Issue Effective Date

Module 13: AIRCRAFT Original Issue 14th July 2018


AERODYNAMICS, STRUCTURES & Rev. No. Rev. Date
SYSTEMS 00 dd/mm/yyyy

Practical Procedures
Date of
Module: Module 14: Propulsion
Issue 14th July 2018
Category: B2
Task Ref.
14.2
Task: Removal/installation of Engine synchronizer No.
Level: 3
Reference
Procedure AMM/ Any
No.
M14/PPS/002 repair PPM M14-02
Manual
Location Aircraft/Workshop/ Laboratories Hours 05:00 Hours
Component
Aircraft/
Hawker HS 125-700 Type (if
Engine Type Not Applicable
applicable)
Students shall be able to develop their skills on Removal/installation
Skill Set: Checked
of Engine Synchronizer
Tools Common Screw Driver, Spanner, Wire Cutter
Required:
Consumable Thiokol, Cleaning fluid and Aluminium wool.
required:
Draw the recommended documents or procedure sheets.
Pre-Task Draw required tools and equipment.
procedure
Draw required consumables.
Cautions/ Refer Chapter 24, ELECTRICAL POWER- GENERAL
Precautions
A. Removal.

1. Isolate electrical power supplies to synchronizer.

2. Remove electrical connector from the synchronizer located on


the fuselage keel just aft of the fuselage rear equipment bay
door.
Task
Procedure 3. Remove the four bolts and distant pieces securing the
synchronizer to its panel and remove the synchronizer.

B. Installation.

1. Clean mating faces of the synchronizer feet, distant pieces,


bonding strap and terminal lug on bonding lead.

2. Attach synchronizer to panel making sure the bonding strap is


sandwiched firmly between distant pieces and mounting feet,
and terminal lug bonding lead is assembled under bolt head.

3. Tighten all bolts and coat bolt head and terminal lug with
sealant. The measured resistance between synchronizer and
Issue Effective Date
Module 13: AIRCRAFT Original Issue 14th July 2018
AERODYNAMICS, STRUCTURES & Rev. No. Rev. Date
SYSTEMS 00 dd/mm/yyyy

bonding strap should not be more than 0.025 ohms.

4. Connect the electrical connectors to the synchronizer and wire


lock.

5. Restore electrical power supplies to the synchronizer.

6. Ground test installation (Refer to CHAPTER 71-00-00,


Adjustment/test).

All tools and equipment are placed back/ returned.


Post-Task
Report any findings during task.
Inspection
All documentations/ entries are completed.