U & I TECHNOLOGIES SDN. BHD.

THE PROPOSAL FOR A 20 KM PIPE REPLACEMENT

FOR THE RESIDENTS OF KAMPUNG PADANG,

KUANTAN, PAHANG.

TECHNICAL REPORT
Environmental Impact on the Proposed 20 km Pipe Replacement for the
Residents of Kampung Padang, Kuantan, Pahang.
Prepared by: U & I Technologies Sdn Bhd

Abstract

This technical report present the risk assessment of the environemnt impact associated with the
proposal construction project of 20 km pipe replacement for the residents of Kampung Padang in
Kuantan. The risk identification process involved the assessment of all project activities
alignated to the environmental aspects. Upon the identification of potential risk, evaluation were
assigned and appropriate risk mitigation process were conducted. Thus, U & I Technologies Sdn
Bhd adapt the method of Risk Assessment and Risk Control (HIRARC) in environmental risk
evaluation.

Introduction

Water distribution network is a network station and the distribution storage.


consisting of pipes, valves and pumps that Branches have a diameter ranging from 75
distribute water to the end users. In water mm to 150 mm, but of the same length with
distribution some components are made the mains. They carry water from the mains
redundant which makes water supply failure to various terminals. Terminals also have the
not to be noticed immediately when pipe same length as others but have a diameter
failure occurs. Pipes are of different types ranging from 25 mm to 50 mm. They are
and sizes. In this paper, our interest is on called service lines in the network. The
three types of pipes namely: terminals convey water to the end-users and
they are the smallest in size but the largest in
1) Asbestos-concrete (AC) pipes, number.
2) Unplastisized polyvinyl chloride (UPVC) The major problems of the GVI pipes are
or plastic pipes and bulkiness, rusting and expensiveness
3) Galvanized Iron pipes (GVI). compared to the other two types. Majority of
their failure result from rusting. UPVC is
These pipes are further divided into mains, fast replacing GVI pipes because of their
branches and terminals. Mains are of portability and durability. Many factors are
different lengths and diameters ranging from responsible for water pipe breaks. For the
13 ft to 20 ft and 200 mm to 600 mm. They purpose of this paper, these factors are
carry water directly from the pumping divided into internal and external factors.

Internal factors: Internal factors include the water treatment; the diameter of the pipes
pressure exerted by the flowing water in the and the intrinsic material of the pipes etc.
pipe; the action of chemicals used in the Pressure exerted by water over a long period
of time on pipes leads to their break and this strength and experience in the industry, and
pressure is inversely related to the diameter strategy to manage the project.
of pipes. The pressure is also intensified, as
the pipes are located nearer to the source and
reduces as the length of the pipes increases. VISION
External factors: External factors include the To be the preferred engineering and
soil type, topography, lay-dept, shock and construction group in Malaysia
rust. These factors are called external
because they occur outside the pipes. The
nature of soil in which the pipe is laid MISSION
determines the rate of pipe’s break etc. The
To be compretitive and at the forefront of
rates at which these factors occur influence
the industry transformation by:
the maintenance decisions.
 Offering technologically innovative
There is no systematic approach to
determining replacement or repair time of designs and solutions
the pipes. Hence, the rule of thumb is used  Pursuing the highest level of work
in making such a vital decision. The quality and excellent service in our
population is increasing, houses are built but
fieldsof specialisation with optimal
the network is not expanded and the existing
ones that were installed for no less than two use of resources
to three decades ago are not maintained.  Maximising returns to skateholder
These compounded the problem of scarcity
of water pipeline in the state. Replacement
or repair of water pipes when they are seen
spilling water cannot solve this lingering
problem. The solution can be achieved by
developing an adequate predictive model for
water pipe replacement. Hence, this research
is aimed at providing a solution to this
problem of replacing pipeline.

Thus, in order to do the pipe replacing, our


company U & I Technologies Sdn Bhd
proposed a pipe replacement project with the
risk assessement of environemental effects.
Thus, we presented the organization
structure of our company team project, our
STRENGTHS & SERVICES WE Design and Engineering
PROVIDE
Our personnel are fully experienced
When we discuss about company’s in the design and engineering of
strengths, we are referring to our company’s petrochemical and power generation
competitive advantages and distinctive facilities, refineries, pharmaceutical
competencies. Some examples of our plants, industrial buildings and
company’s strengths and services include: structures for commercial and
residential projects using the latest
Construction Management technical aids such as. Our
engineering expertise extends to:
One of U&I’s key strengths is in providing
our clients with construction management  civil and structural design:-
professionals, all of whom have many years – foundations,
experience on a wide range of projects – drainage systems,
covering, civil and structural construction, – infrastructures,
petro-chemical plants, power generation, – slope stability,
refineries, off-shore projects, etc. – structural design,
– earth and water retaining
Our services include the provision of a structures.
complete construction management team  architectural design.
covering all basic functions from safety,
 process design, for both green
quality, erection and installation through to
testing and handover, or as individual field and brown field
disciplines to supplement a client’s applications.
organisation.

HSE Management  Metallic Piping


U&I’s HSSE Management System meets the
requirements of both ISO 14001 and
OSHAS 18001 and is certified by
internationally recognised accreditation
agencies.

Our HSSE professionals work closely with


clients to develop hazard identification and
management programmes, HSSE training,
environmental management and compliance
programmes, permit to work systems, and
industrial hygiene programmes.
Non Metallic Piping

U&I fabricates, supplies, installs, tests and


commissions piping systems for petro-
chemical, refinery, semi-conductor, water
and other industrial applications, including:

 process,
 high purity,
 natural gas,
 fuel gas,
 chilled water,
U&I offers a full range of plastic piping
 compressed air, fabrication, joining and installation
 vacuum, capabilities spanning most non-metallic
materials, including: ABS, UPVC, PP, PE,
 sanitary and plumbing, HDPE, PVDF, GRP, GPE and others.
U&I have piping distribution solutions
 hot and cold water systems,
suitable for:
 soil and domestic waste,
 high end water,
 drainage works,
 chemical collection and distribution,
 sewerage works,
 chemical waste,
 rainwater harvesting,  double containment piping systems,
 irrigation.  process waste,
 waste water treatment,
U&I welding capabilities encompass a full  process waste.
range of metal piping which includes carbon
steel, stainless steel, copper, low
temperature service carbon steel, non-
ferrous and other exotic materials.
POTENTIAL TO MANAGE THE Quality Management
PROJECT
Our company is certified to ISO
The potential of success of our company to 9001: Quality Systems Management,
manage the infrastructure project. There are and work on the principle that
some examples of potential of our company Quality is built in to a project – not
to manage the project. bolted on. In recognition if this
principle, OCN’s Quality
professionals have developed a
Structures comprehensive quality programme to
ensure a client’s needs are satisfied
Our company’s experience in structural without compromising HSSE,
steelwork extends from the development of schedule or cost constraints.
basic structural steel design, detail design,
connection design solutions to erection and Apart from a full project
installation work. Our wealth of experience quality assurance and control
in structural design, together with the use of organization, OCN provide
industry-leading design and analysis personnel to conduct vendor
software provides our clients with a reliable assessments and audits, supplier
quality surveillance, review quality
and economic design suited to their
documentation prior to handover,
individual needs and which subsequently and to prepare quality plans and
leads to an efficient erection process. procedures.
To further minimize the potential for
problems during the construction phase, our Project Management
construction supervisors are involved in
U&I provides the full range of
constructability reviews at an early stage of
management services required to
the detail design, where their hands on
realize a project from inception
experience is invaluable in identifying through to client handover. These
construction problems and recommending services can consist of a full team of
safe and cost effective solutions. project management professionals
covering all phases of a project
Accurate and economic fabrication is
providing a single point of contact
assured using the latest computerized cutting
and responsibility, or individual
and profiling equipment which not only discipline teams to manage a part of
saves time and materials in the fabrication a project.
shop, but reduces erection and installation
errors. This, together with our highly Our Project and Discipline Managers
experienced and professional supervision are professionals in their field and
ensures a safe and fast installation bring extensive experience to a
programme. project to ensure that it is completed
within the client’s cost, schedule,
safety and quality expectations.
U&I’s expertise in this work enables us to 1. Establish a clear communication
work with clients in planning the works and flows
in determining the scope to match the
available time frame. Communication is an important element that
is very important in every phase of
construction project. We will need to provide
a communication plan featuring how often
we will check in with the stakeholders about
the status meetings, where it will be held and
many more. It also important in dealing with
the supplier in the plan. The project manager
is also responsible in creating status report,
and also do the planning on how often the
report will be send out and to whom should
be send. This will help you to make the
process smoother and it can reduce the
number of emails and phone calls that will be
receive when a problem arises.

2. Observe and ask questions


In construction site, we will see many
problems regarding the workplace,
construction workers and more. In order to
OUR STRATEGY TO MANAGE avoid such problems happened, we need to
PROJECTS observe how the workers works and give
attention to the results. We need to
Every construction company must have their familiarize ourselves with the construction
own strategy in managing and handling their site and the duties of every professional
project. This strategy is to make sure that they workers that works under us. This managing
can achieve their goals. For the problems that project needs improvement and learning so
arise from the construction site, they need to we should not feel shy to ask. Learning is not
overcome it with strategies in order to make only about the knowledge on construction
the process smoother. site but also learn how to approach workers
so that they will be more passionate to work
under a good project manager.

3. Choosing the right team and


systems
When our plan is done and after making clear After a project has been successfully done,
expectation, we will be able to assign all the the next step that should be done is
task that has been planned to the team evaluating. Each project provides details
member. The role of a project manager is to information that we can utilize for the future.
provide a way to achieve success by This is why, an evaluation and reviewing for
classified them according to their skills, the whole project is really important practice.
talents and personalities for every particular
We need to take note that a success is an
project. We need to bare in mind that all the
alternative for us to make improvement and
skill sets and talents should be parallel with
we need to make sure to consider the return
the specified project requirements.
investment planning in comparing to the
As in dividing the teams, the project manager actual return on investment. When the project
should know that putting too many members managers know what is right or wrong and
in a group will arise problems, so they have also how to make the adjustments, they will
to be suitable numbers in a group. Having a be able to develop a better practice in the
right task management systems is a bonus future.
element in order to achieve success goals in
project managing so the communication
systems in receiving the task should be clear
and needs to be taken care of.

4. Managing risks in project


Every project has its own risks involved. So,
as a project manager, we need to be aware of
these possible risks from the beginning of the
project to reduce the risks and manage it
properly and carefully to ensure the potential
problems do not arise. A skilled project
manager are able to detect the problems
before the project starts and they must have
contingency plans in place so they can take
preventive actions and a safety steps with a
correct measures.