110-EE-380 110-EE-381 110-EE-384 110-RB-380 A/B 110-EE-386 110-VV-385 NOTES:


ACETYLENE REACTOR ACETYLENE REACTOR ACETYLENE REACTOR ACETYLENE REACTOR ACETYLENE REACTOR SECONDARY DRIER
FEED/EFF EXCHANGER FEED HEATER INTERCOOLER 2700mm ID x 6600 mmT-T AFTERCOOLER 3500mm ID x 7100 mmT-T 1. THE N2 PRESSURE NEEDS TO BE HIGHER THAN THE PROCESS PRESSURE
NORMAL DUTY: 4.32 Mkcal/h NORMAL DUTY: 6.15 Mkcal/h NORMAL DUTY: 3.84 Mkcal/h NORMAL DUTY: 4.19 Mkcal/h BEFORE OPENING N2 VALVE.
110-RB-380 A/B 110-VV-385
110-EE-380 110-EE-381 110-EE-384 110-EE-386
2. ANALYSIS AND READOUT OF C2H2 TO BE ON FOR FAST LOOP RESPONSE.

3. REACTOR SOR/EOR TEMPERATURES ARE TYPICAL, SHALL BE CONFIRMED


FLARE AFTER SELECTION CATALYST SUPPLIER.
1 PC -24.2 °C

1
26.1 kg/cm ²[g]

114251 kg/h

TO 110-GN-401 A/B
3868 110-0341
CRACKED GAS

SL
110-EE-380
-34.1 °C

33.0 °C 110-EE-381
FROM 110-VV-366
110-0334 3610
HP DEETHANIZER OVERHEAD

LC
2 2

COND

110-0343

TC

NNF

AI
CO
C2H2
72.9 °C

SOR
C2H4
3 C2H6
120.0 °C

EOR 3

TC
PDI

TO 110-KA-300 4TH STAGE


110-0331
REACTOR RECYCLE MIN FLOW
N2
NOTE 1

FC
TO 110-EE-392
110-0333
REGENERATION GAS

110-RB-380 A 110-RB-380 B
NOTE 3 NOTE 3
110-VV-385
TI TI
4 4
TI TI

TI TI
LEGEND
TI TI

STREAM NUMBER

FLARE PRESSURE, kg/cm² (g)


TEMPERATURE, °C
FLOW RATE, kg/hr

B ISSUE FOR BDEP 2/22/2011 RWychico RKrishnasi KBush


SOR 88.3 °C

5 EOR 135.7 °C
AI 5
A Issue For Design 12/17/2010 NDuncan RKrishnasi MChaud
C2H2 FROM 110-EE-390
NOTE 2
110-0333 P1 ISSUED IFA 11/18/2010 NDuncan RKrishnasi KBush
REGENERATION GAS
P ISSUED IFIR 11/9/2010 NDuncan RKrishnasi KBush
REV REVISION DESCRIPTION DATE DRAWN PROC PROJ
CONFIDENTIAL
82.7 °C

SOR THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF SHAW GROUP, INC.


AND IS TO BE RETURNED UPON REQUEST. ITS CONTENTS MAY NOT BE COPIED,
123.1 °C

EOR 45.0 °C

DISCLOSED TO THIRD PARTIES, OR USED FOR OTHER THAN THE EXPRESS PURPOSE FOR
WHICH IT HAS BEEN PROVIDED WITHOUT WRITTEN CONSENT OF SHAW GROUP, INC.
CLIENT
110-EE-384 110-EE-386 GAIL INDIA LIMITED
CW CW GAIL PETROCHEMICAL COMPLEX-II
AI
H2O
PATA, UTTAR PRADESH, INDIA
TITLE
PROCESS FLOW DIAGRAM
C2 HYDROGENATION
GAS CRACKING UNIT
TO 110-KA-300
COOLDOWN RETURN
110-0331 DESIGN CASE
6 6

PROJECT NUMBER DRAWING NUMBER REVISION

140704 140704-110-0335 B