You are on page 1of 2

MOVENTO > For more information visit

youtube.com/bluminc

Installer’s Guide
For detailed videos visit
youtube.com/bluminc
Dimensions in millimeters (inch equivalents as noted) – Technical
specifications subject to change without notice For more information
about installing Blum products, please visit blum.com or call
1-800-438-6788 for customer service. © 2018 Blum, Inc.

Step 1 ­ Step 2 ­ Step 3 ­

First, touch to open drawer. With the drawer fully Carefully remove the synchronization rod. Repeat these
extended, reach under the steps on the remaining drawers.
drawer and squeeze the
release levers for the
locking devices. Then pull Visit youtube.com/bluminc for more information on how to remove the
drawer straight out. TIP-ON BLUMOTION synchronization rod video.

Step 4 Step 5

- +
part no. 65.5632.US

Now install the cabinet, ensuring that the cabinet remains Next, use the orange front gap template to ensure the
square and true. front gap is set correctly for optimal function of TIP-ON
BLUMOTION.

For proper function, it is important that the cabinet does not become Visit youtube.com/bluminc to watch the TIP-ON BLUMOTION front gap
racked during installation. template video.

Step 6 Step 7 Step 8 Additional instructions -->

Touch to extend the right Insert the synchronization Insert the drawer. Repeat this process for
and left runner. rod. the other drawers in the
cabinet.
Front side-to-side adj Rear side-to-side adj Front height adj Rear tilt adj
Drawer adjustments

Rotate side-to-side adjustment left or right Rotate the rear To raise front - Press To raise drawer
equally on both locking devices. Drawer side-to-side up on adjustment back/tilt front - Rotate
front moves in the same direction as adjustment left or right to tab and push toward gray tilt adjustment
rotation. re-align the back of the back of drawer. lever on the rear of
drawer box with the front. each runner.

Level Square Rear notch


Troubleshooting

Check to ensure that the runners are Check drawer box squareness, Measure the rear notches of the
level, perpendicular to the face of the either by measuring from inside drawer. Make sure they meet Blum’s
cabinet, and parallel to each other. corner to inside corner, or by using a specifications.
framing square.
View TIP-ON BLUMOTION section of
MOVENTO brochure for further instructions.

­Closed Open Broken synchronization adapter


Helpful hints

To remove or insert the If a synchronization adapter is broken, it can easily be replaced by simply
synchronization rod, the pinions sliding another in its place.
must be put in the open position
by touching the drawer front or
runners to open them.

TIP-ON BLUMOTION depth adjustment with a combination square


Top view
Front gap template alternative

Cabinet face
Runner setback
Combination square

+
-

x -1

763/769 (X = runner setback + 32 (1-1/4")) +


2
769R (X = runner setback + 17.5 (11/16"))

If a front gap template is not present on the job site, a combination square can be used to set the
front gap. Please refer to the MOVENTO brochure for more information.

You might also like