THERMAX CBL TRIVENI Option 1 TRIVENI Option 2 IBL

Sr. No. Item Description Qty. Price INR Lakhs Price (INR Lakhs) Price (INR Lakhs) Price (INR Lakhs) Price in Lac

1 Boiler with accessories 1 set 369 274 281 281 363


2 ESP 1 set 182 180 95 95 150
3 BOP 1 set 694 303 203 198 126
1,245 758 579 574 639
@100% flow

S. No. Description UoM CBL TRIVENI IBL THERM 10TPH Therm


BOILER AX Boiler opac

I D fan with MDC


1 Flow Cum/hr 48,000 47,500 71,525 33,000 22200 12100
Cum/
2 Flow sec 13.33 13.19 19.87 9.17 6.17 3.36

3 Specific air mtr/sec


velocity 7.25 7.25 7.25 7.25 7.25 7.25
4 Chimney top Mtr2
area 1.84 1.82 2.74 1.26 0.85 0.46
5 Chimney Mtr
radius 0.77 0.76 0.93 0.63 0.52 0.38
5 Chimney dia Mtr 1.53 1.52 1.87 1.27 1.04 0.77
Total required
dia mtr
1.92 1.91 2.25 1.65 1.43

@70% flow

S. No. Description UoM CBL TRIVENI IBL THERM 10TPH Therm


BOILER AX Boiler opac

I D fan with MDC


1 Flow Cum/hr 33,600 33,250 50,068 23,100 15540 8470
Cum/
2 Flow sec 9.33 9.24 13.91 6.42 4.32 2.35

3 Specific air mtr/sec


velocity 7.25 7.25 7.25 7.25 7.25 7.25
4 Chimney top Mtr2
area 1.29 1.27 1.92 0.89 0.60 0.32
5 Chimney Mtr
radius 0.64 0.64 0.78 0.53 0.44 0.32
5 Chimney dia Mtr 1.28 1.27 1.56 1.06 0.87 0.64
Total required
mtr
dia 1.60 1.60 1.89 1.38 1.19

@50% flow
S. No. Description UoM CBL TRIVENI IBL THERM 10TPH Therm
BOILER AX Boiler opac

I D fan with MDC


1 Flow Cum/hr 24,000 23,750 35,763 16,500 11100 6050
Cum/
2 Flow sec 6.67 6.60 9.93 4.58 3.08 1.68

3 Specific air mtr/sec


velocity 7.25 7.25 7.25 7.25 7.25 7.25
Chimney top
4 Mtr2
area 0.92 0.91 1.37 0.63 0.43 0.23
Chimney
5 radius Mtr 0.54 0.54 0.66 0.45 0.37 0.27
5 Chimney dia Mtr 1.08 1.08 1.32 0.90 0.74 0.54
Total required
dia mtr
1.35 1.35 1.59 1.17 1.01
h g t1 t2
32 9.81 150 30

t1-t2 120 0.396 124.32 0.65

273+t2 303 11.15 7.25


14 TPH BOILER
S. No. Description UoM CBL TRIVENI BOILER IBL THERMAX
A Performance
1 Model RG TYPE TBPL/SMB-7/RG BMF - RG -140 CPRG
2 Steam capacity (F&A 100 deg.C) Kg/hr. 14TPH 14TPH 14TPH 14TPH
3 Designed Pressure Kg/sqcm 10.54 10.54 10.54 10.54
4 Operating pressure @ (Main Steam Stop Valve) Kg/sqcm 10 10 10 8
5 Steam quality dry SATURATED Saturated Saturated
6 Steam Temperature Deg C 180-185 186 185°C
7 Dryness fraction 98% 99% 98% 98%

8 Fuel 100% Briquettes MULTI FUEL {BAGGASSE / Crushed Briquette Biomass Briquette
WOOD CHIPS / COAL}

AUTOMATIC FIRING
9 Firing Automatic Through Screw Feeder Through Screw Feeder
FEEDER

10 Makeup water Temp Deg C Client has to provide Client Input 40°C 30 Deg. C
Condensate Flow rate % and Temperature
11 Client has to provide Client Input 80% 40% @ 90 °C
considered at De-aerator inlet
Feed water temp at De-aerator outlet and
12 Deg C 100 - 105 deg 95 105 °C 105 °C (Customer to confirm)
Economizer inlet
13 Installation (Indoor/ Outdoor) Indoor Semi Outdoor Indoor Indoor (Undershed)

14 Type of boiler Reciprograting type Multi Fuel Combination Reciprocating Grate Boiler Smoke Water cum Smoke tube type
Type Hybrid Steam Boiler Cum Water Tube
15 Efficiency with different fuel with GCV (ARB) % 78 ± 2%
a Briquettes 100% % 77%+/-2% 78% ± 2% 78% 77% (± 2%) on GCV Basis
b Niligiri wood chips 100% % 75%+/-2% 76% ± 2% 76%
c Briquettes 50% and nilgiri bark 50% % 76%+/-2% 76% ± 2% 77%
16 Fuel Consumption
a Briquettes 100% @3817 Kcal/kg Kgs/Hr. 2728 3140 2517 2625
b Niligiri wood chips 100% @ 3274 Kcal/kg Kgs/Hr. 3469 3350 3422
c Briquettes 50% and nilgiri bark 50% Kgs/Hr. 1364 + 1735 ( Tentative)= 3200 2970
3099
17 Steam to fuel ratio
a Briquettes 100% @3817 Kcal/kg Kg/kg 5.1 4.6 4.6 4.81
b Niligiri wood chips 100% @ 3274 Kcal/kg Kg/kg 4 3.9 3.9
c Briquettes 50% and nilgiri bark 50% Kg/kg 4.6 4.1 4
13 Feed water temperature deg. C 105 85 90°C 105 (Customer to confirm)
14 Hot air temperature deg. C 40 110 90-100 Not applicable
15 No. of passes Nos. 4 Passes One 2 Later
B HEAT EXCHANGER FEATURE (HTA)
1 Membrane water wall panel Sqm 407 137 169 Approx. 136 m2
2 In Bed tubes & header Assembly Sqm NA 61 NA Not applicable
3 Shell & Tube heat exchanger Sqm 331 358.38 440 Approx. 224.2 m2

4 Others-steam interface,steam space and water Sqm 10.26 Later Later


holding 11.28 M2 /4.36 M3/29 M3

C. Matetial of Construction
14 TPH BOILER
S. No. Description UoM CBL TRIVENI BOILER IBL THERMAX
Smoke tubes & MPA tubes BS 3059 Pt-1 ERW-320 BS 3059 / 1987 PT - I BS 3059 PT-I 1987 ERW 320 BS 3059 Part I Gr. 320 ERW
Shell SA 515/516 Gr-70 SA 516 GR. 70 SA515/516Gr70/IS2041R260 SA 515/516 Gr. 60/70
Fans IS 2062 IS 2062 IS2062 IS 2062
Tube - BS 3059 Part-I, ERW;
Economizer BS 3059 Pt-1 ERW-320 BS 3059 / 1987 PT - II NA
Jacket – IS 2062;
Structural Support IS 2062 IS2062 MS/ IS 2062
D. Combustor Specifications

Type Reciprograting Type Reciprograting Type Reciprograting Type Lambion Sloped


Reciprocating Grate
Furnace draft type Negative VFD Balance Draft Balance draft

Firing type Automatic Over Feeding screw or Screw Feeder Screw Feeder
Pusher.

30% however some of the


Turn-Down Ratio items are to be By-passed 1: 3 1:02 30% to 100%
during operation of the boiler.
E. FEED WATER PUMPS
Vertical, multistage
1 Type Vertical Centrifugal Horizontal Vertical
centrifugal pump
2 Make CNP/LUPI KSB Lubi
3 Capacity m3/hr 16.8 16 14 ~ 16
4 RPM RPM 2900 2900 2900 < 2900
5 Motor KW/HP 11 KW 20 K.W 11 Kw 15 kW
6 Quantity Nos 2 2 Nos 2 (1W+1S) 2 Nos. (1W + 1S)

F. Furnace structure
1 Grate area Sqm 11.75 12.63 12.6 Approx, 10.16
2 Furnace size LXWXH During detail engineering 5.2 mtr x 2.43 mtr x 2 DDE DDE
3 Plenum chamber area Sqm Not Applicable NA Not applicable
4 Grate materials Nos. Not Applicable NA Not applicable
5 Details and MOC of Grat materials Not Applicable NA Not applicable
G I D fan with MDC
1 Flow Cum/hr 48000 47500 71525 33000
2 Head mmWC 350 350 mmwc 225 ~ 400 mmWC
3 Motor KW/HP 75 kW 75 kW 75 kW 90 kW
RPM rpm 960
H F D fan FD Fan / SFD Fan
1 Flow Cum/hr 25200 27000 35600 11400 11400
2 Head mmWC 450 500 200 200 mmWC / 250 mmWC
3 Motor KW/HP 45 kw 55 kw 30Kw 15 kW / 11 kW

I Economizer

1 Type Pressurized Integral Type With IBR Shell & Tube Integral Type

2 Heat transfer area Sqm During detail engineering 100 M2 218 M2 Approx. 250 m2
14 TPH BOILER
S. No. Description UoM CBL TRIVENI BOILER IBL THERMAX

3 Size LXWXH During detail engineering DDE DDE DDE

J Stack temp. Deg C 150 deg 160 Deg. C 160-180°C Aprrox. 170 °C

K MDC with RAV Tima Cyclone

1 No. of cone and size Nos. 2 nos 1 ø1390X4 Nos


2 RAV Inch NA 1 12"X6"
3 Pressure drop mmWC 110 40 - 50 70-80
4 Size LXW During detail engineering 1800 x 6 mtr DDE

L Screw feeder Drum Feeder


1 Screw feeder No. 2 2 2x 12" 3 Nos.
2 Motor KW/HP 2.2 3 K.W 2.2Kw X 2 Nos. 1.1 kW
M Sprader fan/ Booster fan
1 Power KW/HP 30 15 HP 9kW
2 Flow Cum/hr 9000 1500 7200 Not applicable
3 Head mm WC 650 1000 300
N Total connected load Kw 225 209
O Compressed air requirement CFM During detail engineering No Later

P Space requirement - L*B*H Mtrs 30m x 17m

We have considered Bagfilter


Q ESP as pollution control
Equipment
a Gas flow rate M3/hr. DDE 47457 33668 ~ 28300
b Inlet dust load M3/hr. DDE 250 11 mg/m3 5.9 mg/Nm3
Ultimate Analysis of fuel Required 0.10%
c So2 content in flue gas % DDE
on ARB Basis.
e DP across field mmWC 25-30 20 30 DDE
f Maximum outlet dust emission mg/Nm3 100 ˂ 50 100 < 50 mg/Nm3
h No. of field Nos. 2 2 3 Later
R Others
1 O2 Analyser set Considered Considered Can be Provided on Extra Cost 1 No.
2 Combustion air ducting Considered Considered Client Scope
Pl. enclose details of system Please Refer Technical
3 Fuel Handling system Considered Considered
proposed (Client Scope) Offer/Layout

Pl. enclose details of system


4 Ash handing system Considered Considered proposed (Can be provided on Please Refer Technical
extra cost) Offer/Layout

5 Deaerator Capacity Atomospheric Dearator Head 15 KL Pl. enclose details of system Customer Scope
is been considered proposed (NA)
14 TPH BOILER
S. No. Description UoM CBL TRIVENI BOILER IBL THERMAX

6 Fuel handling System Capacity 6 TPH 7.5 TPH Client Scope Please Refer Technical
Offer/Layout
7 Fuel Buncker Capacity 10 m3 15 MT 30 Min (client Scope) 20 m3
1200 mm ( Not Part of CBL Existing Chimney - Customer
8 Chimney Top Daimeter 1200 1500 Meter (Client Scope)
Scope) Scope
Existing Chimney - Customer
9 Chimney Height 31 meters 32 MTR 30 Meter (Client Scope)
Scope
10 Safeties and Controls Considered YES
As per CBL Standard
11 Controls YES Considered
considered
12 Steam Pressure Control Considered YES Yes Considered
13 Furnace Draft Control Considered YES Yes Considered
14 Steam Pressure High Considered YES Yes Considered
15 Steam Pressure Very High Considered YES Considered
16 Steam Pressure Higher than SVLOP Considered YES Yes Considered
17 Water level Low/ High in Shell Considered YES Yes Considered
18 Water level very Low in Shell Considered YES Yes Considered
19 Water level Extreme Low in Shell Considered YES NA Considered
20 Deaerator Tank level low/High Considered YES Yes Considered
21 Flue gas temperature at Boiler outlet high Considered YES

As per the dicussion had


Other details required Earlier Existing chimney shall
be used.
1 Calculation for chimney ht. and diameter Post Ordering stage
2 Building civil and other foundation drawings Only Load Data will be
provided
3 Motors Post Ordering stage CG / EQUIVALENT
27/12/23 27/12/23 27/12/23
THERMAX CBL TRIVENI TRIVENI
Sr. No. Item Description Qty. Price INR Lakhs Price (INR Lakhs) Price (INR Lakhs) Price (INR Lakhs)

Pressure parts consisting of:


• Shell and smoke tubes assembly with necessary opening for valves, mountings, smoke
chamber;
• Membrane panel – Water wall for furnace enclosure.
• Risers & down Comers.
1 1 Set 357.13 170 170
• Base frame for boiler MPA and shell support
• Insulation for the pressure parts
• Tube cleaning system at front and rear side of shell for effective tube cleaning.
• Water jacketed ash Screw provided in MPA for auto ash removal.
Combustor System
• Reciprocating grate assembly consisting of grate housing, grate bars, supporting bars, grate
carrier, bearing & end supports.
• Hydraulic drive consisting of pump, fluid sump, cooling air fan along with solenoid valve
operated control arrangement & limit switches.
2 1 Set Included in Sr. No. 1 45 45
• Screw feeders along with geared motor for fuel feeding along with service hopper
• Temperature based fire extinguish system consisting of cooling water arrangement,
temperature sensor, pneumatically actuated valve / mechanically operated valve (standby).
• Primary & secondary air dampers with electrically operated controlled actuator Note:
- Furnace combustor shall be placed on civil support with platform above + 1.5 m from ground level.
Pressurized Economizer – Integral Type:
• Tube coil assembly
• Inlet & outlet headers
• Casing with stiffeners 232.2
3 1 Set Included in Sr. No. 1 15 15
• Access doors assemblies
• Coil support
• Rotary retractable soot blower for effective cleaning.
• Bypass line in flue gas and water side.
Forced Draft (FD) Fan Assembly: Primary & Secondary We have considered We have considered
VFD so no need for VFD so no need for
• One primary FD fan with electric motor and electrically actuated dampers at the outlet of Actuator Actuator
4 primary FD fan with manual damper at suction of FD fan. 1 Set Included in Sr. No. 1
• One secondary FD fan with electric motor electrically actuated dampers at the outlet of
secondary FD fan with manual damper at suction of FD fan.
Induced Draft (ID) Fan Assembly:
5 1 Set
 Centrifugal fan along with VFD operated electrical motor, coupling, belt drive, base frame etc.
INCLUDED IN BOILER INCLUDED IN BOILER
Feed water system Consisting of:
6 1 Set
Centrifugal feed water pumps (1 W + 1 SB) with drive motors and base frame, duly assembled conditions
Included in Sr. No. 1
Integral feed water piping Consisting of:
7 1 Set
Piping from feed water pump discharge to boiler feed water inlet.
2.5 2.5
Necessary Valves ,Instrumentation, mounting & Fittings for safe working of boiler
8 1 Set

POLLUTION CONTROL EQUIPMENT – CYCLOMAX Not Applicable


• Cyclomax consisting of cyclones for dust separation.
9 1 Set INCLUDED IN BOILER INCLUDED IN BOILER
• Hopper with RAV for ash collection.
THERMAX CBL TRIVENI TRIVENI
Sr. 9No. Item Description 1Qty.
Set Price INR Lakhs Price (INR Lakhs) INCLUDED
Price (INRINLakhs)
BOILER INCLUDED
Price (INRINLakhs)
BOILER

• Structural support for Cyclomax.


POLLUTION CONTROL EQUIPMENT – ESP
• Inlet cum bypass damper assembly;
10 • Necessary instruments & control for ESP operation; 1 Set 182.07 180 95 95
• Ash hopper with RAV below flue gas chamber for ash collection;
casing., Structure, platforms, etc
COMBUSTION CONTROL SYSTEM: Included in Sr. No. 1
• Main steam pressure transmitter & Main steam pressure indicator
11 1 Set 5.5 INCLUDED IN BOILER INCLUDED IN BOILER
• Grate modulation
• Combustion air adjustment
DRAFT CONTROL SYSTEM: Included in Sr. No. 1
• Furnace pressure transmitter with controller
12 • VFD for Induced Draft Fan control 1 Set 4.5 INCLUDED IN BOILER INCLUDED IN BOILER
• Isolation valve
• Flexible hose
CONTROL SYSTEM Included in Sr. No. 1
13 INCLUDED INCLUDED
Sequence controller with pre-programmed logic shall be mounted on boiler
Single element drum level control system: Included in Sr. No. 1
14 1 Set 4.5 5.5 5.5
Consisting of necessary control valves & instruments
Automatic Blow down System 4.55
15 • Surface type 1 Set 4 2.5 2.5
• Conductivity base
O2 ANALYSER 3.64
16 • Zirconium based 1 Set 4 8 8
• Logic in PLC to facilitate Oxygen trimming
Boiler Water flow meter (Vortex Type) 3.64
17 1 Set 2 2.5 2.5
Orifice type flow meter with transmitter
NON-COMPARTMENTALIZED POWER CUM PLC BASED CONTROL PANEL WITH SCADA OPERATING Included in Sr. No. 1
STATION CONSTRUCTION:

Free standing type, Form -1, conforming to IP 42 degree of protection. The panel shall be made out of 14/16
SWG CRCA sheets. Gland plate - 3 mm thk, Front access, Fixed type, Powder coated to RAL7032/7035,
Mounting plate - RAL 2000.
- Max height - 2100 mm, Plinth - 100 mm, Cable entry - Top/Bottom as per Control room layout.
- Earthing - GI/Aluminium, Brass bolt.
- Bus bar MOC - Aluminium.
Power section :
Switchgear Short circuit rating
- Incomer - MCCB with SC & OL protection with multifunction meter.
18 - Motor feeder - DOL, S/D, VFD feeders as applicable for motors ( supplied items), breaker - 1 Set 17.5 30 30
MCB/MPCB with SC & OL + Contactor / MCCB with SC protection + Contactor + Thermal overload relay.
- On/Off Indication LED Lamps and Start/Stop.
- Internal Wiring - Cu cond., PVC/XLPE Insulated, min 2.5 Sq.mm power and min 1.0 Sq.mm for
control.
Control section :
18 1 Set 17.5 30 30

THERMAX CBL TRIVENI TRIVENI


Sr. No. Item Description Qty. Price INR Lakhs Price (INR Lakhs) Price (INR Lakhs) Price (INR Lakhs)

- Programmable logic controller with non-redundant configuration.


- 16/32 channel density digital input/output cards with channel to base plate isolation.
- 4/8 channel density analog input/output cards with channel to base plate isolation.
- Communication from PLC to IO racks / SCADA on Ethernet/Profibus/Canbus.
- 10% spare IO's are considered.
- Operating SCADA shall be commercial grade PC based ,OS windows latest, i5 intel ,1TB HDD ,
4GB RAM ,21" monitor with SCADA runtime license , MS office license and Antivirus license .

Scope of supply for BOP system


Combustion air ducting – 4 mm 23.52
• From FD fan outlet to combustor
19 1 Set
• Secondary air ducting
• Expansion bellows / isolation dampers
Flue gas ducting – 5 mm Included in Sr. No. 19
13 18 18
• Boiler Outlet to Inlet to HRU
• HRU outlet to PCE inlet
20 1 Set
• PCE outlet to ID fan inlet
• Expansion bellows / isolation dampers
Flue Gas Ducting from ID Fan Outlet to Existing Chimney Inlet
Insulation 1 Set 51.37

• Mineral wool of 100 – 120 kg/m3 density, Aluminum cladding of 22 (For bigger sections (>1000
mm) and 24 (For smaller sections, < 1000 mm) SWG thickness. Insulation shall be provided for
following surfaces.
• Flue gas ducting
21 11 25 25
• Pressure Parts
• Heat recovery units
• ID Fan
• Piping & Tank as shown in PID

Set of Refractory Included in Sr. No. 21


• Castable refractory;
• Insulating Castable;
22 1 Set 13.5 20 20
• Air setting mortar;
• Mill board;
• Support anchors etc.
ASH HANDLING SYSTEM (MECHANICAL TYPE) BED ASH HANDLING: 112.25

• Bed ash Temperature sensor for maintaining level of ash in ash hopper  Bed ash water 25 25
jacketed screw for removal of ash from grate. 11
• Bed Ash conveyor + transfer conveyor for dry ash conveying directly into ash trolley.
• Cooling tank with pump and piping shall be done by customer for bed ash water recirculation.
23 (However tank location shall be within boiler house premised and structure for tank shall be in civil 1 Set Client scope
min 3 m height)
FLY ASH HANDLING:

10 10

70
23 1 Set THERMAX CBL TRIVENI TRIVENI
Sr. No. Item Description Qty. Price INR Lakhs Price (INR Lakhs) Price (INR Lakhs) Price (INR Lakhs)

• Fly ash screw below RAV hopper for Eco & PCE;
10 10
• Interconnecting screw/conveyor set to convey fly ash conveying.
• Bucket elevator
70
Ash silo-15 m3

- Stationary grates are provided at the reciprocating grate above ash screw for stopping the
clinker falling over ash screw ( of size more than 80 MM ), two doors are provided at the sides to 6 6
remove those clinkers manually )
Civil trench required for bed ash screw Client scope
Pit and pit cover and barricading for pit if any required Client scope

Piping (Water /Steam/ Drain / Blow-Down / Vent)  Feed water piping from boiler feed pump to boiler 93.65 INCLUDED INCLUDED
inlet.
24 • Spill back line from pump outlet to deaerator inlet. 1 Set 2
• Steam piping upto MSSV. INCLUDED INCLUDED
• Blow down piping from individual points below equipment drain to blowdown pit (civil)
Structural support 1 Set Included in Sr. No. 24
- Platforms with ladder for Shell, HRU and PCE
- Structural support for ducting
Structural supports for the accessories like HRUs & PCEs
25 25.33
Civil structure and platform for furnace up to FFL & shell supporting columns 17 17
- Access platforms are provided for the points where daily access is required. For other point
for maintenance, access to be made with temporary arrangements.
All the primary support elements viz. truss members of steel / concrete, pipe rack etc
Painting 9.75 2.5 2.5
26 • One coat of red oxide for items fabricated at site. 1 Set
2.5
• One final coat Painting shall be as per standard

27 First fill lubricants & boil out chemicals 1 Set Included in Sr. No. 26 included in the sr.no:26

28 Unloading, Shifting, Positioning And Installation of supplied equipment & 1 Set INCLUDED INCLUDED
195.08
Scope of installation & commissioning: 35 35
29 1 Set
- Installation of the supplied equipment & accessories
- Site Visits 6 6
- For pre-installation check
- For inspection after receipt of unit at site 75
- For supervision during assembly
- Commissioning of Boiler
30
- Safety officer during installation and commissioning of boiler.
IBR Approval up to provisional firing Order (Preparation and submission of all required documents for getting
the boiler registered. All formalities to be done at site towards registration of boiler with local IBR office
includes open inspection, hydro test and getting provisional order firing .

Transportation & Transit insurance, GST & Site storage insurance Client scope Client scope Client scope
Scope of Engineering Included in above Sr. Nos.

31 1 Set INCLUDED IN BOILER INCLUDED IN BOILER


THERMAX CBL TRIVENI TRIVENI
Sr. No. Item Description Qty. Price INR Lakhs Price (INR Lakhs) Price (INR Lakhs) Price (INR Lakhs)

Drawing / Documents Reference (1 Hard & 1 Soft Copy of each) General: CBL
- Civil Foundation loading Drawing (not foundation design); CBL
- Piping & Instrumentation Diagram; CBL
31 - General Arrangement & Terminal Point Drawing; 1 Set CBL INCLUDED IN BOILER INCLUDED IN BOILER
- Refractory Drawing; CBL
- Electrical Wiring Drawing; CBL
- Operation & Maintenance Manual CBL
- Cable schedule CBL
32 FUEL HANDLING SYSTEM:
Bunker with Bottom screw arrangements 10
System configuration: Briquettes: Grizzly Hopper + Belt Conveyer+ Crusher+ Common Bucket 38
Elevator+ Bunker. Wood: Inlet of Chipper+ Belt conveyer+ Common Bucket Elevator + Common 208.80 70
Bunker.

• Skip Charger
• Storage Silo 1 Set 18
• Pusher to transfer directly into the Furnace
33 WOOD CHIP CRUSHER: 1 Set 15
34 RCC CHIMNEY:
32 MTR Height x 1200 MM Top Dia 1 Set
Total 1,245.4 757.53 578.5 573.5
27/12/23
IBL
Price in Lac

222

40.2

20.00

Included in Part of boiler


Sr. No 1

15.00
IBL
Price in Lac

RS114/-kg

150

RS114/-kg

10.00

5.00

4.00

6.00

6.00

5.00

30.00
30.00

IBL
Price in Lac

16

5.1

Total 400 sqrmtr

24

After Layout finalisation


IBL
Price in Lac

After Layout finalisation

6.9

Rs114/-kg

25.08

at finalisation

Client

Client

37.5

Client scope
IBL
Price in Lac

OK
OK
OK
OK
OK
OK
OK

11.55

639.33