Flexi Power Rectifier FPRB

Installation Manual for


Surge Protective Device

Flexi Power Rectifier


FPRB

Manufactured by: Artesyn Embedded Technologies


Manufacturing PN: AA27540L
Visit us @ http://www.artesyn.com/

Installation Manual for SPD, Rev AC Page 1 of 45


Flexi Power Rectifier FPRB

Manual Number: 970-009473-0000


Manual Issue: AC
Manual Status: Standard
Release Date: Jun 30, 2014

Copyright © 2014 Artesyn Embedded Technologies


CONSIDER IT SOLVED

Published in China

This document, and the information it contains, are the property of Artesyn Embedded
Technologies Co., Ltd, and are protected by law. Both must be held in strictest confidence at all
times. Artesyn Embedded Technologies grants no license or right to copy, use or disclose either,
expressly or by implication.

Disclaimer

This document and the information contained herein are provided on an "AS IS" basis. Artesyn
Embedded Technologies may make improvements or changes in this documentation, at any
time and without notice and as it sees fit. The information in this documentation was prepared
by Artesyn Embedded Technologies with reasonable care and is believed to be accurate.
However, Artesyn Embedded Technologies shall not assume responsibility for losses or damages
resulting from any omissions, inaccuracies, or errors contained herein.

Installation Manual for SPD, Rev AC Page 2 of 45


Flexi Power Rectifier FPRB

History

Date
Version Author Change Note
DD-MM-YYY

30-06-2013 AA Ferdinand Sisracon First release for FPRB

Release to be used as a common


SPD Instruction Manual for both
FPRA and FPRB

30-10-2013 AB Ferdinand Sisracon Added special instruction to


connect the N link cable for both
FPRA and FPRB

30-06-2014 AC Alex Ding Change the brand from Emerson


Network Power to Artesyn
Embedded Technologies

Installation Manual for SPD, Rev AC Page 3 of 45


Flexi Power Rectifier FPRB

Table of Contents

History ...................................................................................................................3
Table of Contents ....................................................................................................4
List of Figures..........................................................................................................5
List of Tables ...........................................................................................................5
Preface...................................................................................................................9
Application of this manual ..................................................................................10
Chapter 1 Product Introduction.............................................................................11
1.1 General Description .................................................................................11
1.2 Main Specification of the SPD....................................................................11
1.3 Properties ...............................................................................................16
Chapter 2 Preparation ..........................................................................................18
2.1 Installation tools ......................................................................................18
2.2 Delivery contents .....................................................................................18
Chapter 3 SPD Installation ....................................................................................20
3.1 Make AC connection with the SPD .............................................................20
3.1.1 Preparation ................................................................................................... 21
3.1.2 Configure the Terminal Block ...................................................................... 27
3.1.3 3-phase star (3Y) AC connection with the SPD ........................................... 29
3.1.4 Single-phase (1Φ) AC connection with the SPD.......................................... 35
3.1.5 2-phase AC connection with the SPD ........................................................ 38
3.1.6 3-phase delta (3Δ) AC connection with the SPD ......................................... 40
3.2 Replace the SPD.......................................................................................44

Installation Manual for SPD, Rev AC Page 4 of 45


Flexi Power Rectifier FPRB

List of Figures

Figure 1 – Internal circuit diagram of the SPD .................................................................. 11


Figure 2 – Structure of the SPD......................................................................................... 12
Figure 3 – Dimension of the SPD – top view..................................................................... 13
Figure 4 – Dimension of the SPD – side view.................................................................... 14
Figure 5 – SPD configuration in a TN-S system ................................................................. 16
Figure 6 – Checking failure of the SPD.............................................................................. 17
Figure 7 – PDA rear internal chassis layout ...................................................................... 21
Figure 8 – The AC cable connection chart ........................................................................ 27
Figure 9 – AC terminal block configuration – 1Φ and 2Φ Configuration ......................... 28
Figure 10 – AC terminal block configuration – 3Δ ............................................................ 28
Figure 11 – AC terminal block configuration – 3Y ............................................................ 29
Figure 12 – Schematic diagram of AC connection with the SPD – 3Y............................... 29
Figure 13 - Assemble the Link Cables to SPD .................................................................... 30
Figure 14 - AC Ground wire............................................................................................... 31
Figure 15 - Secure the SPD into the DIN rail ..................................................................... 31
Figure 16 - Connect the Link cables to Terminal Block ..................................................... 32
Figure 17 - Special Instruction for N Link Cable Installation ............................................. 33
Figure 18 – AC connection with the SPD - 3Y ................................................................... 34
Figure 19 – Schematic diagram of AC connection with the SPD – 1Φ.............................. 35
Figure 20 – SPD configuration for single-phase AC connection ....................................... 36
Figure 21 - Connection of AC link cables from SPD to Terminal Block ............................. 37
Figure 22– Schematic diagram of AC connection with the SPD – 2- Phase...................... 38
Figure 23 - AC connection with the SPD – 2- Phase.......................................................... 39
Figure 24 – Schematic diagram of AC connection with the SPD – 3Δ .............................. 40
Figure 25 - Connection of AC link cables and SPD ground cables..................................... 41
Figure 26 – Connecting the AC terminal block – 3Δ ......................................................... 42
Figure 27 3-phase delta (3Δ) AC connection with the SPD.............................................. 43
Figure 28 – Removing the damaged OVP module from the SPD ..................................... 44
Figure 29 – The OVP module and the SPD base ............................................................... 45
Figure 30 – Fitting a new OVP module to the SPD ........................................................... 45

List of Tables

Table 1 – Contents of this manual ...........................................................................................9


Table 2 – Symbols in this manual ............................................................................................9
Table 3 – Reference documents of the SPD .........................................................................10
Table 4 – Main specification of the SPD ...............................................................................15
Table 5 – Delivery contents of the SPD .................................................................................19
Table 6 – Recommended preparation for AC mains cable ..................................................22
Table 7 – AC connection with the SPD ..................................................................................23

Installation Manual for SPD, Rev AC Page 5 of 45


Flexi Power Rectifier FPRB

Table 8 – Schematic diagram of AC connection with the SPD ............................................25

List of Terms
A Ampere
AC Alternative current
AWG American Wire Gauge
BAT Battery
BR Battery Return
BTS Base Transceiver Station
CB Circuit Breaker
CSA Cross Section Area
CU Control unit
DC Direct current
EMC Electromagnetic Compatibility
ESD Electrostatic Discharge
FPRB Flexi Power Rectifier
GND Ground
GUI Graphical User Interface
IE Internet Explorer
IP Internet Protocol

L Live cable from the AC mains

LAN Local Area Network


LED Light Emitting Diode
LVD Low Voltage Disconnect
MAC Media Access Control
MCB Miniature Circuit Breaker
N Neutral cable from the AC mains
PC Personal Computer
PCB Printed Circuit Board
PDA Power Distribution Assembly
PE Protective earth
PSU Power Supply Unit

Installation Manual for SPD, Rev AC Page 6 of 45


Flexi Power Rectifier FPRB

SPD Surge Protective Device


V Volt
VPN Virtual Private Network
1Φ Single-phase AC type
3Y 3-phase star AC type
3Δ 3-phase delta AC type

Installation Manual for SPD, Rev AC Page 7 of 45


Flexi Power Rectifier FPRB

This page left intentionally blank

Installation Manual for SPD, Rev AC Page 8 of 45


Flexi Power Rectifier FPRB

Preface
About this manual
This manual provides all the necessary information to operate, install and maintain the
Surge Protective Device (SPD) used in the Flexi Power Rectifier (FPRB).
Table 1 lists the contents of this manual:

Table 1 – Contents of this manual

Chapter Title Content

1 Product instruction Describes the specifications and properties of the


SPD

2 Preparation Describes the SPD installation preparations

3 SPD installation Describes how to install and replace the SPD into the
FPRB

Terms and Symbols in this manual


These term and symbols in Table 2 might appear in the manual:

Table 2 – Symbols in this manual

Symbol Description

Warning statement identifies conditions or practices that could


result in bodily injury or loss of life.
It warns the reader to be extremely careful.
Caution statement identifies conditions or practices that could
result in damage to this product or devices connect to it.
It indicates that the reader must be careful.

Provides hints to the user for easier installation

The necessary supplementary of the article to let user be clearer.

Installation Manual for SPD, Rev AC Page 9 of 45


Flexi Power Rectifier FPRB

Reference documents

Table 3 contains the reference documents of the SPD:

Table 3 – Reference documents of the SPD

Artesyn Embedded Technologies


Document
File No.

Product Specification – FPRB 970-009025-0000

FPRB Installation Manual for SPD (This manual) 970-009473-0000

FPRB User Manual 970-009474-0000

FPRB Installation Manual 970-009475-0000

FPRB Quick Start Guide for SPD 970-009476-0000

FPRB Quick Start Guide 970-009477-0000

Application of this manual


This manual is regarded as a substitution of the part ‘Make AC connection without the SPD’
(refer to section 3.4 of the ‘Flexi Power Rectifier - Installation Manual’, Artesyn File No. 970-
009475-0000).
This manual is based on the present SPD in use. Artesyn may change the SPD to a second
source in future. However Artesyn ensures the compatibility of the new SPD in the FPRB.
This manual supports all applications of the SPD that can be used in the FPRB.

Installation Manual for SPD, Rev AC Page 10 of 45


Flexi Power Rectifier FPRB

Chapter 1 Product Introduction

1.1 General Description


The Flexi Power Rectifier (FPRX, Artesyn part number AA25020L/ CS7000013.XX for 6kW
and AA27540L/ CS7000030.XX for 9kW) is a 6kW or 9kW output power AC rectifier package
respectively. The Surge Protective Device (SPD, Artesyn part number AA25130L/
CS7000002.XX) is used to prevent damage to the FPRX caused by high input voltages or
surge.
The SPD consists of three equivalent OVP modules used between live cables and neutral
cable from the AC mains; one OVP module used between the neutral cable from the AC
mains and the earth; and one remote signaling contact.
The SPDs mentioned in this manual are applicable for both 6kW and 9kW system. The SPD
used is the same as the one we used in FPRA.

1.2 Main Specification of the SPD


The SPD illustrated in this manual is made by ‘Phoenix Contact CO., Ltd’ (model number:
VAL-MS 230IT/3+1-FM), or SICHUAN ZHONGGUANG LIGHTNING (model number:
ZGG40-385(3+1)).

12 14 VAL-MS 230IT/3+1-FM
FM

11

VAL-MS 230 IT ST F-MS


L1 L2 L3 N 12 ST

Figure 1 – Internal circuit diagram of the SPD

Installation Manual for SPD, Rev AC Page 11 of 45


Flexi Power Rectifier FPRB

The SPD (module name ‘VAL-MS 230IT/3+1-FM’) consists of three equivalent OVP
modules used between live cables and neutral cable from the AC mains (module name
‘VAL-MS 230 IT ST’), one OVP module used between the neutral cable from the AC
mains and the earth (module name ‘F-MS 12 ST’) and one remote signaling contact
(module name ‘VAL-MS 230IT…-FM’) (see Figure 1).

The four OVP modules and the remote signaling contact are all installed on the SPD base
and can be removed from the base. This structure leads to easier configuration and
replacement of the OVP modules (see
Figure 2).

F-MS12 ST
VAL-MS
230 IT ST

Base

VAL-MS
230IT…-FM Terminal

Figure 2 – Structure of the SPD

Installation Manual for SPD, Rev AC Page 12 of 45


Flexi Power Rectifier FPRB

Figure 3 and Figure 4 show the dimension of the SPD. The four OVP modules are of the
same dimensions.

17.5m 17.5m
70m

VAL-MS 230IT/3+1-FM

ZGG40-385(3+1)
Figure 3 – Dimension of the SPD – top view

Installation Manual for SPD, Rev AC Page 13 of 45


Flexi Power Rectifier FPRB

VAL-MS 230IT/3+1-FM

ZGG40-385(3+1)

Figure 4 – Dimension of the SPD – side view

Installation Manual for SPD, Rev AC Page 14 of 45


Flexi Power Rectifier FPRB

Table 4 lists the main specifications of the OVP modules.

Table 4 – Main specification of the SPD

Module name Parameter Specification Description

VAL-MS 230 IT UN (L-N / L-L) 230VAC / 400VAC Rated voltage


ST
UC (L-N) 385VAC Clamping voltage
(OVP module for
L-N)
UP (L-N) ≤1.9kV Protective voltage

In / Imax (8/20 μS) 20kA / 40kA Rated discharge current /


maximum discharge current

Screw thread / torque M5 / 4.5Nm

F-MS 12 ST UN (N-PE) 230 VAC Rated voltage


(OVP module for
UC (N-PE) 260VAC Clamping voltage
N-PE)
UP (N-PE) ≤1.0kV Protective voltage

In / Imax (8/20 μS) 20kA / 40kA Rated discharge current /


maximum discharge current

Screw thread / torque M5 / 4.5Nm

VAL-MS 230IT…- Imax AC: 3A (125V)


FM
0.75A (250V)
(Remote
signaling DC: 2A (30V)
contact)1
Screw thread / torque M2 / 0.25Nm

VAL-MS Temperature -40°C ~ +80°C


230IT/3+1-FM
IP-code IP20 Ingress Protection (IP)
(The whole SPD
degree
module)
Class II IEC 61643-1: 2005-01

Type 2 EN 61643-11: 2002-12

Installation Manual for SPD, Rev A


AC Page 15 of 45
Flexi Power Rectifier FPRB

Note:
1
Although the SPD remote signaling contact has three pins, only two are applied when
configured in the FPRB. Refer to Figure 13

1.3 Properties
 Typical use
Figure 5 shows the configuration of the SPD in a TN-S system.

Figure 5 – SPD configuration in a TN-S system

Note:

It is recommended to use the SPD with a mains utility offering the appropriate line
fuse protection.

Installation Manual for SPD, Rev AC Page 16 of 45


Flexi Power Rectifier FPRB

 Failure Detection

If any OVP module has been damaged, Artesyn will provide the user with the individual OVP
module but not the whole SPD for replacement.

In the event that any one of the four OVP modules is damaged, the PDA will send alarm
signal via the LCD.
After opening the rear top cover of the PDA (refer to section 3.4 of the ‘Flexi Power
Rectifier – Installation Manual’, Artesyn File No. 970-009475-0000), the user can confirm
which OVP module is in failure.

 Failure Indication

If the window is transparent, the OVP is OK; if the window is red, the OVP is damaged
and should be replaced in time (see Figure 6).

Window

Figure 6 – Checking failure of the SPD

Installation Manual for SPD, Rev AC Page 17 of 45


Flexi Power Rectifier FPRB

Chapter 2 Preparation
2.1 Installation tools
Tool kit:
Allen key (hex key): 8 mm (0.31 in.)
Allen key (hex key): 4 mm
Awl: diameter of 2mm
ESD wrist strap and cable
TORX screwdriver set: T10, T20, T25
Flat screwdriver
Cross screwdriver
Wrench 13 mm (0.51 in.)
Folding knife
Adjustable (monkey) wrench
Side cutters
Lint-free swab or wipe and 99% alcohol for cleaning optical connectors
Cable ties for routing cables
Tape measure
Flashlight, pocket lamp or torch
Hammer drill
Marker pen or comparable tool
Pliers
Wire-stripper
Test equipment:
Multi-meter

2.2 Delivery contents


The SPD is optional for the user and shipped independent from the FPRB.
Verify that all the material listed in Table 5 has been received and is in good condition.
Report any missing or damaged items to our Artesyn Embedded Technologies Service
Department.

Installation Manual for SPD, Rev AC Page 18 of 45


Flexi Power Rectifier FPRB

Table 5 – Delivery contents of the SPD

Part Figure Description Usage Artesyn Artesyn


Part Number Module
Number

SPD Surge Protective Device 1 pc 440-000700-


0000
Manufacturer p/n:VAL-MS
230IT/3+1-FM
Manufacturer: PHOENIX
CONTACT (SEA), PTE. LTD.

Surge Protective Device


Manufacturer p/n: ZGG40-
385(3+1)
Manufacturer: SICHUAN
ZHONGGUANG LIGHTNING
PROTECTION TECHNOLOGIES
CO.,LTD.

SPD Short link for SPD terminals in 1 each 502-000496-


AA25130L
Jumper single-phase AC connection 000X/
(Color of plastic may vary) 500-001769-
0000

L line L1/L2/L3 for three phase, 1 750-000984-


short link 000X
L for single phase (AWG10)

N line N for three phase star, 1 750-000983-


short link 2 000X
N for single phase (10mm )

SPD SPD ground link to Chassis 1 750-000988-


ground 000X
link

SPD SPD signal cable connecting to 1 750-001004-


sense the MCU 000X
cable

Installation Manual for SPD, Rev AC Page 19 of 45


Flexi Power Rectifier FPRB

Chapter 3 SPD Installation

3.1 Make AC connection with the SPD

The AC power supply must be switched off prior to accessing the AC cable.

 This manual concentrates on the AC connection with the SPD, and omits the steps prior
to the SPD installation, i.e. the AC terminal block configuration, etc. The user should
refer to ‘Flexi Power Rectifier – Installation Manual’ (Artesyn File No. 970-009475-0000)
for the relevant previous steps.
 The colors of the AC mains wire used in this manual are for illustration purpose only.
However, the user should verify the AC mains referring to the color-coding in the
respective field or country of application.

Installation Manual for SPD, Rev AC Page 20 of 45


Flexi Power Rectifier FPRB

3.1.1 Preparation
3.1.1.1 Detach the PDA rear top cover referring to ‘Flexi Power Rectifier – Installation
Manual’ (Artesyn File No. 970-009475-0000).

3.1.1.2 Loosen screws A, B and C as per attached photo with a TORX screwdriver (T20) AC
SPD terminal
DIN Rail block

SPD ground B
clamp

AC ground A
clamp
PDA earth
cable

Strain-
relief

C SPD sensor
F connection
Figure 7 – PDA rear internal chassis layout

Installation Manual for SPD, Rev AC Page 21 of 45


Flexi Power Rectifier FPRB

3.1.1.3 Preparing the AC mains cable. The color of the wires may vary depending on the
country where the SPD will be mounted.

Table 6 – Recommended preparation for AC mains cable

(Tolerance: 3mm)

AC type L1 L2 L3 N PE

Single-phase A (mm) 55 70 100

(1Φ) B (mm) 20 20 20

2-phase A (mm) 55 100 N/A

B (mm) 20 20 N/A

3-phase delta A (mm) 55 60 70 N/A 100

(3Δ) B (mm) 20 20 20 N/A 20

3-phase star A (mm) 55 60 70 85 100

(3Y) B (mm) 20 20 20 20 20

Installation Manual for SPD, Rev AC Page 22 of 45


Flexi Power Rectifier FPRB

Table 7 – AC connection with the SPD

AC type Terminals connection Short link available (1) AC terminal block SPD configuration
Configuration (2)
(3)
AC SPD AC terminal Chassis
mains block

N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and Short terminals L1,
4,5,6 respectively L2, L3
L L2 5 N/A L2 for three-phase

N/A L3 4 N/A L3 for three-phase



N N 2 N/A N for single phase

PE N/A N/A AC ground clamp N/A

N/A N/A SPD ground clamp SPD ground link

2-Phase N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and Short terminals L1,
4,5,6 respectively L2, L3

L1 L2 5 N/A L2 for three-phase

N/A L3 4 N/A L3 for three-phase

L2 N 2 N/A N for single phase

N N/A N/A AC ground clamp N/A

N/A N/A SPD ground clamp SPD ground link

L1 L1 6 N/A L1 for three-phase Short terminals 1,2,3 N/A


3Y
L2 L2 5 N/A L2 for three-phase

Installation Manual for SPD, Rev AC Page 23 of 45


Flexi Power Rectifier FPRB

L3 L3 4 N/A L3 for three-phase

N N 2 N/A N for three-phase star

PE N/A N/A AC ground clamp N/A

N/A N/A SPD ground clamp SPD ground link

L1 L1 5 N/A L1 for three-phase Short terminals 1,2 and 3,4 N/A


and 4,5 respectively
L2 L2 3 N/A L2 for three-phase

3Δ L3 L3 1 N/A L3 for three-phase

PE N/A N/A AC ground clamp

N/A N N/A SPD ground clamp SPD ground link

Note:
(1) The short link names listed herein are in accordance with the actual labels on the short links.
(2) The AC terminal block should be configured before the AC connection. User shall refer to section 3.4 in
Flexi Power Rectifier – Installation Manual (Artesyn file No.970-009475-0000) for more details

Installation Manual for SPD, Rev AC Page 24 of 45


Flexi Power Rectifier FPRB

(3) Refer to Table 3for the corresponding clamps.


Table 8 – Schematic diagram of AC connection with the SPD
AC Schematic diagram Configuration of AC
Type terminal block

Short terminals 1,2,3


AC Terminal Block
SPD 1 2 3 4 5 6

L1 L2 L3 N

3Y

PE L1 L2 L3 N
AC Mains

Short terminals 1,2,3;


AC Terminal Block
SPD 4,5,6 respectively
L1 L2 L3 N 1 2 3 4 5 6

PE L N
AC mains

Installation Manual for SPD, Rev AC Page 25 of 45


Flexi Power Rectifier FPRB

Short terminals 1,2; 3,4;


AC Terminal Block
5,6 respectively
SPD 1 2 3 4 5 6

L1 L2 L3 N

3∆

PE L1 L2 L3
AC mains

Short terminals 1,2,3;


4,5,6 respectively

2-phase

Installation Manual for SPD, Rev AC Page 26 of 45


Flexi Power Rectifier FPRB

3.1.2 Configure the Terminal Block

Verify the AC power system types in field, and make sure the corresponding bridge
configuration is used.

The AC terminal block has been already configured for 3-phase star AC mains before
the shipment. Therefore the user has to change the AC terminal block configuration
if required referring to the actual AC type in field.

Insert the bridges and screws (provided as accessories) to the corresponding slots on
top of the AC terminal block referring to the AC CABLE CONNECTION CHART located
on the chassis (and reproduced in Figure 8).
Secure the screws with a flat screwdriver, tightening to 0.8Nm.

Figure 8 – The AC cable connection chart

There are three AC power system types (see above Figure), and thus three AC
configurations of the AC terminal block.

Installation Manual for SPD, Rev AC Page 27 of 45


Flexi Power Rectifier FPRB

 Single-phase (1Φ) and Two-phase (2Φ ) configuration


For Single- phase AC system, use two 3-pole bridges to short the terminals 1, 2,
3 and 4, 5, 6 respectively on the AC terminal block (see Figure 9)

Figure 9 – AC terminal block configuration – 1Φ and 2Φ Configuration

 3- phase delta (3Δ) configuration


For 3-phase delta AC system, use three 2-pole bridges to short the terminals 1, 2
and 3, 4 and 5, 6 respectively on the AC terminal block (see Figure 10 )

Figure 10 – AC terminal block configuration – 3Δ

Installation Manual for SPD, Rev AC Page 28 of 45


Flexi Power Rectifier FPRB

 3- phase star (3Y) configuration


For 3-phase star AC system, use one 3-pole bridges to short the terminals 1, 2, 3
on the AC terminal block (see Figure 11)

Figure 11 – AC terminal block configuration – 3Y

3.1.3 3-phase star (3Y) AC connection with the SPD

AC Terminal Block
SPD 1 2 3 4 5 6

L1 L2 L3 N

PE L1 L2 L3 N
AC Mains
Figure 12 – Schematic diagram of AC connection with the SPD – 3Y

Installation Manual for SPD, Rev AC Page 29 of 45


Flexi Power Rectifier FPRB

 The terminal marks in Figure 12 are in accordance with the actual SPD and AC
terminal block.
 Use the indicated L or N short link for the AC mains as shown in Figure 12 and Table
7 referring to labels on the short links.
 The terminals 1, 2, 3 on the AC terminal block should be shorted before the
connection. Refer to section 3.4 in Flexi Power Rectifier – Installation Manual
(Artesyn file No.970-009475-0000) for details.

3.1.3.1 Detach the cable strain-relief from the chassis by loosening the screw ‘C’ in
Figure 7 with a TORX screwdriver (T20). Insert the AC mains cable on the
strain relief.
3.1.3.2 Detach the AC ground clamp and SPD ground clamp from the chassis by
loosening the screws ‘A’ and B ‘with a TORX screwdriver (T20).
3.1.3.3 Prepare the AC mains of 3-phase star as per Table 6.
3.1.3.4 Assemble the Link cables, the AC mains cable, the SPD sensor cable and the
SPD grounding cable into the SPD. Refer to Figure 13

L1 for
three-
phase

L2 for
three- SPD
phase sense
cable

L3 for
three-
phase

N for
three-
phase
star SPD
ground
cable

Figure 13 - Assemble the Link Cables to SPD

Installation Manual for SPD, Rev AC Page 30 of 45


Flexi Power Rectifier FPRB

Insert the connector of the SPD sense cable into the left two contacts; otherwise it will
block the SPD from installing onto the chassis.

3.1.3.5 Fix the AC ground wire into the terminal lug.

.
Figure 14 - AC Ground wire
3.1.3.6 Secure the SPD into the SPD DIN rail. Connect the SPD sense cable to the
stand by mating connector. Connect the SPD grounding cable into the
terminal lug. Refer to Figure 15.

SPD
Grounding
cable
SPD

SPD
sense
cable

Figure 15 - Secure the SPD into the DIN rail

Installation Manual for SPD, Rev AC Page 31 of 45


Flexi Power Rectifier FPRB

3.1.3.7 Connect the AC link cables from SPD to the Terminal Block. Assemble the
SPD grounding cable and the AC grounding cable into the PDA

SPD
grounding N link
cable lug cable
L3 link
cable
L2 link
cable

AC L1 link
grounding cable
cable lug

Figure 16 - Connect the Link cables to Terminal Block

1. Use the appropriate L and N short link referring to the label on the short links
and the indications in Figure 12 and Table 7.
2. Rotate the N link cable 90 degrees either clockwise or counter clockwise when
assembling the SPD on the FPRA due to the smaller slot of the terminal block.
Refer to Figure 17 - Special Instruction for N Link Cable Installation

Installation Manual for SPD, Rev AC Page 32 of 45


Flexi Power Rectifier FPRB

Figure 17 - Special Instruction for N Link Cable Installation

It is recommended to clamp the AC wire and the corresponding short link with one
overlapping on another.

Installation Manual for SPD, Rev AC Page 33 of 45


Flexi Power Rectifier FPRB

Below figure shows the PDA rear layout after completing the 3-phase star AC
connection with the SPD.

SPD ground
cable

N
N short link

L3
L1 short link

L2

L2 short link

L1 L3 short link

PE of AC
mains SPD sense cable
Figure 18 – AC connection with the SPD - 3Y

3.1.3.8 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to ‘Flexi Power Rectifier – Installation Manual’ (Artesyn File
No. 970-009475-0000).

 After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
 It’s strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.

Installation Manual for SPD, Rev AC Page 34 of 45


Flexi Power Rectifier FPRB

3.1.4 Single-phase (1Φ) AC connection with the SPD

SPD ground link N for single phase

SPD ground AC Terminal Block


clamp
SPD
L1 L2 L3 N 1 2 3 4 5 6

L3 for three-phase
AC ground
clamp PE L N L2 for three-phase
AC mains L1 for three-phase

Figure 19 – Schematic diagram of AC connection with the SPD – 1Φ

 The terminal marks in Figure 19 are in accordance with the actual SPD and AC
terminal block.
 Use the indicated L or N short link for the AC mains as shown in Figure 19 and Table
7 referring to labels on the short links.
 The terminals 1,2,3 and 4,5,6 on the AC terminal block should be shorted
respectively before the connection. Refer to section 3.4 in Flexi Power Rectifier –
Installation Manual (Artesyn file No.970-009475-0000) for details.

3.1.4.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables.
3.1.4.2 As indicated in Figure 19 and Table 7, the SPD terminals L1, L2 and L3 have to be
paralleled by the SPD jumper (see Figure 20).

Installation Manual for SPD, Rev AC Page 35 of 45


Flexi Power Rectifier FPRB

 The user should loosen the three terminal clamps of L1, L2 and L3, and hold the SPD
upside down. Thus the SPD jumper can be easily inserted into the parallel clamps.
 The jumper should be fixed in the SPD together with the live cables of the AC mains
and L line short links.

SPD jumper

Figure 20 – SPD configuration for single-phase AC connection

3.1.4.3 Connect the live cable from the AC mains and L2 short link into terminal ‘L2’ on
the SPD referring to Figure 19 and Table 7, tightening the top screw to 4.5Nm
with a cross screwdriver (see Figure 21).

Installation Manual for SPD, Rev AC Page 36 of 45


Flexi Power Rectifier FPRB

N for single
SPD phase
ground
link

L3 for
three-
SPD ground phase
clamp

L2 for
three-
phase
AC ground
clamp

L1 for
three-
phase

Figure 21 - Connection of AC link cables from SPD to Terminal Block

3.1.4.4 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to section 3.4 in ‘Flexi Power Rectifier – Installation Manual’
(Artesyn File No. 970-009475-0000).

Installation Manual for SPD, Rev AC Page 37 of 45


Flexi Power Rectifier FPRB

3.1.5 2-phase AC connection with the SPD

SPD ground link

SPD ground
clamp

L3 for three-phase
AC ground
clamp L2 for three-phase

L1 for three-phase

Figure 22– Schematic diagram of AC connection with the SPD – 2- Phase

3.1.5.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables
3.1.5.2 As indicated in Figure 19 and Table 7, the SPD terminals L1, L2 and L3 have to be
paralleled by the SPD jumper (see Figure 20).

Installation Manual for SPD, Rev AC Page 38 of 45


Flexi Power Rectifier FPRB

3.1.5.3 Connect the AC link cables and the AC cables to the SPD and to terminal block.
Refer to Figure 23)
N for single
SPD phase
ground
link

L3 for
three-
SPD ground phase
clamp

L2 for
three-
phase
AC ground
clamp

L1 for
three-
phase

Figure 23 - AC connection with the SPD – 2- Phase

3.1.5.4 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to section 3.4 in ‘Flexi Power Rectifier – Installation Manual’
(Artesyn File No. 970-009475-0000).

 After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
 It’s strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.

Use DMM to measure L1-L2 voltage


Ensure L1-L2 voltage between 180VAC-276VAC

Installation Manual for SPD, Rev AC Page 39 of 45


Flexi Power Rectifier FPRB

 The terminal marks in Figure 22 are in accordance with the actual SPD and AC
terminal block.
 Refer to Single-phase (1Φ) AC connection for details.

3.1.6 3-phase delta (3Δ) AC connection with the SPD

SPD ground link

AC Terminal Block
SPD 1 2 3 4 5 6

L1 L2 L3 N

L3 for three-phase

L2 for three-phase

AC ground
clamp L1 for three-phase
PE L1 L2 L3 SPD ground
AC mains clamp

Figure 24 – Schematic diagram of AC connection with the SPD – 3Δ

 The terminal marks in Figure 24 are in accordance with the actual SPD and AC
terminal block.
 Use the indicated L or N short link for the AC mains as shown in Figure 24 and Table
7 referring to labels on the short links.
 The terminals 1,2 and 3,4 and 5,6 on the AC terminal block should be shorted
respectively before the connection. Refer to section 3.4 in Flexi Power Rectifier –
Installation Manual (Artesyn file No.970-009475-0000) for details.

Installation Manual for SPD, Rev AC Page 40 of 45


Flexi Power Rectifier FPRB

3.1.6.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables
3.1.6.2 Configure the terminal block as per Figure 10
3.1.6.3 Assemble the AC cables, AC link cables into the SPD.
3.1.6.4 Assemble the AC link cables into the Terminal Block.

SPD
grounding
cable
connected to
N terminal of
the SPD.

N connected
to Ground

Figure 25 - Connection of AC link cables and SPD ground cables

Installation Manual for SPD, Rev AC Page 41 of 45


Flexi Power Rectifier FPRB

3.1.6.5 Connect the L1, L2 and L3 short links to terminals ‘5’, ‘3’, ‘1’ on the AC terminal
block respectively referring to Figure 24 and Table 7,, tightening the top screws
to 1.5Nm with a Cross screwdriver (see Figure 26).

SPD
Sense
Cable
L3
short
link
SPD
ground
link
L2
short
link

L1
short
link
Figure 26 – Connecting the AC terminal block – 3Δ

Installation Manual for SPD, Rev AC


A Page 42 of 45
Flexi Power Rectifier FPRB

3.1.6.6 Figure 27 shows the PDA rear internal layout after completing the 3-phase delta
AC connection with the SPD.

SPD
ground
link

L3 for
three-
SPD ground phase
clamp

L2 for
three-
phase
AC ground
clamp

L1 for
three-
phase

Figure 27 3-phase delta (3Δ) AC connection with the SPD

3.1.6.7 After finishing and checking the AC cable installation, replace the PDA rear cover
referring to section 3.4 in ‘Flexi Power Rectifier – Installation Manual’ (Artesyn
File No. 970-009475-0000).

 After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
 It’s strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.

Installation Manual for SPD, Rev AC Page 43 of 45


Flexi Power Rectifier FPRB

3.2 Replace the SPD

The AC power supply must be switched off prior to accessing the SPD.

 Ask Artesyn Embedded Technologies service people for help if any OVP module has
been damaged. Artesyn will provide the user with the individual OVP module but
not the whole SPD for replacement.
 The user shall only replace the damaged OVP module of the SPD without removing
the whole SPD from the PDA chassis.

The user can verify which OVP module has been damaged Referring to section
Properties.
3.2.1 Hold the two sides of the damaged OVP module and pull
pull it out from the SPD
base (see Figure 28)

Figure 28 – Removing the damaged OVP module from the SPD

Installation Manual for SPD, Rev AC


A Page 44 of 45
Flexi Power Rectifier FPRB

3.2.2 The SPD base is designed such that the two kinds of OVP modules cannot be
mixed when installing onto it (see Figure 29).

Figure 29 – The OVP module and the SPD base

3.2.3 Fit the new module into its position on the SPD base (see Figure 30).

Figure 30 – Fitting a new OVP module to the SPD

Installation Manual for SPD, Rev AC Page 45 of 45