Area 1: Pit No-2 Panel A Hazard Register As at 20 & 23 December 2021 Area Hazard Level Hazard Management Magnitude (M)
Area 1: Pit No-2 Panel A Hazard Register As at 20 & 23 December 2021 Area Hazard Level Hazard Management Magnitude (M)
Area 2
Area 2
2 LOW - MEDIUM Slope failure in weathered materials at pit 5,683 Trimming slope, monitor, assessment
crest
LEGEND :
AREA 3 HAZARD LEVEL LOW
AREA 5 HAZARD LEVEL LOW - MEDIUM
AREA 8 HAZARD MEDIUM
MUSTER POINT
Site Separi Tenggarong Seberang
EVACUATION ROUTE
Kutai Kartanegara, KALTIM MINE ENGINEERING DEPARTEMENT
Dipersipakan oleh : ME
Digambar oleh : KNTN Tanggal Terbit :
Diperiksa oleh : PR PETA BAHAYA GEOTEKNIK PIT N0-2 24-Dec-21
Disetujui : PANEL A BLOK D No. Gambar :
Mengetahui: GHM-03
LEGEND :
AREA 3 HAZARD LEVEL LOW
AREA 5 HAZARD LEVEL LOW - MEDIUM
MUSTER POINT
EVACUATION ROUTE
Dipersipakan oleh :
MINE ENGINEERING DEPARTEMENT
ttd Tanggal