PART A

Package C04A – SUBSTRUCTURE AND SUPERSTRUCTURE

Tender Interview (TBD)

Bidders are required to confirm compliance to the followings:


(please sign next to every answer)

Compliance
1. TECHNICAL
(YES/NO)
1.1 THE EXPANSION REINFORCING BAND for Level 1~Level 4 of K1
Building should comply with below design requirement:

1. CONCRETE MIX FOR BUILDING K1 (PRODUCTION) SHALL


BE AS BELOW:-
- FOR CONCRETE WITHIN THE EXPANSION REINFORCING
BAND ZONE, THE CONCRETE GRADE SHALL BE Grade G40 &
MIXED WITH MICRO-EXPANSION AGENT/ADMIXTURE (ZY OR
CALCIUM SULFOALUMINATE ANTI-CRACKING &
WATERPROOFING AGENT HEA OR EQUIVALENT), WITH
LIMITED EXPANSION RATE ≥0.03%.
- FOR ALL OTHER AREAS (OUTSIDE THE EXPANSION
REFORCING BAND ZONE), THE CONCRETE GRADE SHALL BE
G35 & MIXED WITH MICRO-EXPANSION AGENT/ADMIXTURE
( ZY OR CALCIUM SULFOALUMINATE ANTI-CRACKING &
WATERPROOFING AGENT HEA OR EQUIVALENT), WITH
LIMITED EXPANSION RATE ≥0.02%.
2. ADMIXTURE SPECS & CONCRETE MIX DESIGN TO BE
SUBMITTED FOR ENGINEER’S APPROVAL & TRAIL MIX &
STRENGTH TEST TO BE CARRIED OUT PRIOR TO
COMMENCEMENT OF WORK.
3. THE CONCRETE WITHIN THE EXPANSION BAND ZONE
SHALL BE CAST AT LEAST 7-14 DAYS AFTER THE CONCRETE
ON BOTH SIDES OF REINFORCING BAND ZONE IS CASTED.

Be noted for below requirement except the above items;


1.Bidders should fully consider the sufficient quantity & continuous
supply of CONCRETE MIX in quotation and future construction;
2. Specifications, catalogues & dosage of material / admixtures used for
Concrete Mix need to be submitted together with the tender return
documents;
3. Method Statement for construction of concrete floor / beam and
expansion reinforcing band need to be submitted together with the
technical tender return documents. The sequence of construction to be
indicated in layout plan.

Page 1|2
PART A

Package C04A – SUBSTRUCTURE AND SUPERSTRUCTURE

Tender Interview (TBD)

Bidders are required to confirm compliance to the followings:


(please sign next to every answer)

Page 2|2

You might also like