You are on page 1of 1

A B C D E F G H J K

110-VV-434 110-VV-420 110-EE-420 110-VV-425 110-CC-420 110-EP-425 110-VV-435 110-VV-430 NOTES:


EXPANDER 2 DISCHARGE DEMETHANIZER DEMETHANIZER DEMETHANIZER REFLUX DEMETHANIZER DEMETHANIZER EXPANDER 1 DISCHARGE EXPANDER 1 SUCTION 1. FOR USE DURING EXPANDER DOWN OPERATION AND/OR START-UP
DRUM REBOILER SEAL POT REBOILER DRUM 1100 / 3000 mm ID x 46700 mmT-T CONDENSER DRUM DRUM COOLDOWN.
1400mm ID x 3700 mmT-T 600 mm ID x 2200 mmT-T NORMAL DUTY: 4.41 Mkcal/h NOTE 3 NORMAL DUTY: 0.39 Mkcal/h 1200mm ID x 4000 mmT-T 1100mm ID x 3350 mmT-T
110-CC-420 2. START-UP BYPASS SHALL BE ISOLATED AND KEPT OUT OF SERVICE
110-VV-434 110-VV-420 110-EE-420 110-EP-425 110-VV-435 110-VV-430 DURING NORMAL OPERATION.
-137.5 °C

25.0 kg/cm ²[g]

3. BY CORE EXCHANGER VENDOR.


8253 kg/h

FROM 110-VV-404
1 110-0341 4046 1
METHANE RECYCLE/OFF GAS

FROM 110-EP-405 F NNF


110-0341
METHANE RECYCLE/OFFGAS

TO BYPASS AROUND 110-EP-405 A


110-0341

40.0 °C

H2
5.6 kg/cm ²[g]

AI CH4 TC
16959 kg/h

C2H4
2 C2H6 2
TO 110-VV-390
110-0333 4273
TAIL GAS
6.2 °C

3.8 kg/cm ²[g]

PC PC
16959 kg/h

FROM 110-EP-405 A
110-0341 4269
OFF GAS
FC
FC

FROM 110-VV-404 NNF 110-KA-400 B 110-KA-400 A


110-0341
START-UP RECYCLE
-150.0 °C

5.0 kg/cm ²[g]

16959 kg/h

NNF 23.2 °C

4.6 kg/cm ²[g]

TO 110-EP-405 F
110-0341 4222 4270
OFF GAS NNF
RESET
TC FC
110-VV-434 PC
3 -151.2 °C

3
NOTE 2
4215
NNF

PDC
LC
4212 -137.4 °C

-123.2 °C

4202

NOTE 1
11.1 kg/cm ²[g]

21.5 kg/cm ²[g]

C2R 18140 kg/h

3187 kg /h

-101°C
TO 110-EP-405 F C2R FC
110-0341 4220
METHANE RECYCLE
110-EP-425
LC H2 -98.5 °C

4111 AI CH4 21.5 kg/cm ²[g]

C2H4 11893 kg/h

C2H6
4 -89.7 °C

4102 110-VV-425 4104 4


21.8 kg/cm ²[g]

NOTE 3
110-VV-430
NNF

4118 LEGEND
-98.5 °C

4052
-101.9 °C

3371 kg /h

21.9 kg/cm ²[g]

7535 kg/h

STREAM NUMBER
FROM 110-VV-404 61
110-0341 4043
DEMETH 4TH FEED
-98.4 °C
110-VV-435 LC
21.9 kg/cm ²[g]

110-CC-420 PRESSURE, kg/cm² (g)


34837 kg/h

-137.9 °C

FROM 110-VV-403 55 TEMPERATURE, °C


110-0341 4033
DEMETH 3RD FEED 4205
-57.9 °C
FLOW RATE, kg/hr
50 4206
22.0 kg/cm ²[g]

36078 kg/h

FROM 110-VV-402
110-0341 4023
DEMETH 2ND FEED
B ISSUE FOR BDEP 2/22/2011 RWychico RKrishnasi KBush
-44.8 °C

49 LC
5 22.0 A Issue For Design 12/17/2010 NDuncan RKrishnasi MChaud 5
40
kg/cm ²[g]

26329 kg/h

FROM 110-VV-401 P1 ISSUED IFA 11/18/2010 NDuncan RKrishnasi KBush


110-0341 4013 34
DEMETH 1ST FEED 4210 P ISSUED IFIR 11/9/2010 NDuncan RKrishnasi KBush
FC TC 1
REV REVISION DESCRIPTION DATE DRAWN PROC PROJ
CONFIDENTIAL
C3R 4126 THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF SHAW GROUP, INC.
LLO TO FC ON 110-EP-401 AND IS TO BE RETURNED UPON REQUEST. ITS CONTENTS MAY NOT BE COPIED,
LC 110-0341 DISCLOSED TO THIRD PARTIES, OR USED FOR OTHER THAN THE EXPRESS PURPOSE FOR
WHICH IT HAS BEEN PROVIDED WITHOUT WRITTEN CONSENT OF SHAW GROUP, INC.
CLIENT
CO
CO2
GAIL INDIA LIMITED
110-VV-420 CH4 GAIL PETROCHEMICAL COMPLEX-II
110-EE-420 -18.9 AI C2H2
FC -19.0
92886
°C

kg /h
C2H4
46694
°C

kg /h
PATA, UTTAR PRADESH, INDIA
LLO C2H6
LC C3 TO 110-CC-450 TITLE
4110 4113 110-0343 PROCESS FLOW DIAGRAM
DEMETHANIZER BTMS
DEMETHANIZER
GAS CRACKING UNIT
C3R 4121
46192
DESIGN CASE
6 6
kg /h

TO 110-EP-401
110-0341 4114
DEMETHANIZER BTMS

110-KA-400 B 110-KA-400 A
RESIDUE GAS EXPANDER RESIDUE GAS EXPANDER
/ COMPRESSOR 2 / COMPRESSOR 1 PROJECT NUMBER DRAWING NUMBER REVISION

140704 140704-110-0342 B
A B C D E F G H J K

You might also like