You are on page 1of 2

PT GEMILANG BINA LINTAS TIRTA

SHIP MANAGEMENT
PRE ARRIVAL CHECKLIST (BRIDGE) (14.05.2009) D – 02

VESSEL: PORT :
BERTH : DATE :
1. Passage plan prepared to berth including following:

Relevant port information. Yes / No

Sailing directions consulted. Yes / No

Latest local weather reports available. Yes / No

Tides and currents calculated. Yes / No

Vessels draft calculated and draft restrictions accounted for. Yes / No

Largest scale charts available and corrected.


Yes / No
Local area navigation warning received
Yes / No
AIS switched off / set to low power after berthing
Yes / No

2. Steering gear and rudder indicators checked Yes / No


3. Engine control/telegraph tested and astern movement checked Yes / No
4. Communications internal and external tested Yes / No
5. Clock synchronized, course and telegraph recorders set Yes / No
6. Rev counters and all instrument illumination checked Yes / No
7. Signaling equipment, special lights/shapes available Yes / No
8. Pilot boarding arrangements made Yes / No
9. VTS/port control contacted and dangerous cargo reports made Yes / No
10. Anchor cleared Yes / No
11. Deck power available, mooring winches tested Yes / No
12. Pilot card (Bridge Procedures Guide Part A Annex 1) Yes / No
13. Speed Log pilot tube retracted. (if applicable) Yes / No / NA
14. Bow thruster checked (If applicable) Yes / No / NA

Page 1 of 2
PT GEMILANG BINA LINTAS TIRTA
SHIP MANAGEMENT
PRE ARRIVAL CHECKLIST (BRIDGE) (14.05.2009) D – 02
15. Crew informed of stand-by time Yes/No

Chief Engineer/Engine room informed of stand-by time Yes/No

16. Hand steering engaged in ample time Yes/No


MASTER : OOW :

This form to be completed within 12 hours prior to arrival at port.

An entry is to be made in the deck log book referring to this form.

Page 2 of 2

You might also like