www.sapp.co.zw
By
Dr. Lawrence Musaba
SAPP Coordination Centre
JULY 2009
1. TRADING ARRANGEMENTS
2. BILATERAL TRADING
4. COMPETITIVE MARKET
5. CONCLUSION
PREVIOUSLY
PREVIOUSLY FUTURE
FUTURE
Bilateral
Bilateralcontracts
contracts Bilateral
Bilateralcontracts
contracts
Day-Ahead
Day-AheadMarket
Market(DAM)
(DAM)––From
From2007
2007
Ancillary
AncillaryServices
ServicesMarket
Market––From
From2007
2007
Balancing
BalancingMechanism
Mechanism––From
From2008
2008
CURRENT
CURRENT
Bilateral
Bilateralcontracts
contracts
Short-Term
Short-TermEnergy
EnergyMarket
Market(STEM)
(STEM)--2001
2001
Post
PostSTEM
STEM(Balancing
(BalancingMarket)
Market)--2002
2002
STEM
The short-term energy market (STEM) was introduced
in April 2001
Precursor to full competition
Caters for 5-10% of energy trade: 0.8 – 4.3 TWh
Daily and hourly contracts
Off-peak periods
Non-firm contracts:
Are interruptible with notice
If notice given, no penalties
Generally less than 75% reliable.
Firm contracts:
Most have attached reliability premium
Penalties for non-delivery applies.
Billing
Direct billing from seller to buyer.
Billing is on schedules and not on actual.
2004
Year
2003
2002
ZESCO -ESKOM 80
280 Energy (GWh)
SNEL-ESKOM 700 Capacity (MW)
100
SNEL -ZESA 770
110
Eskom-ZESA 793
150
HCB-ZESA 1,800
250
HCB-ESKOM 2,500
1,370
Eskom-LEC 230
100
Eskom-EDM 950
5,875
Eskom-Nampower 1,045
200
Eskom-BPC 1,606
210
Eskom-SEB 868
96
HCB-EdM 270
Eskom -MOZAL 950
EdM-SEC 40
EdM-NamPower 40
EdM-BPC 45
ZESA-NamPower 40
SNEL-Eskom 150
SNEL-ZESA 100
HCB-Eskom 1370
HCB-ZESA 250
Eskom-LEC 100
Eskom-EdM 120
Eskom-NamPower 200
Eskom-BPC 210
Eskom-SEC 96
Documentation
Participation
Billing
The SAPP-CC bills participants on a daily basis.
Billing is on schedules and not on actual.
e
ad
In
ow
Tr
st
Fl
ru
of
ct
Co
g
n
io
r
io
ne
ns
fir
at
fE
irm
to
o
at
nf
Tr
n
io
e
io
Co
ic
an
n
at
vo
of
sf
irm
In
er
Re
nf
ce
Co
ip
t
Buyers: Payment into Clearing Account Clearing
Participants
Sellers: Receipt from Clearing Account
Bank
Supply Demand
4,500
4,000
3,500
Energy in GWh
3,000
2,500
2,000
1,500
1,000
500
-
2001 2002 2003 2004 2005
Year
4,000 0.50
Usc/kWh 0.74
3,500 Usc/kWh
0.39
Usc/kWh 1.08
3,000
Usc/kWh
2,500
2,000
1,500
1,000 0.41
Usc/kWh
500
-
2001 2002 2003 2004 2005
METHODOLOGY:
Development of consistent market mechanisms.
Efficient price signals for the procurement and
transmission of electricity.
Assurance of fair and open access to the
transmission system.
Optimization of generation & transmission capacity.
Price ( $/MWh)
100
1. Market type
Auction type market
Participants bid into market for all 24 hrs of
next/future day.
2. Bidding
Participants submit both purchase & sale bids.
Types of bids: Single hour and Block bids.
3. Bid areas
Multiple bid areas with configurable transmission
capacities between areas.
5. Congestion Management
Calculated contract flow between bid areas
computed & compared with available transmission
capacity for spot trade.
In case of congestion, market splitting performed,
and local area prices calculated.
6. Auction results
Participants receive area prices with associated
volume. Multiple currencies.
28 SOUTHERN AFRICAN POWER POOL
4.4 DAM Trading Timeline
08:30 HRS
Usage of the bilateral contracts registered by participants.
Calculation of available transmission capacity performed.
Opening of the market for delivery day X.
09:30 HRS Market is closed for delivery day X.
10:00 HRS Price calculation
12:00 HRS Distribution of prices and schedules
12:30 HRS Participants receive price information & schedules.
13:00 HRS Deadline for complaints
14:00 HRS A report about the contracted volume per Balance
Responsible Party is sent to System Operators.
24.00 HRS Delivery start for Day-ahead contracts for hour 1
29 SOUTHERN AFRICAN POWER POOL
30 SOUTHERN AFRICAN POWER POOL
31 SOUTHERN AFRICAN POWER POOL
32 SOUTHERN AFRICAN POWER POOL
5. CONCLUSION