FPRB Installation Manual For SPD Rev Ac
FPRB Installation Manual For SPD Rev Ac
Published in China
This document, and the information it contains, are the property of Artesyn Embedded
Technologies Co., Ltd, and are protected by law. Both must be held in strictest confidence at all
times. Artesyn Embedded Technologies grants no license or right to copy, use or disclose either,
expressly or by implication.
Disclaimer
This document and the information contained herein are provided on an "AS IS" basis. Artesyn
Embedded Technologies may make improvements or changes in this documentation, at any
time and without notice and as it sees fit. The information in this documentation was prepared
by Artesyn Embedded Technologies with reasonable care and is believed to be accurate.
However, Artesyn Embedded Technologies shall not assume responsibility for losses or damages
resulting from any omissions, inaccuracies, or errors contained herein.
History
Date
Version Author Change Note
DD-MM-YYY
Table of Contents
History ...................................................................................................................3
Table of Contents ....................................................................................................4
List of Figures..........................................................................................................5
List of Tables ...........................................................................................................5
Preface...................................................................................................................9
Application of this manual ..................................................................................10
Chapter 1 Product Introduction.............................................................................11
1.1 General Description .................................................................................11
1.2 Main Specification of the SPD....................................................................11
1.3 Properties ...............................................................................................16
Chapter 2 Preparation ..........................................................................................18
2.1 Installation tools ......................................................................................18
2.2 Delivery contents .....................................................................................18
Chapter 3 SPD Installation ....................................................................................20
3.1 Make AC connection with the SPD .............................................................20
3.1.1 Preparation ................................................................................................... 21
3.1.2 Configure the Terminal Block ...................................................................... 27
3.1.3 3-phase star (3Y) AC connection with the SPD ........................................... 29
3.1.4 Single-phase (1Φ) AC connection with the SPD.......................................... 35
3.1.5 2-phase AC connection with the SPD ........................................................ 38
3.1.6 3-phase delta (3Δ) AC connection with the SPD ......................................... 40
3.2 Replace the SPD.......................................................................................44
List of Figures
List of Tables
List of Terms
A Ampere
AC Alternative current
AWG American Wire Gauge
BAT Battery
BR Battery Return
BTS Base Transceiver Station
CB Circuit Breaker
CSA Cross Section Area
CU Control unit
DC Direct current
EMC Electromagnetic Compatibility
ESD Electrostatic Discharge
FPRB Flexi Power Rectifier
GND Ground
GUI Graphical User Interface
IE Internet Explorer
IP Internet Protocol
Preface
About this manual
This manual provides all the necessary information to operate, install and maintain the
Surge Protective Device (SPD) used in the Flexi Power Rectifier (FPRB).
Table 1 lists the contents of this manual:
3 SPD installation Describes how to install and replace the SPD into the
FPRB
Symbol Description
Reference documents
12 14 VAL-MS 230IT/3+1-FM
FM
11
The SPD (module name ‘VAL-MS 230IT/3+1-FM’) consists of three equivalent OVP
modules used between live cables and neutral cable from the AC mains (module name
‘VAL-MS 230 IT ST’), one OVP module used between the neutral cable from the AC
mains and the earth (module name ‘F-MS 12 ST’) and one remote signaling contact
(module name ‘VAL-MS 230IT…-FM’) (see Figure 1).
The four OVP modules and the remote signaling contact are all installed on the SPD base
and can be removed from the base. This structure leads to easier configuration and
replacement of the OVP modules (see
Figure 2).
F-MS12 ST
VAL-MS
230 IT ST
Base
VAL-MS
230IT…-FM Terminal
Figure 3 and Figure 4 show the dimension of the SPD. The four OVP modules are of the
same dimensions.
17.5m 17.5m
70m
VAL-MS 230IT/3+1-FM
ZGG40-385(3+1)
Figure 3 – Dimension of the SPD – top view
VAL-MS 230IT/3+1-FM
ZGG40-385(3+1)
Note:
1
Although the SPD remote signaling contact has three pins, only two are applied when
configured in the FPRB. Refer to Figure 13
1.3 Properties
Typical use
Figure 5 shows the configuration of the SPD in a TN-S system.
Note:
It is recommended to use the SPD with a mains utility offering the appropriate line
fuse protection.
Failure Detection
If any OVP module has been damaged, Artesyn will provide the user with the individual OVP
module but not the whole SPD for replacement.
In the event that any one of the four OVP modules is damaged, the PDA will send alarm
signal via the LCD.
After opening the rear top cover of the PDA (refer to section 3.4 of the ‘Flexi Power
Rectifier – Installation Manual’, Artesyn File No. 970-009475-0000), the user can confirm
which OVP module is in failure.
Failure Indication
If the window is transparent, the OVP is OK; if the window is red, the OVP is damaged
and should be replaced in time (see Figure 6).
Window
Chapter 2 Preparation
2.1 Installation tools
Tool kit:
Allen key (hex key): 8 mm (0.31 in.)
Allen key (hex key): 4 mm
Awl: diameter of 2mm
ESD wrist strap and cable
TORX screwdriver set: T10, T20, T25
Flat screwdriver
Cross screwdriver
Wrench 13 mm (0.51 in.)
Folding knife
Adjustable (monkey) wrench
Side cutters
Lint-free swab or wipe and 99% alcohol for cleaning optical connectors
Cable ties for routing cables
Tape measure
Flashlight, pocket lamp or torch
Hammer drill
Marker pen or comparable tool
Pliers
Wire-stripper
Test equipment:
Multi-meter
The AC power supply must be switched off prior to accessing the AC cable.
This manual concentrates on the AC connection with the SPD, and omits the steps prior
to the SPD installation, i.e. the AC terminal block configuration, etc. The user should
refer to ‘Flexi Power Rectifier – Installation Manual’ (Artesyn File No. 970-009475-0000)
for the relevant previous steps.
The colors of the AC mains wire used in this manual are for illustration purpose only.
However, the user should verify the AC mains referring to the color-coding in the
respective field or country of application.
3.1.1 Preparation
3.1.1.1 Detach the PDA rear top cover referring to ‘Flexi Power Rectifier – Installation
Manual’ (Artesyn File No. 970-009475-0000).
3.1.1.2 Loosen screws A, B and C as per attached photo with a TORX screwdriver (T20) AC
SPD terminal
DIN Rail block
SPD ground B
clamp
AC ground A
clamp
PDA earth
cable
Strain-
relief
C SPD sensor
F connection
Figure 7 – PDA rear internal chassis layout
3.1.1.3 Preparing the AC mains cable. The color of the wires may vary depending on the
country where the SPD will be mounted.
(Tolerance: 3mm)
AC type L1 L2 L3 N PE
(1Φ) B (mm) 20 20 20
B (mm) 20 20 N/A
(3Y) B (mm) 20 20 20 20 20
AC type Terminals connection Short link available (1) AC terminal block SPD configuration
Configuration (2)
(3)
AC SPD AC terminal Chassis
mains block
N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and Short terminals L1,
4,5,6 respectively L2, L3
L L2 5 N/A L2 for three-phase
2-Phase N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and Short terminals L1,
4,5,6 respectively L2, L3
Note:
(1) The short link names listed herein are in accordance with the actual labels on the short links.
(2) The AC terminal block should be configured before the AC connection. User shall refer to section 3.4 in
Flexi Power Rectifier – Installation Manual (Artesyn file No.970-009475-0000) for more details
L1 L2 L3 N
3Y
PE L1 L2 L3 N
AC Mains
1Φ
PE L N
AC mains
L1 L2 L3 N
3∆
PE L1 L2 L3
AC mains
2-phase
Verify the AC power system types in field, and make sure the corresponding bridge
configuration is used.
The AC terminal block has been already configured for 3-phase star AC mains before
the shipment. Therefore the user has to change the AC terminal block configuration
if required referring to the actual AC type in field.
Insert the bridges and screws (provided as accessories) to the corresponding slots on
top of the AC terminal block referring to the AC CABLE CONNECTION CHART located
on the chassis (and reproduced in Figure 8).
Secure the screws with a flat screwdriver, tightening to 0.8Nm.
There are three AC power system types (see above Figure), and thus three AC
configurations of the AC terminal block.
AC Terminal Block
SPD 1 2 3 4 5 6
L1 L2 L3 N
PE L1 L2 L3 N
AC Mains
Figure 12 – Schematic diagram of AC connection with the SPD – 3Y
The terminal marks in Figure 12 are in accordance with the actual SPD and AC
terminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 12 and Table
7 referring to labels on the short links.
The terminals 1, 2, 3 on the AC terminal block should be shorted before the
connection. Refer to section 3.4 in Flexi Power Rectifier – Installation Manual
(Artesyn file No.970-009475-0000) for details.
3.1.3.1 Detach the cable strain-relief from the chassis by loosening the screw ‘C’ in
Figure 7 with a TORX screwdriver (T20). Insert the AC mains cable on the
strain relief.
3.1.3.2 Detach the AC ground clamp and SPD ground clamp from the chassis by
loosening the screws ‘A’ and B ‘with a TORX screwdriver (T20).
3.1.3.3 Prepare the AC mains of 3-phase star as per Table 6.
3.1.3.4 Assemble the Link cables, the AC mains cable, the SPD sensor cable and the
SPD grounding cable into the SPD. Refer to Figure 13
L1 for
three-
phase
L2 for
three- SPD
phase sense
cable
L3 for
three-
phase
N for
three-
phase
star SPD
ground
cable
Insert the connector of the SPD sense cable into the left two contacts; otherwise it will
block the SPD from installing onto the chassis.
.
Figure 14 - AC Ground wire
3.1.3.6 Secure the SPD into the SPD DIN rail. Connect the SPD sense cable to the
stand by mating connector. Connect the SPD grounding cable into the
terminal lug. Refer to Figure 15.
SPD
Grounding
cable
SPD
SPD
sense
cable
3.1.3.7 Connect the AC link cables from SPD to the Terminal Block. Assemble the
SPD grounding cable and the AC grounding cable into the PDA
SPD
grounding N link
cable lug cable
L3 link
cable
L2 link
cable
AC L1 link
grounding cable
cable lug
1. Use the appropriate L and N short link referring to the label on the short links
and the indications in Figure 12 and Table 7.
2. Rotate the N link cable 90 degrees either clockwise or counter clockwise when
assembling the SPD on the FPRA due to the smaller slot of the terminal block.
Refer to Figure 17 - Special Instruction for N Link Cable Installation
It is recommended to clamp the AC wire and the corresponding short link with one
overlapping on another.
Below figure shows the PDA rear layout after completing the 3-phase star AC
connection with the SPD.
SPD ground
cable
N
N short link
L3
L1 short link
L2
L2 short link
L1 L3 short link
PE of AC
mains SPD sense cable
Figure 18 – AC connection with the SPD - 3Y
3.1.3.8 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to ‘Flexi Power Rectifier – Installation Manual’ (Artesyn File
No. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
It’s strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
L3 for three-phase
AC ground
clamp PE L N L2 for three-phase
AC mains L1 for three-phase
The terminal marks in Figure 19 are in accordance with the actual SPD and AC
terminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 19 and Table
7 referring to labels on the short links.
The terminals 1,2,3 and 4,5,6 on the AC terminal block should be shorted
respectively before the connection. Refer to section 3.4 in Flexi Power Rectifier –
Installation Manual (Artesyn file No.970-009475-0000) for details.
3.1.4.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables.
3.1.4.2 As indicated in Figure 19 and Table 7, the SPD terminals L1, L2 and L3 have to be
paralleled by the SPD jumper (see Figure 20).
The user should loosen the three terminal clamps of L1, L2 and L3, and hold the SPD
upside down. Thus the SPD jumper can be easily inserted into the parallel clamps.
The jumper should be fixed in the SPD together with the live cables of the AC mains
and L line short links.
SPD jumper
3.1.4.3 Connect the live cable from the AC mains and L2 short link into terminal ‘L2’ on
the SPD referring to Figure 19 and Table 7, tightening the top screw to 4.5Nm
with a cross screwdriver (see Figure 21).
N for single
SPD phase
ground
link
L3 for
three-
SPD ground phase
clamp
L2 for
three-
phase
AC ground
clamp
L1 for
three-
phase
3.1.4.4 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to section 3.4 in ‘Flexi Power Rectifier – Installation Manual’
(Artesyn File No. 970-009475-0000).
SPD ground
clamp
L3 for three-phase
AC ground
clamp L2 for three-phase
L1 for three-phase
3.1.5.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables
3.1.5.2 As indicated in Figure 19 and Table 7, the SPD terminals L1, L2 and L3 have to be
paralleled by the SPD jumper (see Figure 20).
3.1.5.3 Connect the AC link cables and the AC cables to the SPD and to terminal block.
Refer to Figure 23)
N for single
SPD phase
ground
link
L3 for
three-
SPD ground phase
clamp
L2 for
three-
phase
AC ground
clamp
L1 for
three-
phase
3.1.5.4 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to section 3.4 in ‘Flexi Power Rectifier – Installation Manual’
(Artesyn File No. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
It’s strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
The terminal marks in Figure 22 are in accordance with the actual SPD and AC
terminal block.
Refer to Single-phase (1Φ) AC connection for details.
AC Terminal Block
SPD 1 2 3 4 5 6
L1 L2 L3 N
L3 for three-phase
L2 for three-phase
AC ground
clamp L1 for three-phase
PE L1 L2 L3 SPD ground
AC mains clamp
The terminal marks in Figure 24 are in accordance with the actual SPD and AC
terminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 24 and Table
7 referring to labels on the short links.
The terminals 1,2 and 3,4 and 5,6 on the AC terminal block should be shorted
respectively before the connection. Refer to section 3.4 in Flexi Power Rectifier –
Installation Manual (Artesyn file No.970-009475-0000) for details.
3.1.6.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables
3.1.6.2 Configure the terminal block as per Figure 10
3.1.6.3 Assemble the AC cables, AC link cables into the SPD.
3.1.6.4 Assemble the AC link cables into the Terminal Block.
SPD
grounding
cable
connected to
N terminal of
the SPD.
N connected
to Ground
3.1.6.5 Connect the L1, L2 and L3 short links to terminals ‘5’, ‘3’, ‘1’ on the AC terminal
block respectively referring to Figure 24 and Table 7,, tightening the top screws
to 1.5Nm with a Cross screwdriver (see Figure 26).
SPD
Sense
Cable
L3
short
link
SPD
ground
link
L2
short
link
L1
short
link
Figure 26 – Connecting the AC terminal block – 3Δ
3.1.6.6 Figure 27 shows the PDA rear internal layout after completing the 3-phase delta
AC connection with the SPD.
SPD
ground
link
L3 for
three-
SPD ground phase
clamp
L2 for
three-
phase
AC ground
clamp
L1 for
three-
phase
3.1.6.7 After finishing and checking the AC cable installation, replace the PDA rear cover
referring to section 3.4 in ‘Flexi Power Rectifier – Installation Manual’ (Artesyn
File No. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
It’s strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
The AC power supply must be switched off prior to accessing the SPD.
Ask Artesyn Embedded Technologies service people for help if any OVP module has
been damaged. Artesyn will provide the user with the individual OVP module but
not the whole SPD for replacement.
The user shall only replace the damaged OVP module of the SPD without removing
the whole SPD from the PDA chassis.
The user can verify which OVP module has been damaged Referring to section
Properties.
3.2.1 Hold the two sides of the damaged OVP module and pull
pull it out from the SPD
base (see Figure 28)
3.2.2 The SPD base is designed such that the two kinds of OVP modules cannot be
mixed when installing onto it (see Figure 29).
3.2.3 Fit the new module into its position on the SPD base (see Figure 30).