You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

Cagayan de Oro City

OFFICE OF THE BUILDING OFFICIAL


.50

.10 .30 .10

.10
OBO
ENGR. JENITO ASEQUIA
BUILDING OFFICIAL

DATE APPROVED :

.60 .40

.10
.50

SECTION .05 .40 .05

.05

CATCH BASIN DETAIL


M
SCALE 1:25
.50 .40

PLAN
SPECIFICATIONS .05

ALL PLUMBING INSTALLATIONS SHALL BE IN ACCORDANCE


WITH THE NATIONAL BUILDING CODE AS WELL AS THE
LATEST NATIONAL PLUMBING CODE AND THE ORDINANCE OF
THE CITY EL SALVADOR AND IT SHALL BE UNDER THE
DIRECT SUPERVISION OF A DULY LICENSED MASTER
PLUMBER.

ALL MATERIALS TO BE USED UNDER THIS SECTION SHALL


CONFORM TO THE STANDARD SPECIFICATIONS OF THE
PHILIPPINE STANDARD COUNCIL, USED SCHEDULE 40 FOR ALL
PVC AND GALVANIZED IRON PIPE.

PVC, WASTE LINE PIPE SHALL BE INCLINED 2% OR


SUFFICIENTLY ENOUGH TO ALOOW SMOOTH PASSAGE FOR
SOLID WASTE AND PREVENT CONGLOMERATION INSIDE THE

ALL JOINTS BETWEEN PVC PIPES SHALL BE MADE OF PVC


SOLVENT OR EPOXY GLUE.
PREPARED BY: APPROVED BY: SEAL APPROVED BY: SHEET NO.
PRC NO.
PROPOSED TWO STOREY RESIDENTIAL BUILDING
PROJECT:

P-2
PTR NO.

DATE: ZONE 4 DON MARIANO VILLAGE BRGY. KAUSWAGAN CDOC


EMAIL: zjass@gmail.com
LOCATION:
PLACE:

TIN NO. OWNER: MRS. HERMILA B. JOAQUINO OWNER'S SIGNATURE


11 15

You might also like