You are on page 1of 1

A B C D E F G H J K

110-EP-405 C/D/E 110-VV-630 110-VV-620 110-EP-601 A/B/C 110-VV-610 110-EP-425 NOTES:


110-VV-601 A/B/C
ETHYLENE PRODUCT COOLERS DEMETHANIZER CORE C2R 3RD STAGE SUCTION C2R 2ND STAGE SUCTION ETHYLENE PRODUCT C2R 1ST STAGE SUCTION DEMETHANIZER 1. BY CORE EXCHANGER VENDOR.
C2R FLASH DRUM EXCHANGER DRUM DRUM COOLER DRUM CONDENSER
2. RUNDOWN SIZED FOR 35% OF NORMAL GROSS PRODUCT (65% TO SPHERES,
NOTE 1 NORMAL DUTY: 3.80 / 3.38 / 1.40 Mkcal/h 2600 mm ID x 9350 mmT-T 2400mm ID x 6800 mmT-T NORMAL DUTY: 0.47 / 0.36 / 0.21 Mkcal/h 1900mm ID x 4900 mmT-T NORMAL DUTY: 0.39 Mkcal/h
110-EP-405 C
Mkcal/h
110-EP-405 D
Mkcal/h
110-EP-405 E
Mkcal/h
110-EP-601 A 110-EP-601 B 110-EP-601 C 35% TO TANK).
110-EP-425
Mkcal/h Mkcal/h Mkcal/h

110-VV-630 110-VV-620 110-VV-610 3. CORE EXCHANGERS AND FEED DRUMS PLACED IN COMMON COLD BOX
SERVICE.

1 1

110-KA-600
-2.9 °C

6.6 kg/cm ²[g]

47565 kg/h

-34.0 °C

TO 110-KA-600 3RD STAGE FROM PC ON 110-KA-600


2 110-0343
ETHYLENE REFRIGERANT
6906 6904 2 1 3RD STAGE SUCTION
110-0343 2

FROM 110-EE-456
110-0343
MIN FLOW NNF
PC

MIN FLOW

MIN FLOW

RESET
-60.0 °C

6614 -85.2 °C

6724 6810 -101.6 °C

3 6.7 kg/cm ²[g]

1.7 kg/cm ²[g]

0.2 kg/cm ²[g]

3
57793 kg/h

33796 kg/h

13770 kg/h

FC FC

110-VV-610
110-VV-620
110-VV-630

-32.6 °C
6612 6712
105356 kg /h

6804
FROM 110-EP-405 B
110-0343 6508 C3R
EHTYLENE REFRIGERANT FROM
110-KA-650
LC LC
LC
6606 6720
TO
110-VV-670
13767 110-EP-425
110-EP-405 D
kg /h

67247 kg /h

91340 kg /h

110-EP-405 C
4 6704 6706 6802 4
6604

LC
LEGEND

STREAM NUMBER
6718 3619 kg /h

PRESSURE, kg/cm² (g)


NNF
110-EP-405 E
TEMPERATURE, °C
(FOR S/U TURNDOWN)
47563 kg /h
FLOW RATE, kg/hr

FROM
OSBL
B ISSUE FOR BDEP 2/22/2011 RWychico RKrishnasi KBush
5 FC A Issue For Design 12/17/2010 NDuncan RKrishnasi MChaud 5
P1 ISSUED IFA 11/18/2010 NDuncan RKrishnasi KBush
FROM 110-VV-455 NNF TO ATM STORAGE
110-0343 P ISSUED IFIR 11/9/2010 NDuncan RKrishnasi KBush
ETHYLENE PRODUCT ETHYLENE PRODUCT
(RUNDOWN) NOTE 2 REV REVISION DESCRIPTION DATE DRAWN PROC PROJ
CONFIDENTIAL
THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF SHAW GROUP, INC.
NNF

AND IS TO BE RETURNED UPON REQUEST. ITS CONTENTS MAY NOT BE COPIED,


110-EP-601 A 110-EP-601 B 110-EP-601 C DISCLOSED TO THIRD PARTIES, OR USED FOR OTHER THAN THE EXPRESS PURPOSE FOR
WHICH IT HAS BEEN PROVIDED WITHOUT WRITTEN CONSENT OF SHAW GROUP, INC.
CLIENT
NNF NNF
GAIL INDIA LIMITED
110-VV-601 A 110-VV-601 B 110-VV-601 C GAIL PETROCHEMICAL COMPLEX-II
LC NOTE 1
LC LC
NOTE 1 NOTE 1 PATA, UTTAR PRADESH, INDIA
TITLE
PROCESS FLOW DIAGRAM
ETHYLENE REFRIGERATION
GAS CRACKING UNIT
NOTE 3
DESIGN CASE
6 NOTE 3 NOTE 3 6

110-KA-600
C2 REFRIGERANT / HEAT
PUMP COMPRESSOR
PROJECT NUMBER DRAWING NUMBER REVISION

140704 140704-110-0361 B
A B C D E F G H J K

You might also like