QUESTION: Question from Laura Kuhn HITT Contracting, Inc. on Tuesday, May 25, 2021 at 10:27 AM EDT
Per the attached correspondence from March 2020, elevation 0'-0" noted in the Contract Documents
equates to 15.00'
DCDPW -- please confirm.
SUGGESTION:
ANSWER:
Response (Answered) from: Carmen Chan (Perkins Eastman DC)
Remarks:
PEDC RESPONSE:
THE PROJECT ELEVATION AT 0'-0" IS CONFIRMED TO EQUAL 15.00' DC DPW. FOR REFERENCE,
THE BUILDING HEIGHT MEASURING POINT AS INDICATED IN THE CONTRACT DOCUMENTS AT
PROJECT ELEVATION 1'-8" IS EQUAL TO 16.67' DC DPW.
C.CHAN / 05.25.2021