Overload Overload verifications are made according the following relations: IB <= In <= Iz and I2 <= 1.45*Iz
Legenda:
In = nominal current of the protective device (For adjustable protective devices, the nominal current In is the current setting selected)
I2 = current ensuring effective operation in the conventional time of the protective device
Short Circuit Circuit breakers and fuses are dimensioned with a breaking capacity higher than the maximum short circuit current in the point of installation
Circuit breakers dimensioned according to IEC 60497-2 are also chosen with the making capacity Icm higher than the maximum peak current
The protection against short circuit must satisfy the rule I²t <= K²S²
Legenda:
I²t = let-through energy at the maximum short circuit current (defined by the producer)
K = factor defined in IEC60364-4-43 table 43A and IEC60364-5-54 tables A.54.2, A.54.4 and A-54.5
Indirect contact TT systems: the verification is Idn * Ra <= Vo, or Im <= Ib min
Legenda:
Ra = earthing resistance
Discrimination and Back-up The discrimination and back-up values are determined by the producer with laboratory tests
Discrimination required in the installation (see indications on the single-line and the Discrimination report
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
Short-circuit calculation hypothesis for IEC 60909-0
Calculation algorithm
The calculation of maximum and minimum, balanced and unbalanced, short-circuit currents is made by application of symmetrical components.
General conditions
The calculation of maximum and minimum short-circuit currents is based on the following simplifications.
a) For the duration of the short circuit, there is no change in the type of short circuit involved (a three-phase short circuit remains three-phase)
b) For the duration of the short circuit, there is no change in the network involved.
e) All line capacitances and shunt admittances and non-rotating loads, except those of the zero-sequence system, are neglected.
In the calculation of maximum short-circuit currents, the following conditions have been considered:
- it is chosen the network configuration which leads to the maximum value of short-circuit current at the short-circuit location
- the contribution of asynchronous motors is considered if their contribution is higher than 5% of the initial short-circuit current calculated without motors
- resistance RL of lines (overhead lines and cables) are introduced at a temperature of 20°C
In the calculation of minimum short-circuit currents, the following conditions have been considered:
- it is chosen the network confguration which lead to the minimum value of short-circuit current at the short-circuit location
- resistance RL of lines (overhead lines and cables) are introduced at a temperature of 250°C (EPR),160°C (PVC) or 140°C (PVC >300m²)
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
A
Un [V] 33000
Ik LLL [kA] 17.5
P [kW] 595.2
Q [kvar] 28.9
E -TM1
TR-1
Un2 = 400 V
Sn = 1000 kVA
Sec.: LLLN / TN-S
F -WC1
TR-1
12x(1x630)+2G630
Ib = 829.0 A
Iz = 2452.8 A
dV = 0.16 %
L = 30 m
G
-QF1
E1.2N 1600 Ekip Touch LSIG 1600
TR-1
*
-B1
FU = 0.80
U=411.3 V
IB = 829.0 A
Cosphi = 1.00
I Ik max = 23.1 kA
-QF2 -QF3 -QF4 -QF5 Ik LLL = 23.1 kA
T6S 630 PR221DS-LS/I 630A T6S 630 PR221DS-LS/I 630A T6S 630 PR221DS-LS/I 630A E1.2C 800 Ekip Touch LI 800
FP-502-RZ2-001 FP-501-RZ2-002 FP-502-RZ2-003 *
* * *
K
-WC2 -WC5 -WC3 -WC4
FP-502-RZ2-001 FP-501-RZ2-002 FP-502-RZ2-003 2x 4G120/70
2x 5G185 2x 5G185 2x 5G185 IB = 493.6 A
Ib = 383.6 A Ib = 383.6 A Ib = 383.6 A Iz = 609.0 A
Iz = 829.9 A Iz = 829.9 A Iz = 829.9 A du = 0.21
dV = 1.63 % dV = 1.26 % dV = 1.47 % L = 20 m
L = 142 m L = 110 m L = 128 m
L
-L1 -L3 -L2 -C1
FP-502-RZ2-001 FP-501-RZ2-002 FP-502-RZ2-003 Sn = 342.00 kVA
Sn = 265.80 [kVA] Sn = 265.80 [kVA] Sn = 265.80 [kVA] Q = 352.33 kvar
Cosphi (nominal) = 0.90 Cosphi (nominal) = 0.90 Cosphi (nominal) = 0.90 IB = 493.6 A
In = 383.6 [A] In = 383.6 [A] In = 383.6 [A]
U = 404.9 [V] U = 406.3 [V] U = 405.5 [V]
M dU = 0.00 % dU = 0.00 % dU = 0.00 %
P = 242.12 [kW] P = 243.00 [kW] P = 242.51 [kW]
Q = 117.27 [kvar] Q = 117.69 [kvar] Q = 117.45 [kvar]
T
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
Distribution
Reference voltage [V] 33000 Symmetrical short circuit current LLL [kA] 17.50
Phases LLL Line-Neutral short circuit current LN [kA]
Distribution system IT Line-Ground short circuit current LPE [kA]
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
Transformers
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
Short circuit calculation
Switchboard Ib LLL (kA) Ip LLL (kA) Ib LL (kA) Ip LL (kA) Ib LN (kA) Ip LN (kA) Ib LPE (kA) Ip LPE (kA)
IP-EV13-MDB-2 23.15 51.16 20.04 44.30 21.48 47.47 21.42 47.35
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
Protection of Lv Cables
-WC1 TR-1
Phases - Distribution System LLLN / TN-S Overload: protected by -QF1 E1.2N 1600 Ekip Touch LSIG 1600
Load data
Protection checks
Cosphi 1.00
Cable cross-sections 12x(1x630)+2G630
Conductor - Insulator Cu / EPR/XLPE Indirect touch at terminal 2 (current flowing downstream): protected by
Length (m) [m] 30 2
Cable
-WC2 FP-502-RZ2-001
Phases - Distribution System LLLN / TN-S Overload: protected by -QF2 T6S 630 PR221DS-LS/I 630A
Load data
Passed
Voltage [V] 400 IB (383.65[A]) <= Ith (554.40[A]) <= Iz (829.92[A]) and If (720.72[A]) <= 1.45*Iz (1203.38[A]); Uref=400V
IB (A) [A] 383.6
1 Short circuit at terminal 1 (current flowing downstream): protected by -QF2 T6S 630 PR221DS-LS/I 630A
Cosphi 0.88 Protection checks Passed
Protection guaranteed up to Ik LLL (23.15[kA]), Ik LN (21.48[kA]), Ik L-PE (21.42[kA]); Uref=400V
Cable cross-sections 2x 5G185
Conductor - Insulator Cu / EPR/XLPE Indirect touch at terminal 2 (current flowing downstream): protected by -QF2 T6S 630 PR221DS-LS/I 630A
Passed
Length (m) [m] 142 2 I@Max tripping time ( 1.04[kA])<=Ikmin L-PE ( 3.81[kA]); Trip time=5.00[s]; Uref=400V
Cable
-WC3 FP-502-RZ2-003
Phases - Distribution System LLLN / TN-S Overload: protected by -QF4 T6S 630 PR221DS-LS/I 630A
Load data
Passed
Voltage [V] 400 IB (383.65[A]) <= Ith (403.20[A]) <= Iz (829.92[A]) and If (524.16[A]) <= 1.45*Iz (1203.38[A]); Uref=400V
IB (A) [A] 383.6
1 Short circuit at terminal 1 (current flowing downstream): protected by -QF4 T6S 630 PR221DS-LS/I 630A
Protection checks
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 2 2
Protection of Lv Cables
-WC4
Phases - Distribution System LLL / TN-S Overload: protected by -QF5 E1.2C 800 Ekip Touch LI 800
Load data
Passed
Voltage [V] 400 IB (493.63[A]) <= Ith (528.80[A]) <= Iz (608.96[A]) and If (687.44[A]) <= 1.45*Iz (882.99[A]); Uref=400V
IB (A) [A] 705.9
1 Short circuit at terminal 1 (current flowing downstream): protected by -QF5 E1.2C 800 Ekip Touch LI 800
Protection checks
Cosphi 0.04 Passed
Protection guaranteed up to Ik LLL (23.15[kA]), Ik L-PE (21.42[kA]); Uref=400V
Cable cross-sections 2x 4G120/70
Conductor - Insulator Cu / EPR/XLPE Indirect touch at terminal 2 (current flowing downstream): protected by -QF5 E1.2C 800 Ekip Touch LI 800
Passed
Length (m) [m] 20 2 I@Max tripping time ( 1.32[kA])<=Ikmin L-PE (11.48[kA]); Trip time=5.00[s]; Uref=400V
Cable
-WC5 FP-501-RZ2-002
Phases - Distribution System LLLN / TN-S Overload: protected by -QF3 T6S 630 PR221DS-LS/I 630A
Load data
Passed
Voltage [V] 400 IB (383.65[A]) <= Ith (403.20[A]) <= Iz (829.92[A]) and If (524.16[A]) <= 1.45*Iz (1203.38[A]); Uref=400V
IB (A) [A] 383.6
1 Short circuit at terminal 1 (current flowing downstream): protected by -QF3 T6S 630 PR221DS-LS/I 630A
Cosphi 0.88 Protection checks Passed
Protection guaranteed up to Ik LLL (23.15[kA]), Ik LN (21.48[kA]), Ik L-PE (21.42[kA]); Uref=400V
Cable cross-sections 2x 5G185
Conductor - Insulator Cu / EPR/XLPE Indirect touch at terminal 2 (current flowing downstream): protected by -QF3 T6S 630 PR221DS-LS/I 630A
Passed
Length (m) [m] 110 2 I@Max tripping time ( 2.05[kA])<=Ikmin L-PE ( 4.67[kA]); Trip time=5.00[s]; Uref=400V
Cable
Voltage [V]
IB (A) [A]
1 Short circuit at terminal 1 (current flowing downstream): protected by
Protection checks
Cosphi
Cable cross-sections
Conductor - Insulator Indirect touch at terminal 2 (current flowing downstream): protected by
Length (m) [m] 2
Cable
Iz (A) [A]
1 Short circuit at terminal 2 (current flowing upstream): protected by
dU (%)
Work Temp (°C) [°C]
Power loss [W] Indirect touch at terminal 1 (current flowing upstream): protected by
K²S² [A2s] 2
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 2 2
List of LV devices
Sign Part code Type RCD code RCD type User description 1 User description 2
-QF1 1SDA071516R1 E1.2N 1600 Ekip Touch LSIG 1600 TR-1
-QF2 1SDA060236R1 T6S 630 PR221DS-LS/I 630A FP-502-RZ2-001
-QF3 1SDA060236R1 T6S 630 PR221DS-LS/I 630A FP-501-RZ2-002
-QF4 1SDA060236R1 T6S 630 PR221DS-LS/I 630A FP-502-RZ2-003
-QF5 1SDA070754R1 E1.2C 800 Ekip Touch LI 800
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
Report of LV circuit breakers
B Sign Enclosure Poles In (A) Icu-Icn (kA) Ics (kA) Thermal (A) L I1 S I2 S2 I2-2 I G I4 R I5 InN/In (%) Id (A) Td (s)
Type User description 1 Magnetic (A) Curve L t1 Curve S t2 Curve S2 t2-2 I3 Curve G t4 t5 RCB type
C -QF1 IP-EV13-MDB-2
4P 1600 66.0 66.0 On 0.90 On 1.70 Off Off (null)
E1.2N 1600 Ekip Touch LSIG 1600 TR-1 IEC60947-2 52s t const. 0.11s 15.00 I2t const.
D -QF2 IP-EV13-MDB-2
3P 630 50.0 0.0 On 0.88 Off On (null)
E -QF3 IP-EV13-MDB-2
3P 630 50.0 0.0 On 0.64 Off On (null)
F -QF4 IP-EV13-MDB-2
3P 630 50.0 0.0 On 0.64 Off On (null)
G -QF5 IP-EV13-MDB-2
3P 800 50.0 0.0 On 0.66 On (null)
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
N Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
List of Lv Cables
-WC1 TR-1
Phases - Distribution System LLLN / TN-S IB L1 [A] 829.0 R Ph 20°C [mOhm] 0.29
Voltage [V] 400 IB L2 [A] 829.0 R Ph 160-250°C [mOhm] 0.56
Cable cross-sections 12x(1x630)+2G630 IB L3 [A] 829.0 X Ph [mOhm] 1.85
Conductor - Insulator Cu / EPR/XLPE IB N [A] 0.0 R N 20°C [mOhm] 0.29
Method 31 Cosphi 1.00 R N 160-250°C [mOhm] 0.56
K factor 0.71 Iz (A) [A] 2452.8 XN [mOhm] 1.85
Length (m) [m] 30 dU (%) [%] 0.16 R PE 20°C [mOhm] 0.44
Ib max (kA) [kA] 25.59 Power Loss (W) [W] 2158.4 R PE 160-250°C [mOhm] 0.85
Ib min (kA) [kA] Work Temp (°C) [°C] 63.9 X PE [mOhm] 2.77
-WC2 FP-502-RZ2-001
Phases - Distribution System LLLN / TN-S IB L1 [A] 383.6 R Ph 20°C [mOhm] 7.10
Voltage [V] 400 IB L2 [A] 383.6 R Ph 160-250°C [mOhm] 13.64
Cable cross-sections 2x 5G185 IB L3 [A] 383.6 X Ph [mOhm] 6.30
Conductor - Insulator Cu / EPR/XLPE IB N [A] 0.0 R N 20°C [mOhm] 7.10
Method 31 Cosphi 0.88 R N 160-250°C [mOhm] 13.64
K factor 0.91 Iz (A) [A] 829.9 XN [mOhm] 6.30
Length (m) [m] 142 dU (%) [%] 1.63 R PE 20°C [mOhm] 14.21
Ib max (kA) [kA] 23.15 Power Loss (W) [W] 3423.1 R PE 160-250°C [mOhm] 27.28
Ib min (kA) [kA] 3.81 Work Temp (°C) [°C] 42.8 X PE [mOhm] 12.61
-WC3 FP-502-RZ2-003
Phases - Distribution System LLLN / TN-S IB L1 [A] 383.6 R Ph 20°C [mOhm] 6.40
Voltage [V] 400 IB L2 [A] 383.6 R Ph 160-250°C [mOhm] 12.29
Cable cross-sections 2x 5G185 IB L3 [A] 383.6 X Ph [mOhm] 5.68
Conductor - Insulator Cu / EPR/XLPE IB N [A] 0.0 R N 20°C [mOhm] 6.40
Method 31 Cosphi 0.88 R N 160-250°C [mOhm] 12.29
K factor 0.91 Iz (A) [A] 829.9 XN [mOhm] 5.68
Length (m) [m] 128 dU (%) [%] 1.47 R PE 20°C [mOhm] 12.81
Ib max (kA) [kA] 23.15 Power Loss (W) [W] 3085.6 R PE 160-250°C [mOhm] 24.59
Ib min (kA) [kA] 4.14 Work Temp (°C) [°C] 42.8 X PE [mOhm] 11.37
-WC4
Phases - Distribution System LLL / TN-S IB L1 [A] 493.6 R Ph 20°C [mOhm] 1.54
Voltage [V] 400 IB L2 [A] 493.6 R Ph 160-250°C [mOhm] 2.96
Cable cross-sections 2x 4G120/70 IB L3 [A] 493.6 X Ph [mOhm] 0.89
Conductor - Insulator Cu / EPR/XLPE IB N [A] R N 20°C [mOhm]
Method 31 Cosphi 0.04 R N 160-250°C [mOhm]
K factor 0.88 Iz (A) [A] 609.0 XN [mOhm]
Length (m) [m] 20 dU (%) [%] 0.21 R PE 20°C [mOhm] 2.64
Ib max (kA) [kA] 23.15 Power Loss (W) [W] 3141.7 R PE 160-250°C [mOhm] 5.08
Ib min (kA) [kA] 11.48 Work Temp (°C) [°C] 110.6 X PE [mOhm] 0.91
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 2 2
List of Lv Cables
-WC5 FP-501-RZ2-002
Phases - Distribution System LLLN / TN-S IB L1 [A] 383.6 R Ph 20°C [mOhm] 5.50
Voltage [V] 400 IB L2 [A] 383.6 R Ph 160-250°C [mOhm] 10.57
Cable cross-sections 2x 5G185 IB L3 [A] 383.6 X Ph [mOhm] 4.88
Conductor - Insulator Cu / EPR/XLPE IB N [A] 0.0 R N 20°C [mOhm] 5.50
Method 31 Cosphi 0.88 R N 160-250°C [mOhm] 10.57
K factor 0.91 Iz (A) [A] 829.9 XN [mOhm] 4.88
Length (m) [m] 110 dU (%) [%] 1.26 R PE 20°C [mOhm] 11.01
Ib max (kA) [kA] 23.15 Power Loss (W) [W] 2651.7 R PE 160-250°C [mOhm] 21.13
Ib min (kA) [kA] 4.67 Work Temp (°C) [°C] 42.8 X PE [mOhm] 9.77
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 2 2
Discrimination
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1
List of Loads
-L1 FP-502-RZ2-001
Phases - Distribution System LLLN / TN-S Utilization factor [%] 100 Computed voltage [V] 404.9
Rated voltage [V] 400 Active power P [kW] 242.12 Max allowed voltage drop by Standard [%] 4.0
IB [A] 383.6 Reactive power Q [kvar] 117.27 Max allowed voltage drop by user [%] 4.0
Cosphi 0.90 Computed voltage drop [%] 0.00
-L2 FP-502-RZ2-003
Phases - Distribution System LLLN / TN-S Utilization factor [%] 100 Computed voltage [V] 405.5
Rated voltage [V] 400 Active power P [kW] 242.51 Max allowed voltage drop by Standard [%] 4.0
IB [A] 383.6 Reactive power Q [kvar] 117.45 Max allowed voltage drop by user [%] 4.0
Cosphi 0.90 Computed voltage drop [%] 0.00
-L3 FP-501-RZ2-002
Phases - Distribution System LLLN / TN-S Utilization factor [%] 100 Computed voltage [V] 406.3
Rated voltage [V] 400 Active power P [kW] 243.00 Max allowed voltage drop by Standard [%] 4.0
IB [A] 383.6 Reactive power Q [kvar] 117.69 Max allowed voltage drop by user [%] 4.0
Cosphi 0.90 Computed voltage drop [%] 0.00
Rev. n°1 Date: 11/10/2021 Description Customer: AL FAYHAA Construction & Contracting Drawing number:
Rev. n°2 Drafter: IP-EV13-MDB-2 Project: Coastal Village (COV) infrastructure package
Rev. n°3 Design.: Engr. Abuzer Banderkar File: Sheet: Next sheet: Sheets:
REVISIONS Date: Signatures Approval: Serial: 1 1