Professional Documents
Culture Documents
Practical Procedures
Date of
Module: Module 14: Propulsion
Issue 14th July 2018
Category: B2
Task Ref.
14.2
Task: Removal/installation of Engine synchronizer No.
Level: 3
Reference
Procedure AMM/ Any
No.
M14/PPS/002 repair PPM M14-02
Manual
Location Aircraft/Workshop/ Laboratories Hours 05:00 Hours
Component
Aircraft/
Hawker HS 125-700 Type (if
Engine Type Not Applicable
applicable)
Students shall be able to develop their skills on Removal/installation
Skill Set: Checked
of Engine Synchronizer
Tools Common Screw Driver, Spanner, Wire Cutter
Required:
Consumable Thiokol, Cleaning fluid and Aluminium wool.
required:
Draw the recommended documents or procedure sheets.
Pre-Task Draw required tools and equipment.
procedure
Draw required consumables.
Cautions/ Refer Chapter 24, ELECTRICAL POWER- GENERAL
Precautions
A. Removal.
B. Installation.
3. Tighten all bolts and coat bolt head and terminal lug with
sealant. The measured resistance between synchronizer and
Issue Effective Date
Module 13: AIRCRAFT Original Issue 14th July 2018
AERODYNAMICS, STRUCTURES & Rev. No. Rev. Date
SYSTEMS 00 dd/mm/yyyy
Signature Signature