Professional Documents
Culture Documents
Technical Specification
for
Design, Fabrication and Installation of Cooling Tower
1. Introduction:
A new Cooling tower is to be Designed, fabricated and installed at site location.
2. Scope of work:
i. Design, Fabrication and supply of 2X225 Ton non standard (customised) Cooling
tower considering the space constraint of existing layout.
ii. Installation of cooling tower and integration with existing header lines.
iii. FAT and SAT .
iv. Technical Documents has to be supplied.
3. Technical Specification:
Installation:
• Installation will consist of laying down I section beam (2 Nos of: WB 400 and 3.2 m
length) for each tower on the pedestals for support and fixing it with bolts of suitable
dimensions.
• Additional pedestal for support to I section if required should be constructed.
• On this I section beams cooling towers will rest.
• Installation and integration of piping with existing piping system.
1
ANNEXURE
• Verification of raw material certificate and test certification of bought out
items.
Documents :
• Drawing and quality assurance plan should be supplied by vendor and the same
should be approved through purchaser.
• Operation and maintenance manual should be supplied.
• All stages inspection report and raw material test certificate to be supplied.
4. Completion Period:
Order shall be placed on party for supply of material & execution of job as defined in
scope of work. The entire scope of work as stipulated in the tender document shall be
completed in 8 months.
2
ANNEXURE
Existing layout
3
ANNEXURE
4
ANNEXURE
Technical Datasheet :