & MAINTENANCE ROAD
B 3,000.00
C
D
CONTROL WORKMEN
E 1,000.00
CONTRACTOR ACCOMMODATION
F 3,000.00
CONTRACTOR OFFICE
G 5,000.00
CARE & PROTECTION
H 3,000.00
SHOP DRAWING
J 1,500.00
A1/7 19,500.00

PROGRESS PHOTOGRAPHS
A 1,000.00
MATERIAL TEST
B 1,000.00
OFFICE ACCOMMODATION
C 5,000.00
TELEPHONE
D 3,000.00
SURVEY ISTRUMENT
E 1,000.00
SITE ITEM
F 1,000.00
G 1,000.00
H 2,000.00
J 1,000.00

A1/8 16,000.00

SAFE WORKING AREA


A 2,000.00
B 5,000.00
SAFETY, HEALTH
C 1,000.00
D
E 5,000.00
F 500.00
G 500.00
H 1,000.00
KEEPING SITE TIDY
J 2,000.00
LEGISLATION
K 1,000.00

A1/9 18,000.00

COORDINATION 0F MECHI
A
AS BUILT DRWG
B 1,000.00
CLEAR, CLEAN
C 3,000.00
FORM CONTRACT
D 500.00
CLAUSE 13
E PERFORMANCE BOND 500.00
CLAUSE 15
F 1,500.00
CLAUSE 16
G 100.00
CLAUSE 17
H 100.00
CLAUSE 18
J 2,000.00

A1/10 8,700.00

FORM CONTRACT (cont`d)


CLAUSE 22
A 1,000.00
CLAUSE 35
B 1,000.00
CLAUSE 59
C 5,000.00

A1/11 7,000.00

COLLECTION
A1/1 -
A1/2 -
A1/3 -
A1/4 -
A1/5 -
A1/6 13,000.00
A1/7 19,500.00
A1/8 16,000.00
A1/9 18,000.00
A1/10 8,700.00
A1/11 7,000.00

A1/12 82,200.00
KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI
AMAN, PETALING JAYA, DALAM DAERAH PETALING

ITEM DESCRIPTION UNIT QTY. RATE (RM) AMOUNT (RM)

2.0 KERJA-KERJA PEMBAIKAN BUMBUNG BLOK B


2.1 1250 30.00 37,500.00
2.2 1250 95.00 118,750.00
2.3 85 40.00 3,400.00
2.4 200 35.00 7,000.00
2.5 170 90.00 15,300.00
2.6 160 61.00 9,760.00
2.7 300 52.00 15,600.00
2.8 800 35.00 28,000.00
KERJA-KERJA MEMASANG SILING BLOK B
2.9 650 19.00 12,350.00
2.10 1000 10.00 10,000.00
2.11 1250 23.00 28,750.00
2.12 1250 9.00 11,250.00

SK 2 - 1/2 297,660.00

JUMLAH DIBAWA 297,660.00


2.13 1 5,000.00 5,000.00
2.14 4 500.00 2,000.00

7,000.00
MS TERKUMPUL
SK 2 - 1/2 297,660.00
SK 2 - 2/2 7,000.00

SK 2 - 2/2 304,660.00
KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI
AMAN, PETALING JAYA, DALAM DAERAH PETALING

ITEM DESCRIPTION UNIT QTY. RATE (RM) AMOUNT (RM)

3.0 KERJA-KERJA PEMBAIKAN BUMBUNG BLOK C


3.1 980 30.00 29,400.00
3.2 980 95.00 93,100.00
3.3 70 40.00 2,800.00
3.4 166 35.00 5,810.00
3.5 140 90.00 12,600.00
3.6 70 61.00 4,270.00
3.7 300 52.00 15,600.00
3.8 800 35.00 28,000.00
KERJA-KERJA MEMASANG SILING BLOK C
3.9 500 19.00 9,500.00
3.10 800 10.00 8,000.00
3.11 980 23.00 22,540.00
3.12 980 9.00 8,820.00

SK 3 - 1/2 240,440.00

JUMLAH DIBAWA 240,440.00


3.13 1 5,000.00 5,000.00
3.14 4 500.00 2,000.00

7,000.00
MS TERKUMPUL
SK 3 - 1/2 240,440.00
SK 3 - 2/2 7,000.00

SK 3 - 2/2 247,440.00
KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI
AMAN, PETALING JAYA, DALAM DAERAH PETALING

ITEM DESCRIPTION UNIT QTY. RATE (RM) AMOUNT (RM)

4.0 KERJA-KERJA PEMBAIKAN BUMBUNG BLOK D


4.1 980 30.00 29,400.00
4.2 980 95.00 93,100.00
4.3 70 40.00 2,800.00
4.4 166 35.00 5,810.00
4.5 140 90.00 12,600.00
4.6 70 61.00 4,270.00
4.7 300 52.00 15,600.00
4.8 800 35.00 28,000.00
KERJA-KERJA MEMASANG SILING BLOK D
4.9 500 19.00 9,500.00
4.10 800 10.00 8,000.00
4.12 980 23.00 22,540.00
4.13 980 9.00 8,820.00

SK 4 - 1/2 240,440.00

JUMLAH DIBAWA 240,440.00


4.14 1 5,000.00 5,000.00
4.15 4 500.00 2,000.00

7,000.00
MS TERKUMPUL
SK 4 - 1/2 240,440.00
SK 4 - 2/2 7,000.00

SK 4 - 2/2 247,440.00
KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI
AMAN, PETALING JAYA, DALAM DAERAH PETALING

ITEM DESCRIPTION UNIT QTY. RATE (RM) AMOUNT (RM)

5.0 KERJA-KERJA PEMBAIKAN BUMBUNG BLOK E


5.1 660 30.00 19,800.00
5.2 660 95.00 62,700.00
5.3 40 40.00 1,600.00
5.4 110 35.00 3,850.00
5.5 80 90.00 7,200.00
5.6 60 61.00 3,660.00
5.7 200 52.00 10,400.00
5.8 500 35.00 17,500.00
KERJA-KERJA MEMASANG SILING BLOK E
2.9 500 19.00 9,500.00
2.10 800 10.00 8,000.00
2.11 660 23.00 15,180.00
2.12 660 9.00 5,940.00
2.13 1 5,000.00 5,000.00

SK 5 - 1/2 170,330.00

JUMLAH DIBAWA 170,330.00


5.2.1 110 279.00 30,690.00
5.2.2 40 61.00 2,440.00
5.2.3 100 168.00 16,800.00
5.2.4 20 65.00 1,300.00
5.2.5 100 30.00 3,000.00
5.2.6 50 310.00 15,500.00
5.2.7 200 25.00 5,000.00
5.2.8 40 30.00 1,200.00

75,930.00
MS TERKUMPUL
SK 5 - 1/2 170,330.00
SK 5 - 2/2 75,930.00

SK 5 - 2/2 246,260.00