Professional Documents
Culture Documents
𝑉2 1102
Check for Rmin 𝑅 = 127(𝑒+𝑓) = 127(0.06+0.1)
= 595 𝑚
Available R = 510 m cannot keep 110kph as design speed.
Adjusted design speed 𝑉 = √127𝑅(𝑒 + 𝑓)
= √(127)(510)(0.06 + 0.1)
= 102 𝑘𝑝ℎ 𝑜𝑟 100 𝑘𝑝ℎ
𝜋
Available length of sight 𝐿𝑠 = 𝜃𝑅 = (60) (180) (510) = 533.8 𝑚
PSD = d1 + d2 + d3 + d4
𝑎𝑡1 2.37(4.3)
𝑑1 = 0.278𝑡1 (𝑣 − 𝑚 + ) = (0.278)(4.3)(90 − 15 + = 95.7 𝑚
2 2
𝑑3 = 75𝑚
2 2
𝑑4 = 3 𝑑2 = 3 (267.7) = 178.5 𝑚
Need to put up sign to warn drivers to reduce their speed from 100 kph on the tangent to 90 kph on the curve.
𝑉 2 −𝑉 2 1002 −902
1 2
𝑆𝑆𝐷 = 0.278𝑉1 𝑡 + 254(𝑓±𝐺) = (0.278)(100)(2.5) + 254(0.35) = 90.87 𝑚
Ideal Segment
Travel Stop Reason Spped Segment Segment Net
Cross Distance Travel Travel
Time Time for Limit Speed Delay Speed
Road (m) Time Time
(sec) (sec) Stop (kph) (kph) (sec) (kph)
(sec) (sec)
Average Travel Speed = 7000 m/597.7 sec = 11.7116 m/sec = 42.16 kph.
275 755 309 485 635 218 185 424 296 292 509 214
L T R L T R L T R L T R
WEST NORTH EAST SOUTH
635
218 485
275 296
755 424
309 185
292 214
509
Q2c
WEST NORTH EAST SOUTH
L T R L T R L T R L T R
07:00 – 07:15 25 120 30 45 100 25 12 89 28 54 75 12
07:15 – 07:30 32 135 35 52 105 28 18 95 36 56 85 18
07:30 – 07:45 38 140 45 63 110 30 20 105 45 59 96 25
07:45 – 08:00 45 145 56 75 108 35 25 125 55 65 125 36
08:00 – 08:15 55 155 65 85 125 39 28 135 63 68 135 48
08:15 – 08:30 60 160 68 95 136 40 30 120 75 70 145 55
08:30 – 08:45 78 175 75 105 140 45 35 115 85 55 150 50
08:45 – 09:00 56 185 72 125 155 55 45 104 70 72 124 61
09:00 – 09:15 66 205 77 135 165 58 52 105 75 85 120 53
09:15 – 09:30 75 190 85 120 175 60 53 100 66 80 115 50
09:30 – 09:45 58 185 62 110 189 62 50 98 58 70 118 45
09:45 – 10:00 45 175 65 115 195 68 48 95 54 69 101 38
10:00 – 10:15 50 166 60 98 201 75 39 92 48 58 98 35
10:15 – 10:30 65 154 56 90 215 52 38 91 45 49 95 28
10:30 – 10:45 35 132 55 85 225 48 35 85 40 42 85 27
10:45 – 11:00 32 125 48 82 200 35 32 80 35 40 80 25
11:00 – 11:15 28 128 45 81 198 33 30 75 32 38 75 20
11:15 – 11:30 30 110 43 75 175 30 28 73 33 35 70 15
11:30 – 11:45 25 105 42 72 165 28 25 72 30 36 65 18
11:45 – 12:00 25 102 40 70 150 25 24 60 28 32 62 12
EASTBOUND WESTBOUND
07:00 - 08:00 846 766
08:00 - 09:00 1204 918
09:00 - 10:00 1288 950
10:00 - 11:00 978 747
11:00 - 12:00 723 537
HOUR VOL HEF HOUR VOL HEF
00:00 – 01:00 300 51.19 12:00 – 13:00 915 16.78
01:00 – 02:00 524 29.31 13:00 – 14:00 869 17.67
02:00 – 03:00 750 20.47 14:00 – 15:00 746 20.58
03:00 – 04:00 809 18.98 15:00 – 16:00 601 25.55
04:00 – 05:00 889 17.27 16:00 – 17:00 487 31.53
05:00 – 06:00 821 18.70 17:00 – 18:00 444 34.59
06:00 – 07:00 813 18.89 18:00 – 19:00 297 51.70
07:00 – 08:00 909 16.89 19:00 – 20:00 185 83.01
08:00 – 09:00 1025 14.98 20:00 – 21:00 123 124.85
09:00 – 10:00 1029 14.92 21:00 – 22:00 111 138.34
10:00 – 11:00 1350 11.37 22:00 – 23:00 105 146.25
11:00 – 12:00 1099 13.97 23:00 – 24:00 155 99.07
(846 × 16.89) + (1204 × 14.98) + (1288 × 14.92) + (978 × 11.37) + (723 × 13.97)
𝐴𝐷𝑇 =
5
72,762
𝐴𝐷𝑇 = = 14,552 𝑣𝑒ℎ/𝑑𝑎𝑦
5
Adjust the 24-hour volume for Thursday to an average volume for the week
WESTBOUND
(766 × 16.89) + (918 × 14.98) + (950 × 14.92) + (747 × 11.37) + (537 × 13.97)
𝐴𝐷𝑇 =
5
56,859
𝐴𝐷𝑇 = = 11,372 𝑣𝑒ℎ/𝑑𝑎𝑦
5
Adjust the 24-hour volume for Thursday to an average volume for the week
218 485
635
934
292 214
509
Q2e
Before 𝑢
̅̅̅1 = 50.00 𝑘𝑝ℎ 𝑆1 = 8.60 𝑘𝑝ℎ 𝑛1 = 30
After 𝑢
̅̅̅2 = 45.00 𝑘𝑝ℎ 𝑆2 = 5.87 𝑘𝑝ℎ 𝑛2 = 30
𝑢
̅̅̅1 − 𝑢
̅̅̅2 = 50.00 − 45.00 = 5.00𝑘𝑝ℎ
Now……..
S>D
10 years after….
13,817
Required parking space = (10×0.85×0.90) = 1,806 𝑠𝑝.
500
450
400
350
Number of Vehicles
300
250
Arrival
200
Departure
150
100
50
0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90
Minutes