Sharing (LTE)
Site ID Site Name Candidate City/Province Customer PO
20587 UMAR_BAKI_PAYAROBA Z MEDAN/NORTH SUMATERA WPO_622
1. Information of Candidates
1 Accept
1.3. Rejected Sites List : (All list site identified by radio planning for which a SAR was not turned in)
1
Technical Site Survey Report For Site
Sharing (LTE)
2. General Existing Site Sharing information
H3I Site ID/ Number : 20587 Principal Owner : Protelindo Tower Transfer
GPS Coordinates:
Candidate Address: Jl. Letnan Umar Baki, Paya Roba, Binjai Bar., Kota Binjai, Sumatera Utara 20747
Yes No
No Length : 0 Width : 0
Objective Coverage
Sector 1 Permukiman,Perkebunan,Jalan
Sector 2 Permukiman,Masjid,Jalan
Sector 3 Permukiman,Masjid,Jalan
Technical Site Survey Report For Site
Sharing (LTE)
3. Radio Network Planning
Radio Requirement
Support/pole no. A B C A B C
Number of antennas 1 1 1 1 1 1
Antenna Frequency 1710 - 2170 1710 - 2170 1710 - 2170 1710 - 2170 1710 - 2170 1710 - 2170
Total Tilting 2 3 2 2 3 2
Feeder size/type (i.e. 7/8; 1 ; Feederless Feederless Feederless Feederless Feederless Feederless
etc):
Feeder length/ Feeder less 50m 50m 50m 50m 50m 50m
Technical Site Survey Report For Site
Sharing (LTE)
4. Existing Antenna (if available)
1
Technical Site Survey Report For Site
Sharing (LTE)
Note: Photo documentation should include but not limited to the following:
a. Actual proposed site status
b. Panoramic Photos.
c. Access information from the nearest road going to the actual site. Include information on the narrowest access
d. Power source. Including photo of the 3 Phase power source (i.e. 3 phase PLN pole) and nearest Transformer
e. Cable tray route and grounding route; including power route going to source
f. Incase there is need to demolish existing structure, photo of which should also be presented
0 30
60 90
120 150
180 210
240 270
300 330
Technical Site Survey Report For Site
Sharing (LTE)
Actual Proposed Site Status
Tower and All Existing Antenna (View A) Tower and All Existing Antenna (View B)
Tower and All Existing Antenna (View C) Tower and All Existing Antenna (View D)
Technical Site Survey Report For Site
Sharing (LTE)
8. COVERAGE PLOT
Horisontal cable tray and route available to Vertical cable tray and route available to
install: install: Other comments:
Yes Yes
Technical Site Survey Report For Site
Sharing (LTE)
12. Power Supply
Installation of aerial cable Yes No Additional poles required to reach the 3 phase supply: 0
allowed:
Power cable required to be installed Length of required underground installation : Ground condition where cables will pass:
underground:
Yes 0 Concrete
Others: 0
Distance from the nearest 0 Capacity of the PLN 0 Number of poles 0
transformer: Transformer: required:
Any private property which will be affected by pole location and Right of way for the PLN connection: Yes No
Length of power cable from the source to
Type of supply available: Spare breakers available for use: our proposed sub-meter:
single phase 0
10
Connect to Building: three phase
Supply permanent Distance of the proposed location from site: Soundproof required: Available space
Generator:
5 Yes No Rooftop
others 0
b. Complete proposed layout (tower/pole position/equipment/ACPDB/cable route,existing PLN/transformer pole etc. with all
dimensions including set back from property line on all sides)
c. Reflect any overhead/underground utilities crossing the site (powerline, telephone line, pipesetc.)
e. Reflect any high tension Cables running outside the building which can affect delivery (approx. height)
f. Sketch the proposed route for power connection; specify the distances as stated in above data
g. SITE CONTOUR / ELEVATION (reflect approximate contour of site/elevation view; provide the elevation reading per 3m)
Site Layout
Tower Layout
Proposed Equipment (on foundation) Proposed horizontal tray
Proposed Vertical Tray (ground to top) Proposed Vertical Tray (top to ground)
Existing Equipment
Type BTS TYPE Note B Type IP MW BSC RNC METRO E SDH Backbone Other
Existing Rectifier
Current Capacity Quantity of Module Space for new Module Remark ( recti cover
Rectifier Brand Type of Module
Module (A) (pcs) of equipment)
1 HUAWEI APM30H 0 3 EPW30-48A 0 0
Existing Battery
Number of bank Quantity of Battery Capacity of Battery
Brand Space for new Battery Remark Rectifier
Battery(Pcs) (Pcs) (AH)
RITAR 2 3 100 0 0 0
Existing Rectifier Existing Battery
Technical Site Survey Report For Site
Sharing (LTE)
17. Existing Power
Power PLN
PLN Capacity Phase-R A (AC) Phase-S A (AC) Phase-T A (AC) Trafo Capacity Jarak trafo ke site Genset (kVA)
Phase R Phase S
Phase T Trafo
Genset Others
Technical Site Survey Report For Site
Sharing (LTE)
18. Far End Sites
Yes No
Dhani Wijaya
Review Date
18-Sep-2020
Approval Date
Approval Comments