You are on page 1of 2

Construction of 6 Lane access controlled Greenfield highway from Km. 97.000 to Km 125.

000 of Deogarh (near Dhandhaniya)-


Rajasthan/Gujarat Border Section of NH-754k as a part of Amritsar - Jamnagar Economic Corridor in the State of Rajasthan on
EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-5)

Client : : National Highways Authority of India

Authority's Engineer : : M/s. Chaitanya Projects Consultancy Pvt. Ltd. In JV With Dhruv Consultancy Service Ltd.

Name of EPC Contractor : : M/s. NG Projects Limited

COMPRESSIVE STRENGTH OF CEMENT CONCRETE CUBE (IS : 516-2018)


DATE OF TESTING : 19.04.2021

Dimension Comp. Avg. Comp. Strength


Sr. Date of Structure / Location ID Mark Grade of Age / Days Weight Comp. Load Strength
No. Casting Concrete cm (gm) (KN) (N/mm2)
L× B× D (N/mm2)

1 1 M-30 7 15 x 15 x 15 8862 770 34.22


2 2 M-30 7 15 x 15 x 15 8725 795 35.33 34.15
3 3 M-30 7 15 x 15 x 15 8660 740 32.89
4 4 M-30 7 15 x 15 x 15 8720 780 34.67
5 12.04.2021 Cement Concrete Mix Design 5 M-30 7 15 x 15 x 15 8675 790 35.11 35.26
Trial Mix- 65
6 6 M-30 7 15 x 15 x 15 8710 810 36.00
7 7 M-30 7 15 x 15 x 15 8625 785 34.89
8 8 M-30 7 15 x 15 x 15 8620 790 35.11 35.13
9 9 M-30 7 15 x 15 x 15 8750 796 35.38

Avg :- 34.84

REMARKS : ___________________________________________________________________________________________________________
EPC Contractor's Representative Client / AE's Representative

You might also like