General Notes: Beginning of Project (End of Diaphragm) End of Project (End of Diaphragm)
General Notes: Beginning of Project (End of Diaphragm) End of Project (End of Diaphragm)
DESIGN CRITERIA:
BEGINNING OF PROJECT END OF PROJECT 1. SPECIFICATIONS: 1992 AASHTO SPECIFICATIONS FOR HIGHWAY BRIDGES, 15TH EDITION AS AMENDED BY
( END OF DIAPHRAGM ) ( END OF DIAPHRAGM ) 1991 INTERIM SPECIFICATIONS.
TOP OF FINISHED ROADWAY, EL. = 100.00 m.
2. LOADINGS:
LIVE LOAD = MS18 (H20-44)
DEAD LOAD (CONCRETE) = 23.56 KN/m3
1.05 KPa OF ROADWAY INCLUDED FOR FUTURE WEARING SURFACE.
SEISMIC LOAD - SHALL BE IN ACCORDANCE WITH THE 1991 AASHTO (INTERIM) SPECIFICATIONS FOR
SEISMIC DESIGN OF HIGHWAY BRIDGES. SEISMIC LOAD SHALL NOT BE LESS THAN 10% (DL + 0.50LL).
3. DESIGN STRESSES:
CONCRETE: fc' = 28.0 MPa, FOR SUBSTRUCTURE, fc' = 40.0 MPa, FOR DECK SLAB, REINFORCING STEEL:
GRADE 60, MINIMUM YIELD STRENGTH fy = 415.0 MPa.
CONSTRUCTION :
1. SPECIFICATIONS: 1995 DPWH STANDARD SPECIFICATIONS VOL. 11, HIGHWAYS, BRIDGES AND AIRPORTS.
TO MANILA TO NAGA CITY 2. CONCRETE: ALL CAST-IN-PLACE CONCRETE SHALL BE CLASS "A". UNLESS OTHERWISE SHOWN, ALL
EXPOSED EDGES SHALL BE SHAMFERRED 25mm. EXCEPT RE-ENTRANT ANGLES WHICH SHALL BE
SHAMFERRED AND FILLETED 13mm RESPECTIVELY.
3. DIMENSIONS: ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED, ALL ELEVATIONS ARE IN
TOP OF COPING METERS, STATIONINGS IN KILOMETERS + METERS TAKEN ALONG CENTERLINE OF ROADWAY.
ELEV. 98.312m. 4. REINFORCING STEEL: UNLESS OTHERWISE SHOWN, ALL BARS SPACINGS REFER TO THE CENTER OF BARS
AND THE MINIMUM COVERING MEASURED FROM THE SURFACE OF THE CONCRETE TO THE FACE OF THE
EXISTING PIER NEAREST BAR SHALL BE 50mm.
TO BE REMOVED 5. WATER ELEVATION: WATER ELEVATION SHOWN ON THE PLANS ARE APPROXIMATE ONLY AND ANY
VARIATIONS FOUND DURING CONSTRUCTION SHALL NOT BE CONSIDERED AS BASIS FOR EXTRA
TOP OF FOOTING TOP OF FOOTING
COMPENSATION.
EL. 95.812 m. EL. 95.812 m.
6. REINFORCED CONCRETE PILING: ALL PILES SHALL BE 400 X 400mm PRECAST REINFORCED CONCRETE
FRESH WATER TYPE "B". ESTIMATED LENGTH PER PILE SHALL BE 14.00M. EACH PILE SHALL BE DRIVEN TO A
BOTTOM OF FOOTING BOTTOM OF FOOTING REQUIRED MINIMUM BEARING CAPACITY OF . AND SHALL BE DRIVEN TO FULL AUTHORIZED
EL. 94.412 m. TO BE TRIMMED EL. 94.412 m. PAYLENGTH IN ACCORDANCE WITH ITEM 400-3.2 (PILE DRIVING) OF THE GOVERNMENT STANDARD
0.40m. x 0.40m. 0.40m. x 0.40m.
SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS VOL. 11. CUT-OFF SHALL BE AUTHORIZED ONLY
R.C. PILE R.C. PILE
UPON APPROVAL OF THE CHIEF CIVIL ENGINEER. ALL PILES SHALL BE PROVIDED WITH METAL SHOE FOR
HARD DRIVING.
7. R.C. TEST PILES: TWO (2) 400 X 400MM PRECAST REINFORCED CONCRETE TEST PILES WITH A C ASTING
GENERAL ELEVATION LENGTH OF 16.00M. SHALL BE DRIVEN ONE AT ABUTMENT A AND THE OTHER AT ABUTMENT B AT LOCATION
LOCATION TO BE DESIGNATED BY THE ENGINEER AND SHALL FORM PART OF THE PILE FOUNDATION. THE
SCALE 1:100M TEST PILE SHALL BE DRIVEN TO A REQUIRED MINIMUM BEARING CAPACITY OF 400KN. THE TEST PILE SHALL
BE PROVIDED WITH METAL SHOE FOR HARD DRIVING.
8. PRIOR TO THE DRIVING OF THE VERIFICATION PILE/ FIRST REGULAR PILE OF THE ABUTMENT/PIERS, THE
CHIEF, PLANNING AND DESIGN SECTION OR ITS AUTHORIZED REPRESENTATIVE SHOULD BE NOTIFIED TO
WITNESS THE PILE DRIVING FOR EVALUATION / ANALYSIS IN CONJUNCTION WITH THE AVAILABLE SUBSOIL
INFORMATION.
9. APPROACHES: THE FILL / EMBANKMENT AT THE JUNCTION OF THE ABUTMENT, WINGWALL AND ROAD
A B
SHALL BE COMPACTED THOROUGHLY IN ACCORDANCE WITH ITEM 104, EMBANKMENT, SECTION 104 - 3.2,
METHODS OF CONSTRUCTION OF THE STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND
AIRPORTS, " IN EMBANKMENT AROUND STRUCTURES, THE EMBANKMENT SHALL BE BROUGHT UP IN EQUAL
LAYERS ON ALL SIDES OF THE BULKHEAD, COLUMNS OR WALLS TO PREVENT DISTORTIONS TO ANY OF
THESE PARTS. AREAS INACCESSIBLE TO TAMPING OR POWER ROLLER SHALL BE HAND TAMPED UNTIL
THOROUGHLY COMPACTED." BORROW ESTIMATED TO COVER SUFFICIENT LENGTH OF APPROACHES TO
MAKE BRIDGE PASSABLE. GRADE LINES AT APPROACHES TO BE DETERMINED BY THE ENGINEER BUT NOT
TO EXCEED 7%.
1 1
10. REVISIONS: ALL REVISIONS OF THE APPROVED PLANS SHALL BE COORDINATED WITH THE UNDERSIGNED
PRIOR TO THE EXECUTION FOR PROPER REVIEW / EVALUATION IN CONJUNCTION WITH THE AVAILABLE
2 2 STRUCTURAL DATA / INFORMATIONS USED IN THE STRUCTURAL ANALYSIS AND DESIGN.
3 3
4 4
5 5
6 6
7 7
300MM BOULDER
SP.GR.=2.5
8 8
TO MANILA SYMM. ABOUT THIS TO NAGA
LINE
SHAFT/ABUTMENT
9 9
BEGINNING OF PROJECT END OF PROJECT
( END OF DIAPHRAGM ) 10 10 ( END OF DIAPHRAGM ) 75MM WEEPHOLES
STAGGERED @2000MM O.C.
11 11
GRAVEL BAGGED IN
POLYESTER NON-WOVEN
12 12 300mm THICK FILTER CLOTH AT EACH
GROUTED RIPRAP WEEP HOLE
13 13
14 14
DRAIN
15 15
16 16 END OF WINGWALL
DRAIN DETAIL
SCALE 1:20M
GENERAL PLANS
SCALE 1:100M
PROJECT TITLE:
LOCATION: LIBMANAN, CAMARINES SUR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
DRAFTSMAN
REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES FOR SUPERSTRUCTURE OF 25m SPAN
R E I N F O R CEMENT
BENDING STRUCTURE GIRDER CONCRETE MARK SIZE QTY SPACING SHAPE
DIAGRAM COMPONENT TYPE VOLUME BAR DIMENSIONS LENGTH TOTAL UNIT TOTAL REMARKS
LOCATION PER BAR LENGTH WEIGHT WEIGHT
a b c d Lc
PROJECT TITLE:
LOCATION: LIBMANAN, CAMARINES SUR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
DRAFTSMAN
A B
1 FRAMING PLAN
A B
PROJECT TITLE:
LOCATION: LIBMANAN, CAMARINES SUR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
DRAFTSMAN
3000 6250
1000
STR
2250
11
CL
4603
STR
3
3
2500
10
10 11
750
750
750
750
3000 750 5448
STR
8
4095
2
STR 125 750 1900
G B C
5 6 B B B
A
C
2 7 BAR A G A G
STR
750
E C B D
STR
BENDING D
DIAGRAM
625
A E
5 D
1 1 2 3 4 5
2250
2 100
25
B B C
15 SPACES @ 150 = 5500
C A B A
D B
508
9 C B
600
D C C B C
533
4 E
2500
G
1 6 7 8 9 10 11
4603
1875 3750 1875 11
2
3
2 ESTIMATE OF QUANTITY / ABUTMENT
250
1
CL
STR
ITEM NO. DESCRIPTION UNIT QUANTITY
2500
3500
STR
LOCATION: LIBMANAN, CAMARINES SUR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
DRAFTSMAN
1900 CL 8 - 12mm 7
750
125
14020 CLEAR ROADWAY
100 9 - 12mm 3
7010 HALF CLEAR ROADWAY 3660 3350
250
50
1 - 12mm STR
4
R=
1000
12 - 12mm STR
26 - 12mm 8
5447
35mm x 300mm x 661mm
2200
ELASTOMERIC BEARING PAD
1700
HARDNESS 60 32 - 16mm 2
2 - 12mm 5
2 - 12mm 6
750
3 - 20mm 2
3000
9 - 20mm 2
125
51 - 36mm 4
3363 5625
PLAN
SCALE 1:4O mts.
40
12 - 12mm STR
26 - 12mm 8
2250
532
532
4603
3 - 20mm 2
750
9 - 20mm 2
125
10 - 25mm 1
TOP OF COPING 2
ELEV. 99.50M.
2
3505
STR
BOTTOM OF FOOTING PILING
ELEV. 95.60M. REINFORCEMENT
1
1
400mm x 400mm
R.C. PILES
PROJECT TITLE:
LOCATION: LIBMANAN, CAMARINES SUR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
DRAFTSMAN
2b
1h 1g
1c
1a PLAN
1e 2c
1f
2a PLAN
1e SECTION
1c SIDEWALK DETAIL
1d
2c SECTION
1g PARAFFIN JOINT 1h DEFLECTION JOINT
2
2 SECTION 2 TYPICAL CROSS SECTION
1f SECTION
1 TYPICAL RAILING AND SIDEWALK DETAILS
PROJECT TITLE:
LOCATION: LIBMANAN, CAMARINES SUR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
DRAFTSMAN
3
3 SECTION
B
1
2 SECTION
PROJECT TITLE:
LOCATION: LIBMANAN, CAMARINES SUR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
DRAFTSMAN
3
SECTION
ELEVATION
ELEVATION
1 PILE ELEVATION
3 SECTION
PILE SCHEDULE
LONGITUDINAL REINF.
TYPE SIZE
(mm)
QTY. BAR SIZE
WELDED SPIRAL-
4 PILE TIP FOR HARD DRIVING 5 TIE SPLICE DETAIL
PROJECT TITLE:
LOCATION: LIBMANAN, CAMARINES SUR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
DRAFTSMAN