A B C D E F G H J K

110-XX-360 110-VV-350 A/B 110-VV-360 A/B 110-EE-390 110-VV-391 110-EE-392 110-GN-390 A/B 110-EE-395 110-VV-390 110-XX-450 NOTES:
HC DRIPS COALESCER CRACKED GAS PRIMARY LIQUID DRIER REGENERATION GAS REGENERATION GAS REGEN GAS CROSS FUEL GAS FILTER REGENERATION GAS REGENERATION GAS PSA UNIT 1. VALVE CLOSED DURING START-UP DRY-OUT.
DRIER 1000mm ID x 6100 mmT-T FEED HEATER FEED HEATER COND POT EXCHANGER EFFLUENT COOLER SEPARATOR
450mm ID x 1200 mmT-T 1600 mm ID x 3450 mmT-T 2. IMPORT HYDROGEN IN CASE PSA UNIT IS DOWN.
4200mm ID x 8700 mmT-T 110-VV-360 A/B NORMAL DUTY: 3.71 Mkcal/h NORMAL DUTY: 1.84 Mkcal/h NORMAL DUTY: 7.56 Mkcal/h
110-VV-350 A/B 110-EE-390 110-VV-391 110-EE-392 110-EE-395 110-VV-390 160 kg /h

FROM LC ON 110-VV-349 TO 110-RB-852


110-0332 4354 110-0383
110-VV-360 HYDROGEN

1 FC 1
2403 kg /h

125 kg /h

TO 110-CC-370 TO 110-RB-801
110-0334 3546 4356 110-0382
HC DRIPS HYDROGEN
LOW PRESSURE OVERRIDE

110-VV-360 A 110-VV-360 B
(OPERATING) (REGENERATING)

PC FC PC
16 kg /h

TO HDPE/LLDPE
4336 4351
AI HYDROGEN
H2O 110-XX-415 A/B
2 CAL CW 5 kg /h

2
TO 110-RB-520
4352 110-0354
HYDROGEN
FC CW

TC
3544 FROM OSBL HEADER
CAL HYDROGEN
110-XX-360 NNF
NOTE 2

NNF TO HYDROGENATION UNITS


110-0382
LC REGEN GAS
FROM 110-VV-349
110-0332 3540 INT
HC DRIPS

110-PA-360 A/B FROM 110-KA-400 A


4273 110-0342
TAIL GAS

38.2 °C

3 23.1 kg/cm ²[g]

3
306 kg/h

TO 110-VV-335 NNF
110-0331 FROM 110-VV-385
LIQUID PURGE 110-0335
REGENERATION GAS
AI
CO
110-XX-450 CH4
1219 kg /h

FROM 110-EE-405
4312 110-0341
RAW HYDROGEN

110-EE-392 110-EE-395
CW
NNF TO PLANT-I PSA

DPC RAW HYDROGEN


4323

FLARE
110-VV-391 PC
4 4
NOTE 1 TO 110-VV-922
LC 110-0394
110-VV-350 A 110-VV-350 B CAL FUEL GAS
(OPERATING) (REGENERATING)

110-0332
FROM 110-VV-349
3530
LEGEND
CRACKED GAS TO 110-VV-310
110-GN-390 A/B F 110-0331
S/U RECYCLE
SH COND
110-VV-390 STREAM NUMBER
AI CAL 110-EE-390
H2O PRESSURE, kg/cm² (g)
FC TC
TEMPERATURE, °C
FLOW RATE, kg/hr

C REVISED FOR BDEP 3/16/2011 NDuncan RKrishnasi MChaud


LC
B ISSUE FOR BDEP 2/22/2011 RWychico RKrishnasi KBush
5 A Issue For Design 12/17/2010 NDuncan RKrishnasi MChaud 5
CAL P1 ISSUED IFA 11/18/2010 NDuncan RKrishnasi KBush
TO 110-CC-220 P ISSUED IFIR 11/9/2010 NDuncan RKrishnasi KBush
110-0321
WATER REV REVISION DESCRIPTION DATE DRAWN PROC PROJ
CONFIDENTIAL
CAL THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF SHAW GROUP, INC.
AND IS TO BE RETURNED UPON REQUEST. ITS CONTENTS MAY NOT BE COPIED,
DISCLOSED TO THIRD PARTIES, OR USED FOR OTHER THAN THE EXPRESS PURPOSE FOR
WHICH IT HAS BEEN PROVIDED WITHOUT WRITTEN CONSENT OF SHAW GROUP, INC.
TC FC CLIENT
GAIL INDIA LIMITED
TO 110-VV-385
110-0335
GAIL PETROCHEMICAL COMPLEX-II
AI H2S
REGENERATION GAS PATA, UTTAR PRADESH, INDIA
CO2 TITLE
CO
TO 110-CC-360 PROCESS FLOW DIAGRAM
110-0334
CRACKED GAS CRACKED GAS DEHYDRATORS
GAS CRACKING UNIT
DESIGN CASE
6 6

110-PA-360 A/B 110-XX-415 A/B


HC DRIPS PUMP HYDROGEN BOOSTER
RATED CAPACITY: 6.4 m³/h COMPRESSOR
DIFF PRESSURE: 3.5 kg/cm² PROJECT NUMBER DRAWING NUMBER REVISION
110-PA-360 A/B
140704 140704-110-0333 C
A B C D E F G H J K