You are on page 1of 10

STAAD.

Pro Report
To: From:  

ca/
  Copy to: Date: 29/03/2015 Ref:
Document2

Job Information
Engineer Checked Approved
Name: LISMAWATI FURI    
Date: 28-Mar-15    

Structure Type SPACE FRAME

Number of Nodes 2 Highest Node 2


Number of Elements 1 Highest Beam 1

Number of Basic Load Cases 2


Number of Combination Load 1
Cases
Included in this printout are data
for:
All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name
BEBAN
Combination 3
KOMBINASI

Node Displacements

30/12/2021
X Y Z Resultant rX rY rZ
Node L/C
(mm) (mm) (mm) (mm) (rad) (rad) (rad)
3:BEBAN
1 0 0 0 0 0 0 -0.016
KOMBINASI
3:BEBAN
2 0 0 0 0 0 0 0.015
KOMBINASI

30/12/2021
Max: 57.541 mm

Y
Z X Load 3 : Displacement
Displacement - mm

Whole Structure Displacements 20mm:1m 3 BEBAN KOMBINASI (Input data was modified after picture taken)

30/12/2021
Beam Maximum Moments

Distances to maxima are given from beam end A.


Length d Max My d Max Mz
Beam Node A L/C  
(m) (m) (kNm) (m) (kNm)

3:BEBAN
1 1 12 Max -ve 0 0 12 0
KOMBINASI

30/12/2021
Max: -90.175 kNm

Y
Z X Load 3 : Bending Z
Moment - kNm

Whole Structure Mz 30kNm:1m 3 BEBAN KOMBINASI (Input data was modified after picture taken)

30/12/2021
Beam Maximum Shear Forces

Distances to maxima are given from beam end A.


Length d Max Fz d Max Fy
Beam Node A L/C  
(m) (m) (kg) (m) (kg)

3:BEBAN
1 1 12 Max -ve 0 0 0 3186
KOMBINASI

30/12/2021
Max: 3e+003 kg

-2e+003 kg

Y
Z X Load 3 : Shear Y
Force - kg

Whole Structure Fy 1100kg:1m 3 BEBAN KOMBINASI (Input data was modified after picture taken)

30/12/2021
-53 kg

-193 kg/m -33 kg

12 m

Y
Z X
Load 2

Whole Structure (beban+angka)

30/12/2021
1 12 m 2

Y
Z X
Load 2

Whole Structure ( node+angka)

30/12/2021
1 = 12 m

Y
Z X
Load 1

Whole Structure (beam+angka)

30/12/2021