You are on page 1of 6

PERENCANAAN PACKING LIST AFTER JOB EPF P

Dimension in Meter
PKG NO DESCRIPTION - TECHNICAL SPECIFICATION QTY UOM
L W H

Horizontal Vessel 600 Psi :


- Test Separator
1 - LP Separator 7 Unit 6.05 2.43 2.57
- HP Separator
- KO Drum (2 Unit)
- FWKO

Vertikal Vessel :
- HP Gas Separator
2 - Vertical Scrubber 7 Unit 2.4 2.4 4.5
- Close Drain Pit
- Air Reciever
- Fuel Gas Filter
- Water Seal

7 6 Unit 6.5 2.43 2.4

Storage Tank 200 BBL


4 Container 40 ft 1 Unit 6.1 2.45 2.6
4 Container 20 ft 1 Unit 6.1 2.45 2.6
5 Container 10 ft 1 Unit 3.5 2.45 2.6
8 Fire Pump 1 Unit 2 1.5 1.6
9 (Test Tank 100 BBLS) 1 Unit 5.08 2.43 2.57
10 Transfer pump Elmot 8 Unit 1.5 1.02 1.2
11 Piping & Flare Stack 3 set 9 2 2
12 Engine Room consist of Genset 1 set 8.08 2.4 2.8
13 Concrete Block 40 Ea 9.08 2 1
14 Piping & Connection 5 set 6 2 1.5
15 Wilden Pump 2 Unit 1.2 1 2
16 Pig Launcher 1 Unit 4 1.5 2
17 SDV 4 Unit 1 1 2
18 Air Compressor 2 Unit 2.5 1.5 2
AFTER JOB EPF PDT
Weight(kg) Total (kg) Volume(m3) Remarks
Kgs Kgs m3

12000 84,000 264.479985

7000 49,000 181.44

TAN-SQR-218, TAN-SQR-271,
TAN-SQR-272, TAN-SQR-215,
TAN-SQR-292, TAN-SQR-250
7000 42,000 227.448

6000 6,000 38.857


6000 6,000 38.857
5000 5,000 22.295
500 500 4.8
3000 3,000 31.725108
2000 16,000 14.688
5000 15,000 108
7000 7,000 54.2976
12000 480,000 726.4
12000 60,000 90
80 160 4.8
700 700 12
80 320 8
300 600 15

Total (Kg) Total M3


775,280 1843
PT. BAMA BUMI SENTOSA
Pemilik : PT. BAMA BUMI SENTOSA Packing List No. : 05/BBS-BKS/IX/2015
Tujuan : Prabumulih Costumer Talisman
Sumur : JTB-1X

PACKING LIST SLICKLINE UNIT - SINGLE DRUM ( WLU-12)


NO DESCRIPTIONS QTY UOM DIMENSION IN METER WEIGHT TOTAL
L W H Kg Kg
1 Skid Real Pack Double Drum 1 Unit 1.61 1.09 1.5 1850 H
2 Powerpack 1 Unit 2.41 1.12 1.65 1800 1800
3 Tool Box 1 Unit 3.00 1.00 1.1 2500 2500
TOTAL 5600 Kg

PACKING LIST WELL TESTING EQUIPMENT FOR TALISMAN (JTB-1X)

NO DESCRIPTIONS QTY UOM DIMENSION IN METER WEIGHT TOTAL


L W H Kg Kg
1 Separator 600 1 unit 6.05 2.43 2.57 15000 15000
2 Test Tank 100 bbls 2 unit 5.08 2.43 2.57 3000 6000
3 Choke Manifold 1 unit 2.23 2 1 2000 2000
4 Storage Tank 200 bbls 3 unit 6.5 2.43 2.4 7000 21000
5 Genset 100 Kva 1 unit 2 1.3 1 4000 4000
6 Burner 1 unit 2.5 1.5 2.35 2000 2000
7 Pipe Basket 1 unit 4.37 1.5 2.23 5000 5000
8 Tubing 3-1/2" + 2-7/8" 1 set 10.15 0.65 0.4 2000 2000
9 Lab Cabin 20 Ft 1 unit 4.37 2.5 2.23 5000 5000
10 Transfer Pump ( ELMOT) 1 unit 2 1.5 2.23 5000 5000
TOTAL 67000

Bekasi, 18 Sep 2015


PT. BAMA BUMI SENTOSA

Wishnu Satria
PERENCANAAN PACKING LIST RIG DOWN EPF P
Dimension in Meter
PKG NO DESCRIPTION - TECHNICAL SPECIFICATION QTY UOM
L W H

Horizontal Vessel 600 Psi :


- Test Separator
1 - LP Separator 2 Unit 6.05 2.43 2.57
- HP Separator
- KO Drum (2 Unit)
- FWKO

Vertikal Vessel :
- HP Gas Separator
2 - Vertical Scrubber 1 Unit 2.4 2.4 4.5
- Close Drain Pit
- Air Reciever
- Fuel Gas Filter
- Water Seal
3 Tank 400 bbl 8 Unit 13.05 2.47 3.3
4 Container 20 ft 1 Unit 6.1 2.45 2.6
5 Container 10 ft 1 Unit 3.5 2.45 2.6
7 Storage Tank 200 BBL 1 Unit 6.5 2.43 2.4
8 Fire Pump 1 Unit 2 1.5 1.6
9 (Test Tank 100 BBLS) 1 Unit 5.08 2.43 2.57
10 Transfer pump Elmot 8 Unit 1.5 1.02 1.2
11 Piping & Flare Stack 3 set 9 2 2
12 Engine Room consist of Genset 1 set 8.08 2.4 2.8
13 Concrete Block 40 Ea 9.08 2 1
14 Piping & Connection 5 set 6 2 1.5
15 Wilden Pump 2 Unit 1.2 1 2
16 Pig Launcher 1 Unit 4 1.5 2
17 SDV 4 Unit 1 1 2
18 Air Compressor 2 Unit 2.5 1.5 2
RIG DOWN EPF PDT
Weight(kg) Total (kg) Volume(m3) Status Unit di Work shop
Kgs Kgs m3

12000 24,000 75.56571

7000 7,000 25.92

14000 112,000 850.9644


6000 6,000 38.857
5000 5,000 22.295
7000 7,000 37.908
500 500 4.8
3000 3,000 31.725108
2000 16,000 14.688
5000 15,000 108
7000 7,000 54.2976
12000 480,000 726.4
12000 60,000 90
80 160 4.8
700 700 12
80 320 8
300 600 15

Total (Kg) Total M3


744,280 2121