19/09/2021:
Same as previous.
2.1 Drain beside G1 Road Previously Discussed:
CCCC to take intiative to improve the drainage.
JV asked CCCC to remove the siltation from the bed of the drain.
CCCC agreed.
19/09/2021:
Not discussed.
High temperature in the Previously Discussed: CCCC to submit a plan to reduce the
2.2
TBM/Tunnel JV requsted CCCC to show the effectiveness of the chiller machine inside the TBM. CCCC agreed and will temperature in the TBM/ Tunnel
arrange a meeting to show the chiller machine. BBA also pointed out to control the temperature and air
ventilation when starting right tunnel internal structure.
CCCC noted.
19/09/2021:
Not discussed.
CCCC to submit manufacturer Certification and
Equipment for environment
2.3 Previously discussed: calibrations document of international
parameters testing JV implied to translate the Chinese cerficates as CCCC is having a hard time obtaining the English standard for equipment
certificates.
CCCC noted.
19/09/2021:
JV indicated that the G1 and G2 roads have damaged extensively due to rainfall. CCCC needs to
repair the roads.
Maintenance of G1 and G2 CCCC noted.
2.4 CCCC to follow-up as per left column
road Previously discussed:
JV asked to spray water to suppress the excessive dust generated at the G1 and G2 road two or three times
a day.
CCCC noted.
19/09/2021:
JV reported there is still shortage of medicine in different first aid boxes in the site. CCCC needs
to refill the medicines more frequently.
CCCC noted.
2.5 First aid box CCCC to follow-up as per left column
Previously discussed:
CCCC reported they have given sufficient medicines in the first aid box all over the site. BBA and JV will
check the boxes for the medicine.
CCCC noted.
3 Other Items
19/09/2021:
JV reported slurry from the sediment pond was getting into the river water. CCCC needs to
rectify this issue.
3.1 Slurry storage CCCC noted. CCCC to follow-up as per left column
Previously discussed:
Page 2 of 5
Multi-lane Road Tunnel Project under the River Karnaphuli, Chittagong
Page 3 of 5
Multi-lane Road Tunnel Project under the River Karnaphuli, Chittagong
Attendance List
Location: Via Zoom Meeting Software
Page 4 of 5
Multi-lane Road Tunnel Project under the River Karnaphuli, Chittagong
Page 5 of 5