You are on page 1of 6

B2 BATCH I 22 DAYS TRAINING GRP I

MODULE -5 - Digital Techniques, Electronic Instrument System- 17 hours


CAR 66 Ref. Date Practical/ Task Hours
MODULE 5/5.1 16/09/2021 Electronic Instrument Systems 01
(1HR) - Perform Checking of the Electronic Instrument and Data
Failure Warning in Cockpit.
MODULE 5/5.15 16/09/2021 Typical Electronic/Digital Aircraft Systems
(5HRS) - Explain the Aircraft EFIS, EICAS/ECAM, System Display in 02
Cockpit.
- Perform Checks in the Aircraft ACARS-ARINC Communication 02
and Addressing and Reporting System.
- Perform Running of BITE TEST on typical electronic/digital 02
aircraft system.
17/09/2021 - Assist in initialization check performance on inertial reference 02
(6HRS) unit/platform.
- Familiarize the Aircraft Fly by Wire System. 02
- System test of Integrated modular avionics (if IMA available: 02
Run a system test)
- Functional Test of Cabin system (if CS available: Run a function 02
18/09/2021 test)
(5HRS) - System test of Information System (If IS available Run the 02
System Test)
TOTAL 17
Module 13 Part –II-Aircraft Aerodynamics, Structures and Systems-33 hours
CAR 66 Ref. Date Practical/ Task Hours

MODULE 18/09/2021 Instruments (ATA 31) 12


13/13.8 (1HR) -- Checks of the insulation resistance of the pitot probe heater-
01 hrs
- Perform Pitot and Static Maintenance Check.-03 hrs
20/09/2021 - Carry out the Inspection, and Calibration check of Altimeter,
(6HRS) ASI, VSI, Mach meter.- 03 hrs
- Inspection of the Altitude Reporting System.- 0.5 hrs
- Perform the Operating Module and Function of Central Air
Data Computer.- 01
21/09/2021 - Inspection of the fuel quantity indicating system .- 0.5 hrs
(5HRS) - Operational check of central warning system.- 01 hrs
- Familiarize with the Aircraft Glass Cockpit.- 02 hrs
MODULE 21/09/2021 Lights (ATA 33) 05
13/13.9 (1HR) - Operational check of Emergency Light.-01 hrs

- Inspection & Replacement of Navigation, Landing, Taxing &


22/09/2021 Ice Inspection Lights.-02 hrs
(4HRS) - Replacement & Testing of Aircraft Internal lights. (Cabin,
Cockpit, cargo)-02 hrs

1
B2 BATCH I 22 DAYS TRAINING GRP I

MODULE 22/09/2021 Communication/Navigation (ATA 23/34) 16


13/13.4 (2HRS) - Familiarize with Instrument landing system and Check the
mode of Operation in Cockpit display.-02 hrs
- Familiarize with BITE tests on selected navigation systems
23/09/2021 (VOR, ADF, LOC/GS, Marker, DME, Radio Altimeter, TCAS,
(6HRS) GPWS, ATC, GPS)- 04 hrs
- ADF / DME system unit Demonstration of functional test.-01
hrs
- Perform and intercom or passenger address unit replacement
and testing.-01 hrs
- Demonstration of typical maintenance practices on flight
24/09/2021 director system.-01 hrs
(6HRS) - Familiarize with the operation test of GPS/GNSS.-01 hrs
- Carry out the BITE test & typical maintenance practices on
flight management system.-01 hrs
- Discuss check on inertial reference unit/platform.-01 hrs
- Familiarize with the operation and function of ATC
Transponder & Secondary surveillance Radar.-01 hrs
- Describe the of typical ARNIC communication and reporting
system.-01 hrs
25/09/2021 -Installation and removal LRU from aircraft racks, checks on
(2HRS) power supplies, and remote controls.-02 hrs

TOTAL 33

Module 13 Part –III-Aircraft Aerodynamics, Structures and Systems-55 hours


CAR 66 Ref. Date Practical/ Task Hours

MODULE Integrated Modular Avionics (ATA 42) 03


13/13.20 25/09/2021 - Familiarize with the Operation and Function of Typical
(3HRS) Integrated Modular Avionics system.-02 hrs
- Integrated modular avionics (if IMA available : Run a system
test)-01 hrs
MODULE 25/09/2021 Cabin System (ATA 44) 03
13/13.21 (1HR) - Carry out the operation and System Function of Cabin
Intercommunication Interface data System, (Inflight
27/09/2021 Entertainment System, Cabin Monitoring System,)-02 hrs
(2HRS) - Cabin System (Run the Test)-01 hrs

MODULE 27/09/2021 Instruments (ATA 31) 10


13/13.8 (4HRS) - Perform the Inspection of Turn & Slip Indicator/Turn
Cocoordinator.-01 hrs
- Familiarize with the Aircraft Artificial Horizon.-01 hrs
- Operational Check of GPWS Ground Self-Test System.-01 hrs
- Installation, removal and inspection of flight data recorder in
aircraft.- 01 hrs

2
B2 BATCH I 22 DAYS TRAINING GRP I

- Familiarize with Operation check of the standby compass


28/09/2021 including light test and visual inspection.-02 hrs
(6HRS) - Operational check of ULB of DFDR system interconnection.-01
hrs
- Operational check of EFIS (Electronic Flight Instrument System)
& functional test on aircraft.-01 hrs
- Familiarize with of Operational check of Central / Master
Warning System.-01 hrs
- Identify Angle of attack Probe location.- 30 min.
- Describe Vibration measurement and Indication- 30 min.
MODULE 29/09/2021 AUTO FLIGHT (ATA 22) 08
13/13.3 (6HRS) - Familiarize with Operational Check of Auto Flight System.-02
hrs
- Auto flight modes of operation & failure in cockpit.-03 hrs
- Operation and inspection of Yaw Damper- 01 hour
30/09/2021 - General auto throttle systems Layout and functional testing-02
(2HRS) hrs

MODULE 30/09/2021 Information System (ATA 46) 04


13/13.22 (4HRS) - Familiarize with of Operation and Function of Cabin
Information system,
Passenger Information System,
Maintenance Information System.
MODULE 01/10/2021 Electrical Power (ATA 24) 04
13/13.5 (4HRS) - Batteries Installation and Operation:
- Familiarize with safety precaution and safety measures
required while Installation and operation on Aircraft batteries.-
30 min.
- Carry out the Charging of Nickel Cadmium Battery.- 30 min
- Deep Cycling of Nickel Cadmium Battery.-01 hour
- Perform the Capacity Testing of Ni-Cad Batteries.-01 hour
- Installation of Battery in the Aircraft.-01 hour
MODULE 01/10/2021 DC power generation: 04
13/13.5 (2HRS) - Familiarize with the operation and function of DC generator
used in Aircraft.-02 hrs
04/10/2021 - Carry out the operation and Function of DC power generation
(2HRS) switching in Aircraft.-02 hrs

MODULE 04/10/2021 AC power generation: 4.5


13/13.5 (4HRS) - Familiarize with the Operation and Inspection of AC generator
used in Aircraft.-01 hour
- Operational check of AC emergency Generation System.-01
hour
- Functional check of IDG / Alternator.-30 min
- Inspection of generator power check / voltage adjustment.- 1
05/10/2021 hour
(0.5HR) - Operational Check of AC ESS Generation switching.- 1 hour

3
B2 BATCH I 22 DAYS TRAINING GRP I

MODULE 05/10/2021 Power Distribution: 03


13/13.5 (3HRS) - Functional Check of Main and Essential Bus bars.-01 hour
- Familiarize with the Operation and inspection of Rotary and
Static Inverters.-01 hour
- Bus bar and Parallel Bus bar System.-01 hour
MODULE 05/10/2021 Circuit Protection 03
13/13.5 (2.5HRS) - Perform the operational check Opening and closing of Circuit
06/10/2021 Breaker (CB).-1.5 hrs
(0.5HR) - Identify the Location of Circuit breakers of Various Aircraft
System.-1.5 hrs
MODULE 06/10/2021 Fire Protection (ATA 26) 03
13/13.12 (3HRS) - Carry out the Operation and inspection of Fire detection and
Warning System.- 30 min
- Familiarize with the Operation and inspection of Smoke
detection and Warning System.- 30 min
- Cleaning smoke detector in avionics and cargo compartment.-
1 hour
- Inspection of on-board testing of fire protection system.- 1
hour
MODULE 06/10/2021 Ice and Rain Protection (ATA 30) 2.5
13/13.15 (2.5HRS) - Functional check of the insulation resistance test of pitot probe
heater.- 30 min
- Operational test of the pitot-probe ice protection.-30 min
- function test of Electrical Heating System.- 1 hour
- Operational test of the TAT ice protection.-30 min
MODULE 07/10/2021 Air Conditioning and Cabin Pressurization (ATA 21)
13/13.11 (1HR) - Cleaning of cabin sensor duct and temperature sensor.- 30 min 01
- Assist in operational check of Zone Controller/ ACSC (BACK UP
SWITCHING) VIA CFDS/MCDU- 30 min
MODULE 07/10/2021 Fuel System (ATA 28) 02
13/13.13 (2HRS) - Identify the Indication and Warning of Fuel quantity in
Cockpit.- 1 hour
- Perform the Fuel Quantity Indicating system test.- 1 hour
TOTAL 55
Module 14 Part –II- Propulsion- 03 hours
CAR 66 Ref. Practical/ Task Hours
MODULE 07/10/2021 Starting and Ignition Systems 02
14/14.3 (2HRS) - Familiarize with the test of the ignition system.- 1 hour
- Carry out the inspection and installation of H.T. leads and
ignition lead.- 1 hour
MODULE 07/10/2021 Engine Indicating Systems 01
14/14.2 (1HR) - Perform the test on Engine Indicating System.- 15 min
- Operation & Function the Engine RPM Indicator and
Tachogenerator.- 30 min
- Check the Engine Instrument Indication and Failure Warning
System in Cockpit.- 15 min
TOTAL 03

4
B2 BATCH I 22 DAYS TRAINING GRP I

MODULE -5 - Digital Techniques, Electronic Instrument System- 17 hours


Module 13 Part –II-Aircraft Aerodynamics, Structures and Systems- 33 hours
Module 13 Part –III-Aircraft Aerodynamics, Structures and Systems- 55 hours
Module 14 Part –II- Propulsion- 03 hours
TOTAL 108
hours
MECHANICAL TOPICS -18 HOURS
Module 14 Part –II- Propulsion- 03 hours
CAR 66 Ref. Date Practical/ Task Hours
MODULE 14/14.2 08/10/2021 Engine Indicating Systems 01
(1HR) - Check the Engine Instrument in Cockpit for Oil/Fuel
Temperature, Pressure, & Fuel flow.- 30 min
- Assist in Replacement of Igniter plug and Check function.- 30
min
MODULE 14/14.3 08/10/2021 Starting and Ignition Systems 02
(2HRS) - Familiarize with the Type of Starter Used in Aircraft.- 1 hour
- Perform the inspection of ignitors.- 1 hour

Module 13 Part –III-Aircraft Aerodynamics, Structures and Systems- 15 hours


MODULE 13/13.5 08/10/2021 External Ground Power: 04
(3 HRS) - Perform the Functioning & Inspection of Auxiliary power
unit.-01 hr
- Maintenance of Auxiliary power unit.- 02 hours
09/10/2021 - Familiarize with the procedure for Connecting and Use of
(1 HR) External / Electrical Ground Power Supply Unit.-01 hr
MODULE 09/10/2021 Air Conditioning and Cabin Pressurization (ATA 21)
13/13.11 (4 HRS) - Familiarize with the different sources of air-supply, including 04
Engine bleed, APU and Ground Cart. – 30 min.
- General visual inspection of riser ducts in the passenger
compartment. - 30 min.
- Assist in Operational check of override function (blower and
extract)- 30 min
- Assist in Operational check of air inlet check valve.- 30 min
- General visual inspection of lavatory and galley ventilation
ducting.- 01 hour
- Familiarize with the operation of air-conditioning system- 30
min
- General visual inspection of Air conditioning compartment
and fairings.- 30 min
MODULE 09/10/2021 FIRE PROTECTION- ATA 26 01
13/13.12 (1HR) - Remove portable fire extinguisher for weight check and
check nozzle for leakage or discharge.- 1 hour
MODULE 11/10/2021 Ice and Rain Protection (ATA 30) 02
13/13.15 (2HRS) - Familiarize with the Function & Inspection of Anti Icing and
De Icing system.-30 min
- Operational test of wing ice protection system.- 30 min

5
B2 BATCH I 22 DAYS TRAINING GRP I

- Assistance to the operational test of the engine air intake ice


protection.-1 hour
MODULE 11/10/2021 Fuel System (ATA 28) 04
13/13.13 (1HR) - Carry out the operation, function & inspection of: filters,
booster pumps, tanks selector valve.- 1 hour
11/10/2021 - Assist in operational check of cross feed valve using
(3HRS) individual motors and check fuel flow in "open" and fuel off in
"closed" positions- 2 hours
- Familiarize with the Procedure of Refueling and Defueling
and Familiarize with Refueling/Defueling Panel.- 1 hour
TOTAL 15

Module 14 Part –II- Propulsion- 03 hours


Module 13 Part –III-Aircraft Aerodynamics, Structures and Systems 15 hours
TOTAL 18 hours

MODULE -5 - Digital Techniques, Electronic Instrument System- 17 hours


MODULE 13 PART –II-Aircraft Aerodynamics, Structures and Systems- 33 hours
MODULE 13 PART –III-Aircraft Aerodynamics, Structures and Systems- 70 hours
MODULE 14 PART –II- Propulsion- 06 hours
TOTAL 126 hours