CHECK LIST FOR INSTALLATION OF EARTHING SYSTEM

Contractor : Form No
Rev No:
Sub-Contractor : Page: 1 o

SECTION OF WORK: LOCATION:

LEVEL:

Checked by Checked by
Stage Item

Check against approved electrical shop


drawings.

Pre-installation Check if the sleeve level and thickness of the


pipes are as per approved shop drawings.
Seal all sleeves as per specification.

Check if sizes of the earthing wires are as per


the approved shop drawing.
Check cable trays, trunking, and equipment
Equipotentially bonded as per project
specification.

Check if locations and sizes of earth bar are


as specification and approved shop drawings.

Check if that earthing wire(s) is connected to


Earthing System equipment as per shop drawing in proper
Installation way.

Check the level & location of earth pit as per


approved shop drawings.

Check if earth pit fixing is as specification


and approved shop drawings.

Check the connection(s) of earthing wire to


earthing rod electrode.

Check if earthing resistance reading is less


than 1 Ohm and submit earth resistance
Testing report.
Check Earth Continuity test for all metal
parts and equipment of building.

Sub. Cont. Date: Contractor Date: Consultant

Name: Sign: Name: Sign: Name:

Page 1 of 4
Page 2 of 4
LATION OF EARTHING SYSTEM
Form No:
Rev No:
Page: 1 of 1

Checked by
Date

Date:

Sign:

Page 3 of 4
Page 4 of 4

You might also like